Taylorsville building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Taylorsville, Utah.
Verified 2026-06-30 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 2600 Taylorsville Blvd., Taylorsville, UT 84129
- Phone
- (801) 955-2030
- Office hours
- Mon–Fri 8:00 a.m. – 5:00 p.m.; Inspections 9:00 a.m. – 4:00 p.m.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for certificate of occupancy
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Framing
After framing, sheathing, and roof installed.
- 3
Final
All work complete before occupancy.
Applies to: Change of Use Permit
- 1
Unified Fire Authority Inspection
Onsite inspection required for all commercial businesses, verifying exit signage, unblocked exit corridors, approved fire extinguishers, and functioning fire suppression sprinklers, before business license issuance.
- 2
Building Division Final / Certificate of Occupancy Inspection
Required only if tenant improvements were performed for the new use — confirms the completed work complies with the approved building permit before occupancy begins.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Structural
Where applicable to the tenant-improvement scope, before close-in.
- 2
Final
All work complete before occupancy.
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects are complete and any required asbestos/DAQ clearance is obtained before work begins
- 2
Final / Site Clear
Site cleared, foundation removed or capped, site conditions verified
Applies to: Electrical Service Permit
- 1
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 2
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Applies to: EV Charger / EVSE Permit
- 1
Service / Panel
Panel/circuit installation and grounding electrode system inspection for the EVSE circuit.
- 2
Final
Charger mounted and energized, GFCI/breaker protection verified.
Applies to: Fire Sprinkler & Fire Alarm Permit
- 1
Rough-In / Underground
Underground supply piping and rough sprinkler or alarm wiring inspected before concealment; Material and Test Certificates required for aboveground/underground piping.
- 2
Final Acceptance Test
Full system functional/acceptance test witnessed by UFA; Record of Completion form executed for fire alarm systems before the system is placed in service.
Applies to: Gas Line Permit
- 1
Rough-In / Pressure Test
Piping installed, pressure tested — no leaks before concealment
- 2
Final
Appliances connected, gas flowing, leak check complete, proper drip legs installed
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding
- 2
Final
Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern
Applies to: Sign Permit
- 1
Final (permanent signs with electrical/footings/engineering)
Confirms sign placement and construction conform to the permit application and applicable building/safety codes, per § 13.26.110(B)(1)
- 1
Temporary sign tag verification
Approved temporary signs receive a city-issued tag that must be displayed for the duration of the approved period; inspected for conformance with the approval, per § 13.26.110(B)(2)
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
Final inspection only: Fence Permit, Water Heater Permit, Window & Door Replacement Permit
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylorsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Taylorsville building permits
Get alerts for Taylorsville
We'll email you when Taylorsville's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.