Commercial Tenant Improvement / Tenant Finish Permit in Grantsville, Utah

Required for tenant improvement and remodel work inside an existing commercial or industrial building in Grantsville. Grantsville's Consolidated Fee Schedule does not publish a separate tenant-improvement fee table distinct from new commercial construction — tenant improvement work is assessed under the same 'Commercial/Industrial Building Permit Fees' table (Building Permit Fee 0.0068 x valuation, Plan Check Fee 0.0049 x valuation), scaled to the tenant improvement scope's own ICC valuation rather than the full building's value.

Reviewed 2026-07-19 · Source

When you need this permit

  • Tenant improvement or remodel work within an existing commercial or industrial building, regulated by the adopted 2024 IBC with Utah amendments
  • Complete building permit application
  • Floor plan showing existing vs. planned conditions and specific use of each area
  • Construction plans and structural/electrical/mechanical/plumbing design applicable to the scope of work
  • Engineering structural calculations where structural elements are affected

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Commercial/Industrial, valuation-based)Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section — the same table used for new commercial/industrial construction; Grantsville does not publish a distinct tenant-improvement fee line, so this general Commercial/Industrial rate is reported here, scaled to the tenant improvement's own valuation.
0.0068 x total permit value
Plan Check Fee (Commercial/Industrial)Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section.
0.0049 x total permit value
State SurchargeGrantsville City Consolidated Fee Schedule.
1% of building permit fee
Credit/Debit Card FeeGrantsville City Consolidated Fee Schedule.
2.5%

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Grantsville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Structural

    Verified against submitted plans before close-in, where the tenant improvement affects structural or fire-rated elements.

  2. 2

    Final Inspection

    Done when the tenant improvement is complete and ready for occupancy.

See the full Grantsville inspection guide — scheduling & re-inspection fees →

Tips

  • Grantsville does not publish a fee table specific to tenant improvement/commercial remodel work — the same Commercial/Industrial Building Permit Fees table used for new construction applies, scaled to the tenant improvement's own valuation rather than the full building's value.
  • Impact fees on the Commercial/Industrial table (water, sewer, transportation, public safety) are generally tied to added building area, fixture units, or new demand — confirm with the Building Department, (435) 884-1691, whether a given tenant improvement triggers any of these fees or only the base Building Permit and Plan Check fees.

Frequently asked questions

Grantsville requires a commercial tenant improvement / tenant finish permit for: Tenant improvement or remodel work within an existing commercial or industrial building, regulated by the adopted 2024 IBC with Utah amendments; Complete building permit application; Floor plan showing existing vs. planned conditions and specific use of each area; Construction plans and structural/electrical/mechanical/plumbing design applicable to the scope of work; Engineering structural calculations where structural elements are affected. If your project isn't listed, confirm with Grantsville City Building Department at (435) 884-1691 before starting work.

No distinct tenant-improvement fee table is published in Grantsville's Consolidated Fee Schedule. Tenant improvement and remodel work in an existing commercial or industrial building is assessed under the same Commercial/Industrial Building Permit Fees table used for new construction (Building Permit Fee 0.0068 x valuation, Plan Check Fee 0.0049 x valuation), scaled to the improvement's own valuation. Contact the Building Department at (435) 884-1691 to confirm which impact fees, if any, apply to a specific tenant finish scope.

Grantsville does not publish a plan-review timeline for this permit. Contact Grantsville City Building Department at (435) 884-1691 for current turnaround.

You'll need: Grantsville Building Permit Application (fillable PDF); Floor Plan (existing vs. planned). See the required-documents checklist on this page for details on each.

Grantsville requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Structural, Final Inspection. Schedule each through Grantsville City Building Department ((435) 884-1691).

Apply through Grantsville City Building Department at 336 West Main Street, Grantsville, UT 84029. Phone: (435) 884-1691, email: ajensen@grantsvilleut.gov. Office hours: Mon–Fri 9:00 AM – 5:00 PM. Official information: https://www.grantsvilleut.gov/departments/building/index.php.

Grantsville, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Grantsville's Building Department page links directly to the 'Utah Building Code' as its adopted code and does not itemize a specific edition year (no local IBC edition override found; live-checked 2026-07-16).; 2021 International Residential Code (IRC) with Utah amendments — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Utah's amendment removes the mandatory residential fire-sprinkler requirement (Utah Code § 15A-3-103).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Grantsville's own Building Department page, added here per statute.; 2024 International Plumbing Code (IPC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.; 2024 International Mechanical Code (IMC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Grantsville's own Building Department page or FAQ, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here. Referenced generically (without an edition year) in Grantsville's own New Residential Building Submittal Checklist ('Information showing compliance from the International Energy Conservation Code as amended by the State of Utah').; 2023 National Electrical Code (NEC) — CORRECTED: this file previously listed '2020 NEC,' which was already stale before the 7/1/2026 statewide transition (Utah has required the 2023 NEC statewide since well before this file's original verification date). Utah Code § 15A-2-103(1)(g) confirms 2023 NEC as the current and unchanged edition; no Grantsville-specific electrical code edition was found published on the city's own pages to source the earlier '2020' figure.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Grantsville's own Building Department page, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Grantsville's own Building Department page, added here per statute since the City's own materials omit it.; Grantsville City Code Title 5, 'Building Regulations' — local building-permit administration ordinance, viewable at grantsville.municipalcodeonline.com (linked directly from the city's own Building Department page as 'City Building Code').; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023, corrected from an erroneous '2020' figure above) did NOT change. Grantsville's Building Department page (grantsvilleut.gov/departments/building/index.php) was live-checked 2026-07-16 and does not itemize specific code edition years at all — it links generically to 'Utah Building Code,' so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout.. Local amendments apply — see the Grantsville overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grantsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Grantsville.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.