Sign Permit in Ivins, Utah
Ivins City charges a distinct Sign Permit fee, separate from the general Building Permit fee: $50.00 per the Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024, 'PLANNING & DEVELOPMENT' section), plus a $5.00 '45 Day Temporary Sign Permit' for temporary signage. This corrects a gap in this file's commercial-building-permit entry, whose tips previously stated no dedicated sign-permit fee existed — that finding relied on a plain-text extraction of the Consolidated Fee Schedule PDF, which is an image/scanned document and silently drops content under plain-text extraction; a direct visual/OCR read of the same PDF (page 5 of 8) surfaced the Sign Permit line. Under Ivins City Code § 16.21.102, the application required to install, erect, construct, or modify a sign is the same class of use application (Class I through V) that would be required to establish the use or activity the sign is associated with, and § 16.21.104 states a sign application may also require a separate building permit, as required by the adopted building code.
Verified 2026-07-21 · Source
When you need this permit
- Installation, erection, construction, or modification of a sign requires the same class of use application (Class I, II, III, IV, or V) that would be required to establish the proposed or existing use the sign is associated with, per Ivins City Code § 16.21.102
- May also require approval of a building permit application, as required by the adopted building code, per § 16.21.104 (e.g., signs with footings, foundations, or electrical connections)
- Sign type and dimensions must comply with Table 21-1, 'Table of Allowed Signs,' per § 16.21.116
- Signs identified in Table 21-2, 'Table of Exempt Signs' (§ 16.21.118), are exempt from Chapter 21's requirements provided they are not a prohibited sign under § 16.21.119
- 45-day temporary signs are permitted under a separate, lower-cost temporary sign permit track
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Sign Inspection
Required where the sign involves footings, foundations, or electrical connections, per § 16.21.104 and the adopted building code; scheduled via City Inspect (Building/Zoning Department, 435-634-9753).
See the full Ivins inspection guide — scheduling & re-inspection fees →
Tips
- Ivins does charge a distinct Sign Permit fee ($50.00, plus $5.00 for a 45-day temporary sign) under the Consolidated Fee Schedule's Planning & Development section — this fee schedule is a scanned/image PDF that silently drops content under plain-text extraction, which is why an earlier pass on this file (reflected in the commercial-building-permit entry's tips) concluded no distinct sign fee existed; that conclusion was corrected 2026-07-21 via direct visual/OCR review.
- A sign application may separately trigger the valuation-based Building Permit fee (plus 10% Plan Check and 1% State Permit Tax) if the sign involves footings, foundations, or electrical connections, per Ivins City Code § 16.21.104 — budget for both fee tracks if applicable.
- The specific application class (Class I through V) required for a sign depends on the use it is associated with, per § 16.21.102 — confirm the correct class and any site-plan/drawing requirements with the Building/Zoning Department, (435) 634-9753, before submitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ivins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ivins
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Ivins project checklist
Describe your project once and get every permit, document, and fee it triggers in Ivins — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →