Skip to main content
PermitBase

Water Heater Permit in Taylorsville, Utah

Required for water heater installation or replacement (standard tank and tankless) in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

When you need this permit

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet — 0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Hot Water Heater (Standard and Tankless) — Flat FeeTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'
$60.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Taylorsville building department
~1–2 business days

How long did your Water Heater Permit permit actually take in Taylorsville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verify proper installation, venting, T&P valve discharge, gas connections, and seismic strapping

See the full Taylorsville inspection guide — scheduling & re-inspection fees →

Tips

  • Taylorsville's water heater permit is a flat $60 fee for both standard tank and tankless water heaters.
  • Gas water heaters require proper venting — high-efficiency units use PVC/CPVC vent; standard units use metal B-vent.
  • Seismic strapping is required in Utah: two straps, at the upper third and lower third of the tank.
  • T&P relief valve must discharge to within 6 inches of the floor or to the exterior per the adopted plumbing code.
  • Utah allows homeowners to perform plumbing work on their own primary residence, but a permit and inspection are still required.
  • If gas line work is also required, a separate Gas Line permit ($60 flat fee) may apply.

Frequently asked questions

Yes. Taylorsville requires a permit for all water heater replacements and installations, including like-for-like swaps. The flat fee is $60 per the Consolidated Fee Schedule (Revised & Approved March 19, 2026).

The water heater permit fee in Taylorsville is a flat $60 for both standard tank and tankless heaters, per the Consolidated Fee Schedule (Revised & Approved March 19, 2026).

Plan review for a water heater permit in Taylorsville typically runs 1–2 business days. This is an estimate, not a published figure — confirm current review times with Taylorsville City Building Department at (801) 955-2030.

You'll need: Permit Application. Depending on your project, Taylorsville may also ask for: Equipment Specifications. See the required-documents checklist on this page for details on each.

Taylorsville requires 1 inspection(s) for a water heater permit, in order: Final. Schedule each through Taylorsville City Building Department ((801) 955-2030).

Apply through Taylorsville City Building Department at 2600 Taylorsville Blvd., Taylorsville, UT 84129. Phone: (801) 955-2030, email: mcortez@taylorsvilleut.gov. Office hours: Mon–Fri 8:00 a.m. – 5:00 p.m.; Inspections 9:00 a.m. – 4:00 p.m.. Official information: https://www.taylorsvilleut.gov/government/building-department.

Taylorsville, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); current as of 7/1/2026. The Taylorsville Building Department page (taylorsvilleut.gov/government/building-department) states the current statewide code table verbatim: '2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.' Supersedes the 2021 IBC, which governed through 6/30/2026.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); the 7/1/2026 code cycle did not change this edition. Taylorsville's own building page also lists '2021 I.R.C.'; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current as of 7/1/2026 per the Taylorsville Building Department page. Supersedes the 2021 IPC, which governed through 6/30/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current from 7/1/2026 and listed on the Taylorsville Building Department page. Supersedes the 2021 IMC, which governed through 6/30/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); in force from 7/1/2026, per the Taylorsville Building Department page. Supersedes the 2021 IFGC, which governed through 6/30/2026.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current as of 7/1/2026 and listed on the Taylorsville Building Department page. ONE statewide edition — the statute does not split residential and commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle statewide. CORRECTION (2026-07-20, supersedes the 2026-07-16 note below): the 07-16 edit claimed Taylorsville's page had been updated to 'correctly' list 2023 N.E.C. and that the prior 2020-NEC lag was resolved — that was wrong. The page genuinely contradicts itself and still does as of this re-check: a summary table near the top states the statewide-adopted codes verbatim ('2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.'), but the page's own FAQ section separately answers 'What codes and standards does the building department use?' with: 'Currently we are using the 2021 I-codes with 2017 A.N.S.I. 117.1 as the accessibility standard, and the 2020 National Electrical Code.' Confirmed via a 2026-07-08 Wayback snapshot (predating the 07-16 edit) already showing that exact FAQ text, and independently re-confirmed live 2026-07-20 — the page has not changed; the 07-16 edit simply picked one side of an internal contradiction and declared it resolved. Reported here as-is rather than guessing which statement the department actually enforces in practice.; But that table is not the whole story — see the NEC line's correction above for the page's separate, contradicting FAQ answer, which claims the department is 'currently using' the 2021 I-codes generally (not just for NEC). Treat every 'current as of 7/1/2026' framing above as citing the summary table specifically, not as a claim that Taylorsville's practice has been independently confirmed to match it. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either — that part of the original 07-16 note still holds..

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylorsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Taylorsville's permit history is searchable by address

10,496 permits in our copy of Taylorsville's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Taylorsville has issued.

10,490 of these 10,496 permits — 99.9% — carry an issued date, and those run from 2016 to 2026. The remaining 6 have no date at all.

Get Property AccessFree with a signed-in account · the guide above stays free