EV Charger / EVSE Permit — Cottonwood Heights, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.cottonwoodheights.utah.gov/doing-business/fee-schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Cottonwood Heights, Utah
Cottonwood Heights does not publish a separate EV-charger/EVSE permit or fee category. Installing an EV charger is electrical work and is processed under the city's general Electrical, Mechanical & Plumbing Permit — the city's own Fee Schedule page and Codes and Standards guidance (live-checked 2026-07-19) confirm there is no EV-specific line item or process, and this permit type exists here so EV charger installs are searchable in their own right.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Cottonwood Heights
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Online application via the city's iWorq Building Permit Application portal, filed as an Electrical, Mechanical & Plumbing Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Field inspection of the EV charger circuit and installation, requested online via the 'Inspection Requests/Details' portal (numeric-only permit number, no dashes).
Tips
- Cottonwood Heights has no separate EV-charger permit or fee category — file the installation as an Electrical, Mechanical & Plumbing Permit.
- Bundling the electrical work with an active building permit application is cheaper (5% of base fee) than applying separately, which instead follows the full IBC valuation-based schedule.
- Confirm before applying whether Rocky Mountain Power or another utility requires separate notification for a new EV charging circuit, which is outside the scope of the city permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cottonwood Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cottonwood Heights
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Cottonwood Heights project checklist
Describe your project once and get every permit, document, and fee it triggers in Cottonwood Heights — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →