Change of Use / Nonconforming Use Permit in Cottonwood Heights, Utah

Cottonwood Heights has no single permit literally named 'Change of Use Permit.' Depending on the specific scenario, a change of use is instead processed through one of several distinct, separately fee'd mechanisms: (1) a Zoning Verification Letter ($150) confirming a property's current zoning/use status; (2) if the change is between two legally nonconforming uses, a Conditional Use application under City Code § 19.88.090(4) ($350 base fee, 'Conditional uses not requiring site plan approval'), reviewed by the Planning Commission; (3) if the change involves addition, enlargement, or reconstruction of a nonconforming building under City Code § 19.88.070, a 'Nonconforming Building or Use Application' ($900), reviewed by the Board of Adjustment / appeals hearing officer; and (4) for an ordinary new-tenant occupancy change in an existing commercial space, a Commercial Business License Change (Major Change, $170) that triggers zoning, fire, and health department review when the change involves a location/use change (vs. a $50 Minor Change for name/ownership changes requiring no departmental review). A same-use or code-conforming occupancy-classification change accompanied by construction is instead processed as the Commercial or Commercial Tenant Improvement Building Permit.

Verified 2026-07-21 · Source

When you need this permit

  • No construction, only a zoning-status question: file for a Zoning Verification Letter ($150) confirming the property's current zoning/use status for a lender, buyer, or tenant
  • Change from one legally nonconforming use to another nonconforming use: subject to Planning Commission review as a Conditional Use per City Code § 19.88.090(4), which cross-references Chapters 19.78 (Conditional Uses) and 19.84 (Board of Adjustment)
  • Change to a use allowed in the most restrictive zone where the existing nonconforming use is allowed: Planning Commission must find the new use 'would not be more intensive than the most recent existing legal nonconforming use,' per City Code § 19.88.090
  • Addition, enlargement, or reconstruction of a nonconforming building or use: requires a permit authorized by the appeals hearing officer after a hearing, per City Code § 19.88.070, funded by the 'Nonconforming Building or Use Application' fee under the Fee Schedule's Board of Adjustment section
  • New tenant/business occupying an existing commercial space with a location or use change: file a Commercial Business License Change (Major Change) triggering zoning, fire, and health department review
  • Use change accompanied by construction or a change in IBC occupancy classification: processed as the standard Commercial Building Permit or Commercial Tenant Improvement Permit rather than as a standalone change-of-use product

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

Zoning Verification LetterCottonwood Heights official Fee Schedule page, Zoning review section: 'Zoning verification letter — $150.' Confirms current zoning/use status; not a construction-code Certificate of Occupancy.
$150
Conditional Use (change of nonconforming use to another nonconforming use)Cottonwood Heights official Fee Schedule page: 'Conditional uses not requiring site plan approval — $350 base fee (covers two staff and engineering reviews)' plus a separate 'Conditional use application noticing fee — $150' in addition to the application fee. City Code § 19.88.090(4) requires this pathway when a nonconforming use changes to another nonconforming use.
$350 base fee, plus $150 noticing fee
Nonconforming Building or Use Application (Board of Adjustment)Cottonwood Heights official Fee Schedule page, Board of Adjustment section: 'Nonconforming building or use application — $900,' alongside 'Appeal — $600' and 'Variance application — $900' in the same section. This funds the City Code § 19.88.070 process (addition, enlargement, or reconstruction of a nonconforming building/use via the appeals hearing officer) — distinct from the Planning Commission's Conditional Use track under § 19.88.090.
$900
Commercial Business License Change — Major ChangeCottonwood Heights official Fee Schedule page, Community and Economic Development section: Major Change fee applies to changes such as business location changes that necessitate zoning, fire, and health department review — the closest city-published analog to a same-space change-of-use/occupant review for an ordinary (non-nonconforming) tenant change.
$170
Commercial Business License Change — Minor ChangeCottonwood Heights official Fee Schedule page: Minor Change fee applies to name or ownership changes that do not require zoning, fire, or health department evaluation — included here for contrast; this tier does NOT represent a change of use.
$50

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Nonconforming Use Permit permit actually take in Cottonwood Heights?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Cottonwood Heights has no single product literally named 'Change of Use Permit' — which mechanism applies depends entirely on the specific scenario (see requirements above); confirm the correct pathway with Community and Economic Development (801-944-7062) before applying.
    • A change between two nonconforming uses goes to the Planning Commission as a Conditional Use ($350 base fee) per City Code § 19.88.090(4); an addition, enlargement, or reconstruction of a nonconforming building instead goes to the Board of Adjustment / appeals hearing officer as a distinct $900 'Nonconforming Building or Use Application' per § 19.88.070 — these are NOT the same process or fee despite both arising under Chapter 19.88.
    • For an ordinary new tenant moving into an existing, non-nonconforming commercial space, the relevant mechanism is typically the $170 Commercial Business License Change (Major Change) which triggers zoning, fire, and health department review — not a Planning Commission or Board of Adjustment hearing.
    • If construction accompanies the use change (e.g. new walls, new occupancy-classification build-out), it is processed as the standard Commercial Building Permit or Commercial Tenant Improvement Permit rather than as a standalone change-of-use product — see those permit types in this file.

