Skip to main content
PermitBase

EV Charger / EVSE Permit in Grantsville, Utah

Grantsville City does not publish a separate EV-charger/EVSE permit or fee. Per Grantsville Ordinance 2024-04 (Building Fees Update), which amends the Grantsville City Consolidated Fee Schedule, building permit fees are calculated as a percentage of total permit value (e.g., 0.0065-0.0075 x total permit value depending on structure type), using ICC Building Valuation Data updated annually, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Grantsville
  • Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
  • Building permit application submitted via grantsvilleut.portal.iworq.net

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (single-family dwelling)Grantsville Ordinance 2024-04 (Building Fees Update), Section 2, 'Single Family Dwelling Permit Fees' (as amended). Total permit value determined using ICC Building Valuation Data, updated annually January 1. No distinct EV-charger or standalone-electrical dollar figure is published.
.00658 x total permit value
Building Permit Fee (general/commercial, when total permit value does not exceed $15,000)Grantsville Ordinance 2024-04, Section 1, 'General Building Fees.' Applies when total permit value does not exceed $15,000 — potentially relevant to a standalone EV charger install, though not explicitly named.
$150.00 flat

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Grantsville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Field inspection of the EV charger circuit and installation, scheduled through the Grantsville Building Department, (435) 884-1691.

See the full Grantsville inspection guide — scheduling & re-inspection fees →

Tips

  • Grantsville has no separate EV-charger permit or fee category — the city's Consolidated Fee Schedule, as amended by Ordinance 2024-04, prices all building-permit work, including electrical, on a percentage-of-valuation basis.
  • A standalone EV charger install with a total permit value under $15,000 may fall under the flat $150.00 General Building Fee category rather than the percentage-of-valuation table — confirm with the Building Department before applying.
  • Total permit value is determined using ICC Building Valuation Data, updated annually on January 1st.

Frequently asked questions

Grantsville requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Grantsville; Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g)); Building permit application submitted via grantsvilleut.portal.iworq.net. If your project isn't listed, confirm with Grantsville City Building Department at (435) 884-1691 before starting work.

No. Grantsville's Consolidated Fee Schedule, as amended by Ordinance 2024-04, publishes no distinct EV-charger line item — building permit fees, including electrical work, are calculated as a percentage of total permit value (ICC valuation-based) or a flat $150.00 fee for permits valued under $15,000.

Grantsville does not publish a plan-review timeline for this permit. Contact Grantsville City Building Department at (435) 884-1691 for current turnaround.

You'll need: Building Permit Application (iWorq portal). See the required-documents checklist on this page for details on each.

Grantsville requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Grantsville City Building Department ((435) 884-1691).

Apply through Grantsville City Building Department at 336 West Main Street, Grantsville, UT 84029. Phone: (435) 884-1691, email: ajensen@grantsvilleut.gov. Office hours: Mon–Fri 9:00 AM – 5:00 PM. Official information: https://www.grantsvilleut.gov/departments/building/index.php.

Grantsville, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Grantsville's Building Department page links directly to the 'Utah Building Code' as its adopted code and does not itemize a specific edition year (no local IBC edition override found; live-checked 2026-07-16).; 2021 International Residential Code (IRC) with Utah amendments — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Utah's amendment removes the mandatory residential fire-sprinkler requirement (Utah Code § 15A-3-103).; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Grantsville's own Building Department page, added here per statute.; 2024 International Plumbing Code (IPC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.; 2024 International Mechanical Code (IMC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Grantsville's own Building Department page or FAQ, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here. Referenced generically (without an edition year) in Grantsville's own New Residential Building Submittal Checklist ('Information showing compliance from the International Energy Conservation Code as amended by the State of Utah').; 2023 National Electrical Code (NEC) — CORRECTED: this file previously listed '2020 NEC,' which was already stale before the 7/1/2026 statewide transition (Utah has required the 2023 NEC statewide since well before this file's original verification date). Utah Code § 15A-2-103(1)(g) confirms 2023 NEC as the current and unchanged edition; no Grantsville-specific electrical code edition was found published on the city's own pages to source the earlier '2020' figure.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Grantsville's own Building Department page, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Grantsville's own Building Department page, added here per statute since the City's own materials omit it.; Grantsville City Code Title 5, 'Building Regulations' — local building-permit administration ordinance, viewable at grantsville.municipalcodeonline.com (linked directly from the city's own Building Department page as 'City Building Code').; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023, corrected from an erroneous '2020' figure above) did NOT change. Grantsville's Building Department page (grantsvilleut.gov/departments/building/index.php) was live-checked 2026-07-16 and does not itemize specific code edition years at all — it links generically to 'Utah Building Code,' so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout.. Local amendments apply — see the Grantsville overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grantsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.