Mechanical / HVAC Permit in Riverton, Utah

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Riverton. Governed by the 2024 International Mechanical Code (IMC) adopted per Riverton City Code § 15.10.010, effective 2026-07-01 (superseded the 2021 edition).

Verified 2026-07-01 · Source

When you need this permit

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood stove installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit — valuation-basedGrounded, published valuation-based fee — verified against the full text of Riverton City's FY2025-26 Adopted Fee Schedule (BUILDING section, lines 165-185): no standalone flat 'Mechanical Permit' line exists; all mechanical/HVAC/trade work is charged via the same UBC 1-A valuation table as the building permit (line 165). Confirmed absent from the Building Applications & Permits page (applications.php) and the Fees & Taxes index (fees-and-taxes.php) as well — no separate mechanical fee published anywhere on rivertonutah.gov.
Assessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD Table
Re-Inspection FeeRiverton City FY2025-26 Adopted Fee Schedule, line 180
$50.00 per occurrence

Review timeline

Plan reviewTypical estimate — confirm current times with the Riverton building department
~1–7 business days

How long did your Mechanical / HVAC Permit permit actually take in Riverton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Mechanical Rough-In

    After all duct, vents, flues, and combustion air are installed that will not be exposed for final.

  2. 2

    Final

    Equipment operational, combustion air verified, gas pressure tested, thermostat functional.

See the full Riverton inspection guide — scheduling & re-inspection fees →

Tips

  • Like-for-like furnace and AC replacements in Riverton still require a mechanical permit.
  • Riverton follows the 2024 IMC, effective July 1, 2026 (superseded the 2021 edition).
  • Gas line work tied to a mechanical appliance may also require a gas permit inspection — confirm with Riverton Building.
  • Provide approved plans, Manual J, and equipment specs at all mechanical inspections per Riverton's Required Inspections document.

Frequently asked questions

Yes. Riverton requires a mechanical permit for all furnace replacements, including same-model swaps. The fee is valuation-based using the 1994 Modified UBC 1-A table. Contact building@rivertonutah.gov for an estimate.

Riverton does not publish a separate flat mechanical permit fee. Mechanical permits are valuation-based using the 1994 Modified UBC 1-A Fee Table. Re-inspection fees are $50. Contact building@rivertonutah.gov for an estimate based on your scope of work.

Plan review for a mechanical / hvac permit in Riverton typically runs 1–7 business days. This is an estimate, not a published figure — confirm current review times with Riverton City Building Division at (801) 208-3138.

You'll need: Building Permit Application. Depending on your project, Riverton may also ask for: Manual J Load Calculation; Equipment Specifications. See the required-documents checklist on this page for details on each.

Riverton requires 2 inspection(s) for a mechanical / hvac permit, in order: Mechanical Rough-In, Final. Schedule each through Riverton City Building Division ((801) 208-3138).

Apply through Riverton City Building Division at 12830 S Redwood Road, Room 105, Riverton, UT 84065. Phone: (801) 208-3138, email: building@rivertonutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.rivertonutah.gov/building/.

Riverton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Riverton City Code § 15.10.010 (dynamic adoption clause: 'the most recent version... adopted by the state of Utah... [with] adoption of updated versions by the state of Utah after the date of this chapter [having] the effect of updating Riverton City's building code(s)'); Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; 2021 International Residential Code (IRC), including Appendices AE and AQ — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(b)/(c)/(k); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; 2024 International Mechanical Code (IMC) — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; 2024 International Fuel Gas Code (IFGC) — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide adoption; unchanged by the 7/1/2026 code cycle; also listed on rivertonutah.gov/building/code.php; Residential provisions of Chapter 11, Energy Efficiency, of the 2015 International Residential Code — rivertonutah.gov/building/code.php item 7 (verified live 2026-07-16, wording unchanged from before this fix); Riverton's own residential-energy baseline citation, distinct from the statewide IECC line below and NOT altered by the 7/1/2026 code cycle per the city's own current page; 2024 International Energy Conservation Code (IECC), commercial provisions — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; 2024 International Existing Building Code (IEBC) — Riverton City Code § 15.10.010; Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; ICC/ANSI A117.1-2009 — rivertonutah.gov/building/code.php item 10; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition that had been in effect since July 1, 2023; NOTE (verified 2026-07-16): Riverton's own 'Building Codes in Use in Riverton City' list at rivertonutah.gov/building/code.php is headed 'Effective July 1, 2023' and still enumerates the 2021 IBC/IRC/IPC/IMC/IFGC, 2021 IEBC, and 2021 ISPSC, plus 'Commercial provisions of the 2021 International Energy Conservation Code' — that page has NOT been updated for the 7/1/2026 code cycle. However, Riverton City Code § 15.10.010 itself dynamically adopts 'the most recent version... adopted by the state of Utah' and states that state updates automatically update Riverton's code with no separate city action required — so as a matter of law the 2024 editions already govern in Riverton regardless of the outdated summary page. Confirmed directly against Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027) at le.utah.gov.. Local amendments apply — see the Riverton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.