Solar PV Installation Permit — Monticello, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://www.monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Installation Permit in Monticello, Utah
Monticello's Consolidated Fee Schedule (as of 04/14/2026, Ordinance 2026-06) does not publish a distinct solar/photovoltaic (PV) fee line item, and the city has no general electrical-trade permit category — only a single valuation-based Building Permit Fee and a flat $65.00 Building Inspection Fee. A full-text search of the complete fee schedule PDF found zero mentions of 'solar,' 'photovoltaic,' or 'PV' anywhere in its Building Permit Fees, Miscellaneous Items, or Planning & Zoning Fees sections. Rooftop or ground-mounted solar PV installations in Monticello are therefore permitted and charged through the same valuation-based Building Permit used for all other construction — consistent with the fact that Monticello's fee schedule likewise has no standalone electrical, plumbing, or mechanical trade-permit fee line. The electrical portion of any PV installation must comply with the 2023 National Electrical Code (NEC), including Article 690 (Solar Photovoltaic Systems), adopted statewide per Utah Code § 15A-2-103.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or ground-mounted solar photovoltaic (PV) system at a residential or commercial property in Monticello
- Building Permit Application submitted to the Monticello City Building Official — Monticello's Consolidated Fee Schedule contains no separate solar/PV or general electrical-trade fee line item, so solar installations are billed under the same valuation-based Building Permit Fee table used for all other construction
- Electrical work must comply with the 2023 National Electrical Code (NEC), adopted statewide effective 07/01/2026 per Utah Code § 15A-2-103, which includes Article 690 (Solar Photovoltaic Systems) requirements
- Installing contractor must hold a current Utah Contractor license in the applicable trade, per the Utah Construction Trades Licensing Act, unless the work is performed by an owner-builder on a personal, non-commercial single-family residence Owner-builderContractor
- Property must be deeded in the applicant's name and recorded in the San Juan County Recorder's Office before permit issuance (or a notarized statement from the legal owner granting permission), per Monticello's standard building-permit prerequisite
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building/Electrical Inspection
Inspection of the installed PV modules, racking, and electrical interconnection (NEC Article 690 compliance) by the Monticello Building Official (Megan Gallegos, Assistant City Manager, 435-587-2271 ext. 15); billed under the flat $65.00 Building Inspection Fee, as no separate PV inspection fee is published.
See the full Monticello inspection guide — scheduling & re-inspection fees →
Tips
- Monticello's Consolidated Fee Schedule (signed ordinance 2026-06, as of 04/14/2026) contains zero mentions of 'solar,' 'photovoltaic,' or 'PV' anywhere in its Building Permit Fees, Miscellaneous Items, or Planning & Zoning Fees sections — confirmed by extracting and full-text-searching the entire fee schedule PDF directly (2026-07-21). Rooftop and ground-mounted solar installations are billed under the same valuation-based Building Permit Fee table as any other construction, plus the standard flat Building Inspection Fee, State Fee, and Plan Review fee.
- No Monticello-specific solar/PV or alternative-energy-system zoning ordinance was found in the city's published materials or code library index — unlike some larger Utah cities (e.g., Salt Lake City's small solar energy collection systems ordinance). Confirm with the Building and Zoning office whether any additional zoning review applies to larger ground-mounted arrays.
- The electrical portion of a solar PV installation must comply with the 2023 National Electrical Code (NEC), including Article 690 (Solar Photovoltaic Systems), adopted statewide effective 07/01/2026 per Utah Code § 15A-2-103 — the same NEC edition already cited for all other electrical work in this file.
- This mirrors Monticello's treatment of EV chargers and standalone electrical/plumbing/mechanical trade work: the city has no separate trade-specific fee schedule, so solar PV, like those other categories, is priced through the general valuation-based Building Permit Fee table.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Monticello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Monticello
Solar PV Installation Permit in other cities
Compare solar pv installation permit fees across Utah →
Look up this fee in a different city →