    Frequently asked questions

    Cottonwood Heights requires a change of use / nonconforming use permit for: No construction, only a zoning-status question: file for a Zoning Verification Letter ($150) confirming the property's current zoning/use status for a lender, buyer, or tenant; Change from one legally nonconforming use to another nonconforming use: subject to Planning Commission review as a Conditional Use per City Code § 19.88.090(4), which cross-references Chapters 19.78 (Conditional Uses) and 19.84 (Board of Adjustment); Change to a use allowed in the most restrictive zone where the existing nonconforming use is allowed: Planning Commission must find the new use 'would not be more intensive than the most recent existing legal nonconforming use,' per City Code § 19.88.090; Addition, enlargement, or reconstruction of a nonconforming building or use: requires a permit authorized by the appeals hearing officer after a hearing, per City Code § 19.88.070, funded by the 'Nonconforming Building or Use Application' fee under the Fee Schedule's Board of Adjustment section; New tenant/business occupying an existing commercial space with a location or use change: file a Commercial Business License Change (Major Change) triggering zoning, fire, and health department review; Use change accompanied by construction or a change in IBC occupancy classification: processed as the standard Commercial Building Permit or Commercial Tenant Improvement Permit rather than as a standalone change-of-use product. If your project isn't listed, confirm with Cottonwood Heights Community and Economic Development (CED) — Building Permit Division, staffed by a contracted Building Official (James Short, Sunrise Engineering) at 801-944-7062 before starting work.

    It depends on the pathway: changing one nonconforming use to another nonconforming use is a $350 base-fee Conditional Use reviewed by the Planning Commission (City Code § 19.88.090(4)); adding to, enlarging, or reconstructing a nonconforming building is a separate $900 Nonconforming Building or Use Application reviewed by the Board of Adjustment / appeals hearing officer (§ 19.88.070).

    Cottonwood Heights does not publish a plan-review timeline for this permit. Contact Cottonwood Heights Community and Economic Development (CED) — Building Permit Division, staffed by a contracted Building Official (James Short, Sunrise Engineering) at 801-944-7062 for current turnaround.

    Depending on your project, Cottonwood Heights may also ask for: Zoning Verification Letter Request; Conditional Use Application; Nonconforming Building or Use Application; Commercial Business License Change Application. See the required-documents checklist on this page for details on each.

    Apply through Cottonwood Heights Community and Economic Development (CED) — Building Permit Division, staffed by a contracted Building Official (James Short, Sunrise Engineering) at 2277 E Bengal Blvd, Cottonwood Heights, UT 84121. Phone: 801-944-7062. Office hours: City Hall regular business hours (specific daily hours not published on the Building Permits or Codes and Standards pages as of the dates verified below); contact 801-944-7060 (codes/standards) or 801-944-7062 (permits) to confirm.. Official information: https://www.cottonwoodheights.utah.gov/city-services/building-permits/.

    Cottonwood Heights, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Cottonwood Heights' own Building Codes and Standards page, live-checked 2026-07-16, still lists '2021 International Building Code' verbatim — the city's page has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city page's lag.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the city's Building Codes and Standards page (live-checked 2026-07-16: '2021 International Residential Code').; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on the city's own Building Codes and Standards page, added here per statute.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. The city's Building Codes and Standards page still lists '2021 International Mechanical Code' — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. The city's Building Codes and Standards page still lists '2021 International Fuel Gas Code' — live-checked 2026-07-16, confirming lag. The statute controls.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. The city's Building Codes and Standards page still lists '2021 International Plumbing Code' — live-checked 2026-07-16, confirming lag. The statute controls.; 2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). The city's Building Codes and Standards page lists '2020 National Electric Code' — one edition behind the statewide-mandatory floor, confirmed still unchanged via live-check 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding the 2018 IECC. The city's Building Codes and Standards page still lists '2018 international energy conservation code' — live-checked 2026-07-16, confirming lag (this was already one edition behind the pre-7/1/2026 2021 IECC baseline other Salt Lake County cities used, and is now two editions behind current). The statute controls.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not listed on the city's own Building Codes and Standards page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not listed on the city's own Building Codes and Standards page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.; Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed on the city's own Building Codes and Standards page, added here per statute.; 2018 International Fire Code (IFC), with Utah state amendments — per the city's official Building Codes and Standards page (live-checked 2026-07-16, unchanged). NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the city, no statutory edition change applies via § 15A-2-103.; 2017 ANSI ICC A117.1 Accessible and Usable Buildings and Facilities (referenced on the codes page as '2017 ANSI ADA CODE') — per the city's official Building Codes and Standards page, live-checked 2026-07-16, unchanged.; 2009 ANSI A117.1 Standard for Accessible and Usable Buildings and Facilities — also separately listed on the same official codes page (both 2017 and 2009 editions appear on the city's current list; reproduced verbatim rather than reconciled, since only the city's own text is authoritative here). Live-checked 2026-07-16, unchanged.; 2015 Uniform Code for the Abatement of Dangerous Buildings — per the city's official Building Codes and Standards page, live-checked 2026-07-16, unchanged.; Cottonwood Heights Code of Ordinances (local amendments to the above, referenced but not separately itemized on the Codes and Standards page) — see localAmendments below.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. The city's Building Codes and Standards page (cottonwoodheights.utah.gov/city-services/building/codes-and-standards) was live-checked 2026-07-16 via real-browser navigation and confirmed still lagging — it verbatim lists 2021 IBC/IMC/IFGC/IPC/IRC, 2020 National Electric Code, and 2018 IECC, and omits IEBC and ISPSC entirely. The statewide statute controls over the city's un-updated page; the prior version of this array presented the city's stale figures as simply 'the city's own page controls' without flagging that the statute itself had moved past them — this entry corrects that.. Local amendments apply — see the Cottonwood Heights overview page for the full list.

    Not as a single named product. Depending on the scenario, a change of use is processed as a Zoning Verification Letter ($150), a Conditional Use application under City Code § 19.88.090(4) if changing between two nonconforming uses ($350 base fee), a Nonconforming Building or Use Application under § 19.88.070 if altering a nonconforming building ($900, Board of Adjustment), or a Commercial Business License Change (Major Change, $170) for an ordinary new tenant/use change in an existing commercial space.