Commercial Tenant Improvement / Tenant Finish Permit in Monticello, Utah

Required for tenant improvement / tenant finish work inside an existing commercial building in Monticello (e.g., interior build-out following a shell permit, or remodel of existing commercial space). Monticello's Consolidated Fee Schedule maintains no separate tenant-improvement fee tier — tenant improvement work is billed under the same valuation-based Building Permit Fee table and the same $65.00-per-hour Commercial Plan Review fee as new commercial construction.

Verified 2026-07-19 · Source

When you need this permit

  • Tenant improvement / tenant finish work, remodel, or change of occupancy inside an existing commercial building
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • All commercial project work must be performed by licensed contractors — commercial owners may not act as their own contractor Contractor
  • Legal description and San Juan County property tax parcel number
  • Building permit application listing all contractors/subcontractors with current Utah Contractor license Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation-based (same table as new commercial construction)
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06),… Show full citationMonticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — the same valuation table used for residential construction, since the schedule does not maintain a separate commercial valuation track. Monticello publishes no reduced or distinct valuation table for tenant-improvement scope; the improvement's construction valuation runs through the same table.
$1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.
Building Inspection Fee
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), at… Show full citationMonticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), at monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track.
$65.00
State Fee
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), at… Show full citationMonticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), at monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track.
1% of Permit Fee
Commercial Plan Review (per Hour)Monticello City Consolidated Fee Schedule, 'Permit Fees' section — same hourly commercial plan-review rate applies to tenant-improvement scope as to new commercial construction; no separate TI rate is published.
$65.00
6-month Building Permit Extension Fee
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06),… Show full citationMonticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section. This is the same valuation table used for residential construction — the schedule does not maintain a separate commercial valuation track.
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Monticello?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Structural / MEP Rough-In

    Scope-dependent rough-in inspection(s) prior to close-in, per the Building Official.

  2. 2

    Final Inspection

    Final inspection and closeout prior to occupancy of the improved space.

See the full Monticello inspection guide — scheduling & re-inspection fees →

Tips

  • Tenant improvement work in Monticello is not a separate fee category — it is billed under the identical valuation-based Building Permit Fee table and $65/hour Commercial Plan Review fee as ground-up commercial construction.
  • Confirm with the Building Official whether your specific tenant-finish scope (e.g., non-structural interior partition changes only) requires architect/engineer-stamped plans, since Utah's stamped-plans exemption for one-/two-family dwellings does not apply to commercial space regardless of scope size.

Frequently asked questions

Monticello requires a commercial tenant improvement / tenant finish permit for: Tenant improvement / tenant finish work, remodel, or change of occupancy inside an existing commercial building; Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures); All commercial project work must be performed by licensed contractors — commercial owners may not act as their own contractor; Legal description and San Juan County property tax parcel number; Building permit application listing all contractors/subcontractors with current Utah Contractor license. If your project isn't listed, confirm with City of Monticello Building and Zoning Department (Office of the Building Official) at (435) 587-2271 before starting work.

In Monticello, the published Building Permit Fee — valuation-based (same table as new commercial construction) is: $1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.. Additional published fees: Building Inspection Fee — $65.00; State Fee — 1% of Permit Fee; Commercial Plan Review (per Hour) — $65.00; 6-month Building Permit Extension Fee — $50.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Monticello does not publish a plan-review timeline for this permit. Contact City of Monticello Building and Zoning Department (Office of the Building Official) at (435) 587-2271 for current turnaround.

You'll need: Complete Set of Plans and Engineering, Stamped by a Utah Licensed Architect or Engineer (where applicable to scope); Building Permit Application (iworq Citizen Portal). Depending on your project, Monticello may also ask for: Site Plan (to scale). See the required-documents checklist on this page for details on each.

Monticello requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Structural / MEP Rough-In, Final Inspection. Schedule each through City of Monticello Building and Zoning Department (Office of the Building Official) ((435) 587-2271).

Apply through City of Monticello Building and Zoning Department (Office of the Building Official) at 17 N 100 E, Monticello, UT 84535. Phone: (435) 587-2271, email: megang@monticelloutah.org. Office hours: Monday–Thursday 8:00 AM – 4:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://www.monticelloutah.org/departments/buildingandzoning.

Monticello, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — statewide construction code per Utah Code § 15A-2-103, effective 07/01/2026. Monticello's own Building and Zoning page does not enumerate specific code editions; the city administers the statewide State Construction Code with no locally-published deviation found, so the current statutory statewide editions are cited directly.; 2021 International Residential Code (IRC), including Appendix AQ — statewide, per Utah Code § 15A-2-103, effective 07/01/2026 (IRC edition unchanged from the prior 2023-2026 cycle).; 2024 International Plumbing Code (IPC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Mechanical Code (IMC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Fuel Gas Code (IFGC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Energy Conservation Code (IECC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Existing Building Code (IEBC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2023 National Electrical Code (NEC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; Residential provisions of the 2024 International Swimming Pool and Spa Code — statewide, per Utah Code § 15A-2-103(1)(n), effective 07/01/2026.. Local amendments apply — see the Monticello overview page for the full list.

No. Monticello's Consolidated Fee Schedule does not publish a distinct tenant-improvement fee tier — TI work is billed under the same valuation-based Building Permit Fee table and the same $65.00/hour Commercial Plan Review fee as new commercial construction.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Monticello.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Monticello's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Monticello yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Monticello lands. Privacy.