Fence Permit in Taylorsville, Utah

Required for new fence installation and fence replacement in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

When you need this permit

  • New fence construction
  • Fence replacement that changes height, location, or material
  • Fences over 6 feet in height in any zone

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fences — Flat FeeTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'
$60.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Taylorsville building department
~1–5 business days

How long did your Fence Permit permit actually take in Taylorsville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Fence installed per approved plan — height, setbacks, and materials verified

See the full Taylorsville inspection guide — scheduling & re-inspection fees →

Tips

  • Taylorsville's fence permit is a flat $60 fee.
  • Contact the Community Development Department at taylorsvilleut.gov/government/community-development or (801) 963-5400 for zone-specific fence height and setback requirements.
  • The 'P-22: Residential Fencing Standards' information form is available at the Information Forms page and covers height limits and sight-triangle restrictions.
  • Call 811 before digging fence post holes to locate underground utilities.

Frequently asked questions

Yes. Taylorsville requires a fence permit for new fence construction and replacements. The flat fee is $60 per the Consolidated Fee Schedule (Revised & Approved March 19, 2026).

The fence permit fee in Taylorsville is a flat $60 per the Consolidated Fee Schedule (Revised & Approved March 19, 2026).

Plan review for a fence permit in Taylorsville typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with Taylorsville City Building Department at (801) 955-2030.

You'll need: Permit Application. Depending on your project, Taylorsville may also ask for: Site Plan. See the required-documents checklist on this page for details on each.

Taylorsville requires 1 inspection(s) for a fence permit, in order: Final. Schedule each through Taylorsville City Building Department ((801) 955-2030).

Apply through Taylorsville City Building Department at 2600 Taylorsville Blvd., Taylorsville, UT 84129. Phone: (801) 955-2030, email: mcortez@taylorsvilleut.gov. Office hours: Mon–Fri 8:00 a.m. – 5:00 p.m.; Inspections 9:00 a.m. – 4:00 p.m.. Official information: https://www.taylorsvilleut.gov/government/building-department.

Taylorsville, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026. Confirmed live on the Taylorsville Building Department page (taylorsvilleut.gov/government/building-department, re-fetched 2026-07-16), which itself now states the current statewide code table verbatim: '2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.' Supersedes the 2021 IBC, which governed through 6/30/2026.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — confirmed both by the live statute and by Taylorsville's own building page (re-fetched 2026-07-16, listing '2021 I.R.C.').; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). ONE statewide edition — the statute does not split residential/commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle statewide. CORRECTION (2026-07-20, supersedes the 2026-07-16 note below): the 07-16 edit claimed Taylorsville's page had been updated to 'correctly' list 2023 N.E.C. and that the prior 2020-NEC lag was resolved — that was wrong. The page genuinely contradicts itself and still does as of this re-check: a summary table near the top states the statewide-adopted codes verbatim ('2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.'), but the page's own FAQ section separately answers 'What codes and standards does the building department use?' with: 'Currently we are using the 2021 I-codes with 2017 A.N.S.I. 117.1 as the accessibility standard, and the 2020 National Electrical Code.' Confirmed via a 2026-07-08 Wayback snapshot (predating the 07-16 edit) already showing that exact FAQ text, and independently re-confirmed live 2026-07-20 — the page has not changed; the 07-16 edit simply picked one side of an internal contradiction and declared it resolved. Reported here as-is rather than guessing which statement the department actually enforces in practice.; NOTE (2026-07-20, supersedes the 2026-07-16 corpus-staleness note below): the IBC/IRC/IPC/IMC/IFGC/IECC lines above match the page's top summary table verbatim, independently re-confirmed 2026-07-20. But that table is not the whole story — see the NEC line's correction above for the page's separate, contradicting FAQ answer, which claims the department is 'currently using' the 2021 I-codes generally (not just for NEC). Treat every 'current as of 7/1/2026' framing above as citing the summary table specifically, not as a claim that Taylorsville's practice has been independently confirmed to match it. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either — that part of the original 07-16 note still holds..

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylorsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.