Building department

Address
2600 Taylorsville Blvd., Taylorsville, UT 84129
Phone
(801) 955-2030
Office hours
Mon–Fri 8:00 a.m. – 5:00 p.m.; Inspections 9:00 a.m. – 4:00 p.m.

Inspection guide

See how inspections work in Taylorsville — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026. Confirmed live on the Taylorsville Building Department page (taylorsvilleut.gov/government/building-department, re-fetched 2026-07-16), which itself now states the current statewide code table verbatim: '2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.' Supersedes the 2021 IBC, which governed through 6/30/2026.
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — confirmed both by the live statute and by Taylorsville's own building page (re-fetched 2026-07-16, listing '2021 I.R.C.').
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). ONE statewide edition — the statute does not split residential/commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle statewide. CORRECTION (2026-07-20, supersedes the 2026-07-16 note below): the 07-16 edit claimed Taylorsville's page had been updated to 'correctly' list 2023 N.E.C. and that the prior 2020-NEC lag was resolved — that was wrong. The page genuinely contradicts itself and still does as of this re-check: a summary table near the top states the statewide-adopted codes verbatim ('2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.'), but the page's own FAQ section separately answers 'What codes and standards does the building department use?' with: 'Currently we are using the 2021 I-codes with 2017 A.N.S.I. 117.1 as the accessibility standard, and the 2020 National Electrical Code.' Confirmed via a 2026-07-08 Wayback snapshot (predating the 07-16 edit) already showing that exact FAQ text, and independently re-confirmed live 2026-07-20 — the page has not changed; the 07-16 edit simply picked one side of an internal contradiction and declared it resolved. Reported here as-is rather than guessing which statement the department actually enforces in practice.
  • NOTE (2026-07-20, supersedes the 2026-07-16 corpus-staleness note below): the IBC/IRC/IPC/IMC/IFGC/IECC lines above match the page's top summary table verbatim, independently re-confirmed 2026-07-20. But that table is not the whole story — see the NEC line's correction above for the page's separate, contradicting FAQ answer, which claims the department is 'currently using' the 2021 I-codes generally (not just for NEC). Treat every 'current as of 7/1/2026' framing above as citing the summary table specifically, not as a claim that Taylorsville's practice has been independently confirmed to match it. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either — that part of the original 07-16 note still holds.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
5units

1 buildings · $964,654 valuation

Trailing 12 months
76units

12 of 12 months reported · #58 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
43units

11 buildings · $8.4M valuation

5 month(s) reported to Census

Full year 2025
141units

18 buildings · $22.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Taylorsville operates its own Building Department — permits are NOT issued by Salt Lake County. Building Official: Steve Porten (385-379-5495). Permit Coordinator: Maribel Cortez (801-955-2030).
  • Taylorsville's Consolidated Fee Schedule (Revised & Approved March 19, 2026) uses a flat $60 fee structure for most common residential permits: water heater, HVAC, gas line, electrical service, roofing, exterior coverings, windows and doors, fences, demolition, and temporary power. Larger construction uses valuation-based fees.
  • Plan review takes at most 10 business days per the building department's published statement. Re-submitting plans resets this clock.
  • Submit and manage all permits through the EnerGov Self-Service portal: portal.taylorsvilleut.gov/EnerGov_Prod/selfservice.
  • Fire inspections and plan review for Taylorsville are handled by Unified Fire Authority (unifiedfire.org) — coordinate fire-related requirements through them.
  • Water and sewer are served by the Taylorsville/Bennion Improvement District (tbid.org) — contact them for utility connection requirements.
  • Taylorsville's building department page contradicts itself on the current NEC edition: its summary table says 2023 N.E.C. (matching the statewide mandate), but its own FAQ answer says the department is 'currently using ... the 2020 National Electrical Code.' Re-confirmed live 2026-07-20 — this is not resolved, despite an earlier version of this file having claimed the city corrected it.
  • As of July 1, 2026, the 2024 editions of IBC, IPC, IMC, IFGC, and IECC are CURRENT statewide per Utah Code § 15A-2-103, confirmed both by direct statute fetch and by Taylorsville's own building page's summary table (re-confirmed live 2026-07-20). The 2021 IRC and 2023 NEC continue unchanged per that same table — though see the NEC tip above for the page's separate, contradicting FAQ answer. IEBC and ISPSC editions are not listed on Taylorsville's page and are not asserted here beyond the statewide statute. IFC is not adopted under §15A-2-103 at all.
  • Residential fencing standards are documented in the Planning Division's 'P-22: Residential Fencing Standards' form available at the Information Forms page.
  • Impact fees apply to new residential units: $1,290 for single-family and $920.53 per unit for multi-family (park impact fees per Consolidated Fee Schedule, March 2026).

Comparable nearby cities

Salt Lake City
Both in Salt Lake County14 shared permit types~8 mi away
Compare fees →
West Jordan
Both in Salt Lake County13 shared permit types~5 mi away
Compare fees →
Millcreek
Both in Salt Lake County13 shared permit types~7 mi away
Compare fees →