Change of Use / Certificate of Occupancy Compliance — Riverton, Utah · Requirements sheet
Verified 2026-07-22 · Source: https://www.rivertonutah.gov/business/licensing/commercial.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Certificate of Occupancy Compliance in Riverton, Utah
Riverton does not publish a standalone "Change of Use" permit, application, or fee — a full-text read of the FY2026-2027 Adopted Fee Schedule (all 314 line items across General Government, Planning & Zoning, Building, and Engineering) and the Planning & Zoning Applications page confirms no line item or downloadable application named "Change of Use," "Zoning Verification," or "Certificate of Occupancy." Instead, a change of use for an existing commercial building is governed through two folded-in city processes: (1) the Commercial Business License application, whose published Step 1 is a Zoning Verification review by Development Services/Planning confirming the new use complies with Riverton's land use and zoning ordinances (Riverton City Code Title 18) — performed at no charge, since the Commercial and Home-Based Business License application/renewal fee is $0.00 per the Adopted Fee Schedule (lines 1-2, in effect since July 2017/2018); and (2) for new construction or an occupancy-classification change, the Certificate of Occupancy Commercial Checklist — a multi-department/agency sign-off process (Building, Planning, Public Works-Bonding, LTSWMP, LDP & SWPPP, Engineering, Water/Meter Set, Fire, Backflow, and as-needed Jordan Basin Improvement District, Salt Lake County Health Department, State Boiler/Elevator Inspector, and Special Inspection Agency) that the Building Official must receive electronic approval on before a Certificate of Occupancy is issued. No separate CO fee is published; the standard $50 Inspections and $50 Re-Inspection line items (Adopted Fee Schedule, lines 179-180) cover this. If the change of use also involves construction or a Commercial Tenant Improvement, the valuation-based Building Permit fee (1994 Modified UBC 1-A Table) documented under Riverton's Residential Building Permit entry applies, including the Lot-Specific Geotechnical Soils Report required on all commercial building permits (rivertonutah.gov/building/index.php). Separately, Riverton City Code § 18.135.100(10) ("Change of Use," within Chapter 18.135, General Regulations) addresses change of use in the narrower context of nonconforming uses: "The nonconforming use of a building or structure may not be changed except to a conforming use, but where such change is made, the use shall not thereafter be changed back to a nonconforming use."
Verified 2026-07-22 · Source
When you need this permit
- New tenant or business use in an existing commercial building — Step 1 of the Commercial Business License process is a Zoning Verification review confirming the proposed use complies with Riverton's zoning ordinance; contact Development Services/Planning at (801) 208-3149 or planning@rivertonutah.gov
- For new construction, or a change of use accompanied by remodeling, a Certificate of Occupancy must be issued before a Riverton business license can be issued — per the Commercial Business License Application page
- All required department/agency sign-offs on the Certificate of Occupancy Commercial Checklist (Building, Planning, Public Works-Bonding, LTSWMP, LDP & SWPPP, Engineering, Water/Meter Set, Fire, Backflow, and any as-needed agencies) must be completed and electronically approved by the Building Official before occupancy is allowed
- A separate Commercial Tenant Improvement / Building Permit from the Building Department is required if the use change involves remodeling, new fixtures, or an occupancy-classification change
- If the change is from a legal nonconforming use, Riverton City Code § 18.135.100(10) permits changing only to a conforming use, and the use may not thereafter revert to nonconforming status
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Zoning Verification (Planning Department)
Development Services/Planning confirms the proposed use complies with Riverton's zoning ordinance — required before a business license is issued for the new use.
- 2
Certificate of Occupancy Commercial Checklist Sign-offs
For new construction or an occupancy-classification change, the Building Official must receive electronic approval from each required department/agency (Public Works-Bonding, Planning, LTSWMP, LDP & SWPPP, Engineering, Water/Meter Set, Fire, Backflow Technician, and — as needed — Jordan Basin Improvement District, Salt Lake County Health Department, State Boiler Inspector, State Elevator Inspector, and Special Inspection Agency) before a Certificate of Occupancy is issued.
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- Riverton charges $0.00 for both Commercial and Home-Based Business License applications and renewals — the Zoning Verification review that functions as Riverton's change-of-use check is folded into that free Step 1 review, with no distinct "Change of Use" fee.
- Confirm your intended use is zoning-compliant with Development Services/Planning at (801) 208-3149 or planning@rivertonutah.gov before signing a lease — this is Step 1 of the Commercial Business License process and must clear before your license is issued.
- For new construction, a Certificate of Occupancy must be issued before a Riverton business license can be issued — budget lead time for the Certificate of Occupancy Commercial Checklist, which requires sign-off from up to a dozen departments and agencies including the Unified Fire Authority, Public Works-Bonding, Planning, and (as needed) the State Boiler/Elevator Inspector and Salt Lake County Health Department.
- A Lot-Specific Geotechnical Soils Report is required on all commercial building permits in Riverton — factor this in if your change of use triggers a new commercial building permit or Tenant Improvement.
- Late commercial business license renewal (30+ days late) carries a $100 fee per the Adopted Fee Schedule.
- Riverton City Code § 18.135.100(10) governs change of use only in the narrower context of legal nonconforming uses: a nonconforming use may be changed to a conforming use, but may not later revert to nonconforming status.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
Change of Use / Certificate of Occupancy Compliance in other cities
Compare change of use / certificate of occupancy compliance fees across Utah →
Look up this fee in a different city →