Sign Permit — Cottonwood Heights, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://cottonwoodheights.municipalcodeonline.com/book/print?type=ordinances&name=19.82_Signs
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Cottonwood Heights, Utah
Required to erect, convert, or display most signs in Cottonwood Heights under City Code chapter 19.82 (Signs). Monument, wall, and projecting signs are each independently regulated by size/height/setback charts specific to the zoning district. The city's Fee Schedule lists a $150 zoning review fee under 'Signs and building permits.' Re-chased 2026-07-20: the live fee schedule page (previously only reachable via a Wayback snapshot because a direct curl returned HTTP 403) was successfully re-fetched through a reader-proxy, confirming it is CURRENT (not a stale artifact) and that 'Wall signs — $150' remains the only sign-specific line item in the 'Zoning review: Signs and building permits' table — no monument or projecting sign line exists anywhere in that table. The enabling ordinance for the fee schedule (City Code § 3.16.010) was also fetched in full and simply defers to 'the city's consolidated fee schedule, as amended' without itemizing sign sub-types itself, and the full text of City Code § 19.82.140.D (Fees) likewise only states fees 'shall be as specified in the city's consolidated fee schedule' with no further sign-type breakdown. A separate, valuation-based general Building Permit Fee (City Code Title 15, 100% of the IBC building valuation data table) also applies to any sign requiring structural/electrical work, layered on top of whichever zoning-review fee applies. Whether monument and projecting signs are billed under the same $150 'Wall signs' line, a different unpublished amount, or are simply not subject to a distinct zoning-review fee, could not be resolved from any city-published source — this appears to be a genuine gap in the city's own fee schedule rather than a retrieval failure.
Reviewed 2026-07-20 · Source
When you need this permit
- No person may erect, convert, or display a sign unless the department has issued a permit or the sign is exempted under City Code § 19.82.140.F (City Code § 19.82.140.A)
- Monument signs are limited to one per street/highway frontage in NC, CR, O-R-D, PF, RO, and MU zones and at religious institutions, sized per Chart 19.82.03-01 (e.g., NC/CR/PF monument: 36 sq ft, 6 ft max height, 18 in. setback; RO monument: 32 sq ft, 4 ft max height, 36 in. setback)
- Wall signs are limited to an aggregate of 15% of the wall area where displayed, may not project more than 12 inches from the wall, and cabinet signs are not permitted as wall signs (City Code § 19.82.040)
- Projecting signs require at least 8 feet of sidewalk clearance, may project no more than 4 feet from the building (or one-third the sidewalk width, whichever is less), and must not exceed 18 feet in height or the roofline, whichever is lower (City Code § 19.82.050)
- Temporary signs (max 20 sq ft, max 6 ft height) may be displayed for no more than 20 days in any 12 consecutive months and require a permit under § 19.82.140 unless otherwise exempted (City Code §§ 19.82.070, 19.82.125)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
Tips
- City Code § 19.82.140.C says the department must review a completed, paid application 'promptly' and grant or deny it 'promptly' — this is the actual governing standard (no specific number of days exists in the ordinance to find), unlike the general building permit's stated 7-business-day first-review target. Do not assume the two timelines match.
- Cabinet signs are explicitly not permitted as wall signs anywhere in the city (§ 19.82.040), and pole signs, roof signs, portable signs, inflatable signs, and off-premise signs/billboards are prohibited outright (§ 19.82.110).
- Several sign types are exempt from the permit requirement entirely: signs required by law, signs on coin-operated/vending machines or gas pumps, one real estate sign per property (max 6 ft height, 9 sq ft, no lights or changeable copy), property signs, name-plate signs (max 1 sq ft), and civic signs (§ 19.82.120).
- A sign permit issued under this chapter requires any nonconforming sign already on the premises to be modified or removed to conform with the current code (§ 19.82.130.D) — check for legacy nonconforming signage before applying.
- The published fee schedule only itemizes a $150 fee for 'Wall signs' under the Signs and building permits category — re-confirmed live 2026-07-20 (not just via Wayback), and cross-checked against the fee-authorizing ordinance and the sign ordinance's own fee clause, neither of which itemizes monument or projecting signs separately. This looks like a genuine gap in the city's own publication — confirm directly with the city whether monument or projecting signs are billed at the same $150 rate.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cottonwood Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cottonwood Heights
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Cottonwood Heights project checklist
Describe your project once and get every permit, document, and fee it triggers in Cottonwood Heights — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →