EV Charger / EVSE Permit in Monticello, Utah

Monticello's Consolidated Fee Schedule (as of 04/14/2026, Ordinance 2026-06) does not publish a distinct EV-charger fee line item, and the city has no general electrical-permit category — only a single valuation-based Building Permit Fee and a flat $65.00 Building Inspection Fee. A full-text search of the fee schedule found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' 'EVSE,' or a standalone electrical-trade fee. The city has not published explicit confirmation of how EV charger installs are billed, so this entry is marked partial confidence.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • Building Permit Application submitted to the Monticello City Building Official
  • Confirm applicable fee category directly with the Building Official before applying, since no EV-specific or general electrical-permit line item is published

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Inspection Fee (closest published flat fee)Monticello City Consolidated Fee Schedule (as of 04/14/2026), 'Permit Fees' section: 'Building Inspection Fee — $65.00.' Not confirmed as EV-specific; Monticello has no standalone electrical-permit or EV-charger line item, so this is the closest published flat inspection fee that would likely apply to a standalone electrical install.
$65.00
Permit Fee (Based on Valuation) — if applicableMonticello City Consolidated Fee Schedule (as of 04/14/2026), 'Building Permit Fees' table. Applies if the city treats an EV charger install as valuation-based new work rather than a flat-fee inspection.
$23.50 minimum (valuation $1–$500), scaling per the city's valuation table for higher-value work
State FeeMonticello City Consolidated Fee Schedule (as of 04/14/2026), 'Permit Fees' section.
1% of Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Monticello?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Inspection

    Inspection of the installed circuit, panel work, and EVSE equipment; billed under the flat $65.00 Building Inspection Fee.

See the full Monticello inspection guide — scheduling & re-inspection fees →

Tips

  • Monticello has no distinct EV charger / EVSE permit type or fee, and no general electrical-permit category at all — confirm the correct fee category with the Building Official before applying.
  • A full-text search of the Consolidated Fee Schedule PDF (04/14/2026) found no mentions of EV chargers, EVSE, or a standalone electrical-trade fee line item.

Frequently asked questions

Monticello requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; Building Permit Application submitted to the Monticello City Building Official; Confirm applicable fee category directly with the Building Official before applying, since no EV-specific or general electrical-permit line item is published. If your project isn't listed, confirm with City of Monticello Building and Zoning Department (Office of the Building Official) at (435) 587-2271 before starting work.

Not published. Monticello's Consolidated Fee Schedule does not list an EV-charger, EVSE, or general electrical-permit fee category. The closest published fee is the flat $65.00 Building Inspection Fee, but the city has not explicitly confirmed this applies to EV charger installs — contact the Building Official to confirm before applying.

Monticello does not publish a plan-review timeline for this permit. Contact City of Monticello Building and Zoning Department (Office of the Building Official) at (435) 587-2271 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Monticello requires 1 inspection(s) for an ev charger / evse permit, in order: Building Inspection. Schedule each through City of Monticello Building and Zoning Department (Office of the Building Official) ((435) 587-2271).

Apply through City of Monticello Building and Zoning Department (Office of the Building Official) at 17 N 100 E, Monticello, UT 84535. Phone: (435) 587-2271, email: megang@monticelloutah.org. Office hours: Monday–Thursday 8:00 AM – 4:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://www.monticelloutah.org/departments/buildingandzoning.

Monticello, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — statewide construction code per Utah Code § 15A-2-103, effective 07/01/2026. Monticello's own Building and Zoning page does not enumerate specific code editions; the city administers the statewide State Construction Code with no locally-published deviation found, so the current statutory statewide editions are cited directly.; 2021 International Residential Code (IRC), including Appendix AQ — statewide, per Utah Code § 15A-2-103, effective 07/01/2026 (IRC edition unchanged from the prior 2023-2026 cycle).; 2024 International Plumbing Code (IPC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Mechanical Code (IMC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Fuel Gas Code (IFGC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Energy Conservation Code (IECC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2024 International Existing Building Code (IEBC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; 2023 National Electrical Code (NEC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.; Residential provisions of the 2024 International Swimming Pool and Spa Code — statewide, per Utah Code § 15A-2-103(1)(n), effective 07/01/2026.. Local amendments apply — see the Monticello overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Monticello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.