Skip to main content
PermitBase

Commercial Tenant Improvement / Tenant Finish Permit in Unincorporated Iron County, Utah

Required for tenant improvement and remodel work inside an existing commercial building in unincorporated Iron County. Iron County's Fee Schedule does not publish a tenant-improvement-specific line; the county's single 'Remodel' fee line (B.P. Contractor's Estimate, P.C. 40% to 65% + State Fee) is a flat, undifferentiated line applying to any remodel/alteration project regardless of occupancy — unlike new construction, which the same Fee Schedule splits into ten distinct per-square-foot valuation rates by IBC occupancy group. No residential/commercial split, occupancy table, or separate TI-specific line exists anywhere in the document for remodel-type work. (Note: the Fee Schedule PDF's embedded text layer misaligns this exact table when extracted as flowed text, shifting dollar figures onto the wrong row labels — e.g. pairing the 'Finish Basement' label with figures belonging to the 'Remodel'/'Plumbing' rows — so the table should be read from the laid-out pages.) Combined with the $500 Commercial Building Application/Plan Review Submittal Fee (vs. $250 Dwelling), which routes by property/project type per Legend note (d) rather than by new-construction-vs-remodel distinction, this is the operative fee structure for a commercial tenant improvement in unincorporated Iron County.

Verified 2026-08-02 · Source

When you need this permit

  • Tenant improvement or remodel work within an existing commercial building
  • Architectural, structural, plumbing, mechanical, and electrical plans as applicable to the scope of work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Remodel
Iron County Fee Schedule, adopted May 26, 2026, page 2 (Building Department table). Show full citationIron County Fee Schedule, adopted May 26, 2026, page 2 (Building Department table). This section does not copy-paste cleanly — a copy-paste shifts dollar amounts onto adjacent row labels, for example pairing 'Finish Basement' with figures belonging to other rows — so read the figures from the page as published. The line reads: 'Remodel — B.P. Contractor's Estimate, P.C.40% to 65% + State Fee.' This is the only Building Department fee line for remodel or alteration-type work, and it is NOT split by residential vs. commercial or by occupancy classification anywhere in the schedule — unlike new construction, which the same document prices via ten distinct per-square-foot rates by IBC occupancy group (see the commercial-building-permit entry). It is the operative fee mechanism for commercial tenant improvement work by elimination: no other remodel or alteration-type line exists in the document.
B.P. Contractor's Estimate, P.C. 40% to 65% + State Fee
Building Application/Plan Review Submittal Fee (Commercial)Iron County Fee Schedule, adopted May 26, 2026, Legend note (d) — applies to commercial projects generally; not distinguished between new construction and tenant improvement.
$500 (non-refundable, applied to the building permit)
Utah State FeeIron County Fee Schedule, adopted May 26, 2026.
1% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Unincorporated Iron County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Structural

    Verified against submitted plans where the tenant improvement affects structural or fire-rated elements.

  2. 2

    Rough MEP

    Mechanical/electrical/plumbing rough-in applicable to the tenant improvement scope.

  3. 3

    Final

    Final inspection prior to occupancy.

See the full Unincorporated Iron County inspection guide — scheduling & re-inspection fees →

Tips

  • Iron County's 'Remodel' fee line (Contractor's Estimate valuation, Plan Check 40-65%) is a single flat line covering ANY remodel/alteration project — residential or commercial — since the Fee Schedule publishes no separate commercial-remodel or tenant-improvement rate. The columns in this table do not line up in a copy-paste, so read the figures from the fee-schedule page as published.
  • The $500 Commercial Building Application/Plan Review Submittal Fee (versus $250 for a Dwelling) applies to commercial permits generally, including tenant improvement work, per the Fee Schedule's Legend note (d): 'Dwelling ($250) Commercial ($500) Other ($50).'
  • No tenant-improvement-specific application form, checklist, or PDF exists on the county's Forms page (ironcountyut.gov/building/forms) as of 2026-08-02 — the standard Building Permit Application and Building Permit Info Sheet ('building-packet.pdf') cover all project types, including remodels, without a distinct commercial-TI variant.

Frequently asked questions

Unincorporated Iron County requires a commercial tenant improvement / tenant finish permit for: Tenant improvement or remodel work within an existing commercial building; Architectural, structural, plumbing, mechanical, and electrical plans as applicable to the scope of work. If your project isn't listed, confirm with Iron County Building Department at (435) 865-5350 before starting work.

No dedicated tenant-improvement fee line is published. The general 'Remodel' line on the Iron County Fee Schedule (adopted May 26, 2026) — valued at the Contractor's Estimate with a 40% to 65% Plan Check fee — is the confirmed applicable fee, since it is the only Building Department fee line for remodel/alteration work and is not split by residential vs. commercial anywhere in the schedule. A $500 Commercial Building Application/Plan Review Submittal Fee also applies (Legend note (d): 'Dwelling ($250) Commercial ($500) Other ($50)'), plus the 1% Utah State Fee.

Unincorporated Iron County does not publish a plan-review timeline for this permit. Contact Iron County Building Department at (435) 865-5350 for current turnaround.

You'll need: Building Permit Application; Plans for Affected Scope. See the required-documents checklist on this page for details on each.

Unincorporated Iron County requires 3 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Structural, Rough MEP, Final. Schedule each through Iron County Building Department ((435) 865-5350).

Apply through Iron County Building Department at 82 N 100 E #102, Cedar City, UT 84720. Phone: (435) 865-5350. Office hours: Monday–Friday, 7:30 AM to 4:30 PM, per ironcountyut.gov/building. Building Official: Terry Palmer; Assistant Building Official/Zoning Officer: Nate Dennett.. Official information: https://ironcountyut.gov/building.

Unincorporated Iron County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C & J — Utah Code § 15A-2-103(1)(a); the current edition as of July 1, 2026, with the 2021 edition governing through June 30, 2026. Iron County's own building.gov page and forms index publish no distinct county code-adoption page; under Utah's Title 15A compliance-agency model, unincorporated Iron County is bound by the statewide-adopted editions absent its own published amendment.; 2021 International Residential Code (IRC), including Appendix Q — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 revision — only the IRC (and NEC) held at their prior editions while the other codes advanced to 2024 — still the current edition.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains 2023 across the 7/1/2026 statutory rollover (not superseded by a 2024/2026 NEC edition in that cycle) — still the current edition.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; Utah Code § 15A-2-103, in the version headed 'Effective 7/1/2026 / Superseded 1/1/2027', put the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC and ISPSC listed above into effect on July 1, 2026, replacing the 2021 editions; the IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. Iron County's own building.gov/building page and its Forms index (ironcountyut.gov/building/forms) do not republish specific code-edition numbers, so the editions here are the statutory default rather than a county-specific citation — Cedar City, by contrast, does publish its own distinct Current Adopted Codes list.. Local amendments apply — see the Unincorporated Iron County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Iron County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Unincorporated Iron County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Iron County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Iron County lands. Privacy.