New Commercial Shell Building Permit in Pleasant Grove, Utah

Required for new commercial shell construction in Pleasant Grove, regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; with related Utah amendments referenced on the city's Building Division page, which itself still lists the 2021 IBC as of live re-check 2026-07-16).

Verified 2026-07-03 · Source

When you need this permit

  • New commercial shell construction
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • Gas line layout with pipe sizes called out
  • Heat loss analysis
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Contractor license number or Owner-Builder Certification Form Owner-builderContractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Submittal Fee (Plan Check Fee) — New Commercial Shellpgcityutah.gov/departments/community_development/fee_schedule.php and building.php (fetched 2026-07-04): 'New Commercial — $500.' Applied toward the total cost of the building permit.
$500.00

Review timeline

Plan review
Not published — contact the department

How long did your New Commercial Shell Building Permit permit actually take in Pleasant Grove?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour, per standard IBC inspection sequence.

  2. 2

    Framing

    After framing, sheathing, and roof installed.

  3. 3

    Final

    All work complete before occupancy.

See the full Pleasant Grove inspection guide — scheduling & re-inspection fees →

Tips

  • The $500 submittal fee applies specifically to new commercial shell construction; Commercial Remodel/Tenant Improvement is billed separately at $250.
  • No published commercial-specific plan-review turnaround time exists; the 14-business-day figure on the city's page applies only to single-family residential per Utah Code § 10-6-160.

Frequently asked questions

Pleasant Grove requires a new commercial shell building permit for: New commercial shell construction; Electronic copy of plans and engineering; Site plan to scale; Structural engineering plan review; Gas line layout with pipe sizes called out; Heat loss analysis; SWPPP (Storm Water Pollution Prevention Plan); Contractor license number or Owner-Builder Certification Form. If your project isn't listed, confirm with Pleasant Grove City Building Division (Community Development Department) at 801-785-5045 before starting work.

Pleasant Grove charges a $500 submittal fee (Plan Check Fee) for new commercial shell construction, applied toward the total cost of the building permit.

Pleasant Grove does not publish a plan-review timeline for this permit. Contact Pleasant Grove City Building Division (Community Development Department) at 801-785-5045 for current turnaround.

You'll need: Electronic Copy of Plans and Engineering; Site Plan (to scale); Structural Engineering Plan Review; SWPPP (Storm Water Pollution Prevention Plan). See the required-documents checklist on this page for details on each.

Pleasant Grove requires 3 inspection(s) for a new commercial shell building permit, in order: Foundation / Footing, Framing, Final. Schedule each through Pleasant Grove City Building Division (Community Development Department) (801-785-5045).

Apply through Pleasant Grove City Building Division (Community Development Department) at 70 S 100 East, Pleasant Grove, UT 84062. Phone: 801-785-5045. Office hours: Mon–Thu 7:30 AM – 5:30 PM; Fri 8:00 AM – 12:00 PM, per pgcityutah.gov/departments/community_development/building.php. Fax: 801-785-8925 (published on the same page as a fax number, not an email address — no department email address is published on the Building Division page).. Official information: https://www.pgcityutah.gov/departments/community_development/building.php.

Pleasant Grove, Utah has adopted: GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Pleasant Grove's own Building Division page (pgcityutah.gov/departments/community_development/building.php) still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the 2026-07-04 fetch. State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.; 2024 International Building Code (IBC), including Appendices C and J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Building Code (IBC)' (live re-check 2026-07-16).; 2021 International Residential Code (IRC) with Utah State Amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Pleasant Grove's own page, which lists '2021 International Residential Code w/ Utah State Amendments (IRC)' (live re-check 2026-07-16).; 2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Mechanical Code (IMC)' (live re-check 2026-07-16).; 2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Plumbing Code (IPC)' (live re-check 2026-07-16).; 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip and has been state law since before this project's original 2026-07-04 review. Pleasant Grove's own Building Division page still lists '2020 National Electrical Code (NEC)' (live re-check 2026-07-16) — a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip, of the same kind separately documented for American Fork's Solar checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.; 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Energy Conservation Code w/ Utah State Amendments (IECC)' (live re-check 2026-07-16).; 2024 International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Pleasant Grove's Building Division page still lists '2021 International Existing Building Code (IEBC)' (live re-check 2026-07-16).; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Pleasant Grove's Building Division page lists '2021 International Swimming Pool and Spa Code (ISPSC)' without qualifying it to residential provisions (live re-check 2026-07-16).; Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned anywhere on Pleasant Grove's Building Division page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.; No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Pleasant Grove's Building Division page does not list an IFC edition either, so there is no mis-citation to correct here.. Local amendments apply — see the Pleasant Grove overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Pleasant Grove.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.