EV Charger / EVSE Permit — Grantsville, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.utah.gov/pmn/files/1072873.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Grantsville, Utah
Grantsville City does not publish a separate EV-charger/EVSE permit or fee. Per Grantsville Ordinance 2024-04 (Building Fees Update), which amends the Grantsville City Consolidated Fee Schedule, building permit fees are calculated as a percentage of total permit value (e.g., 0.0065-0.0075 x total permit value depending on structure type), using ICC Building Valuation Data updated annually, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Grantsville
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Building permit application submitted via grantsvilleut.portal.iworq.net
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Field inspection of the EV charger circuit and installation, scheduled through the Grantsville Building Department, (435) 884-1691.
See the full Grantsville inspection guide — scheduling & re-inspection fees →
Tips
- Grantsville has no separate EV-charger permit or fee category — the city's Consolidated Fee Schedule, as amended by Ordinance 2024-04, prices all building-permit work, including electrical, on a percentage-of-valuation basis.
- A standalone EV charger install with a total permit value under $15,000 may fall under the flat $150.00 General Building Fee category rather than the percentage-of-valuation table — confirm with the Building Department before applying.
- Total permit value is determined using ICC Building Valuation Data, updated annually on January 1st.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grantsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Grantsville
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Grantsville project checklist
Describe your project once and get every permit, document, and fee it triggers in Grantsville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →