Commercial Building Permit — Taylorsville, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.taylorsvilleut.gov/home/showdocument?id=10939
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Taylorsville, Utah
Required for new commercial construction in Taylorsville. The building permit fee uses the same valuation-based table applied to all building permits; commercial project valuation is separately computed via the IBC 2008 Building Valuation Table (Square Foot Construction Costs) by occupancy group and construction type, per the city's Consolidated Fee Schedule (Revised & Approved March 19, 2026).
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction
- Design professional (architect) stamp required for spaces 3,000 sq ft or larger, per state law; engineer stamp for structural changes
- Commercial Site Plan Checklist items: grading/drainage, utility plan, elevations, lighting/photometrics, landscape/irrigation; SWPPP required for disturbance of 1 acre or more
- Compliance with the state-adopted IBC per Utah Code § 15A-2-103
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 7 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Framing
After framing, sheathing, and roof installed.
- 3
Final
All work complete before occupancy.
See the full Taylorsville inspection guide — scheduling & re-inspection fees →
Tips
- Commercial project valuation is computed via the IBC 2008 Building Valuation Table (Square Foot Construction Costs) by occupancy group and construction type — shell-only buildings deduct 20% from that computed valuation before the building-permit fee table is applied.
- Taylorsville publishes no separate plan-review percentage fee (unlike West Jordan's 65% Non-Residential rate) — the valuation-based building-permit fee table is the only published charge.
- Allow at most 10 business days for plan review per the Building Department's general 'PLAN REVIEW TIME FRAME' notice; resubmitting plans resets the review clock.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylorsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Taylorsville.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Taylorsville
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →