Electrical Permit (Service Upgrade, New Meter Base) in Unincorporated Iron County, Utah

Required for electrical service upgrades, new meter base installations, and other electrical work in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Iron County Fee Schedule (adopted May 26, 2026) does not publish a separate EV-specific fee line item.

Verified 2026-07-03 · Source

When you need this permit

  • Electrical service upgrade or new meter base installation
  • Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical (Service Upgrade, New Meter Base, etc.)Iron County Fee Schedule, adopted May 26, 2026.
B.P. $111.25 + State Fee
Utah State FeeIron County Fee Schedule, adopted May 26, 2026.
1% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit (Service Upgrade, New Meter Base) permit actually take in Unincorporated Iron County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring, panel, and grounding inspection consistent with adopted 2023 NEC; specific county inspection checklist not separately published online as of 2026-07-04.

  2. 2

    Final

    Final electrical inspection.

See the full Unincorporated Iron County inspection guide — scheduling & re-inspection fees →

Tips

  • The Electrical (Service Upgrade, New Meter Base, etc.) fee is a flat $111.25 plus the state fee — a simpler flat-rate structure than Cedar City's per-square-foot residential electrical fee schedule.
  • EV charger (EVSE) installations are treated as standard electrical work and pulled under this same Electrical (Service Upgrade, New Meter Base, etc.) permit — Iron County does not publish a separate EV-charger permit or fee.

Frequently asked questions

Unincorporated Iron County requires an electrical permit (service upgrade, new meter base) for: Electrical service upgrade or new meter base installation; Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with Iron County Building Department at (435) 865-5350 before starting work.

Per the Iron County Fee Schedule (adopted May 26, 2026), the Electrical permit fee for a service upgrade or new meter base is a flat $111.25 plus the 1% Utah State Fee.

Unincorporated Iron County does not publish a plan-review timeline for this permit. Contact Iron County Building Department at (435) 865-5350 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Iron County requires 2 inspection(s) for an electrical permit (service upgrade, new meter base), in order: Rough Electrical, Final. Schedule each through Iron County Building Department ((435) 865-5350).

Apply through Iron County Building Department at 82 N 100 E #102, Cedar City, UT 84720. Phone: (435) 865-5350. Office hours: Monday–Friday, 7:30 AM to 4:30 PM, per ironcountyut.gov/building. Building Official: Terry Palmer; Assistant Building Official/Zoning Officer: Nate Dennett.. Official information: https://ironcountyut.gov/building.

Unincorporated Iron County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C & J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026). Iron County's own building.gov page and forms index do not publish a distinct county code-adoption page; per Utah's Title 15A compliance-agency model, unincorporated Iron County (like unincorporated Washington County in this corpus) is bound by the statewide-adopted specific editions absent its own published amendment.; 2021 International Residential Code (IRC), including Appendix Q — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 revision — only the IRC (and NEC) held at their prior editions while the other codes advanced to 2024 — still the current edition.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains 2023 across the 7/1/2026 statutory rollover (not superseded by a 2024/2026 NEC edition in that cycle) — still the current edition.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This entry previously (as of lastVerified 2026-07-03) correctly flagged that the rollover had occurred in a trailing note, but the individual code lines above it still led with the 2021 editions as the primary/current statement — corrected on this date so the lines themselves state the current editions. Iron County's own building.gov/building page and its Forms index (ironcountyut.gov/building/forms) do not independently republish specific code-edition numbers, so this file reports the statutory default rather than a county-specific citation — flagged here rather than silently assumed identical to Cedar City's page, which does publish its own distinct Current Adopted Codes list.. Local amendments apply — see the Unincorporated Iron County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.