EV Charger / EVSE Permit in Ivins, Utah
Ivins has no distinct EV charger/EVSE permit type or fee, and no standalone electrical-trade permit line at all. A full-text check of Ivins City Ordinance No. 2024-12 (Consolidated Fee Schedule, effective 07/01/2024) found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' A residential Level 2 EV charger install is billed under the same valuation-based Building Permit fee (plus 10% Plan Check and 1% State Permit Tax surcharges) as standard electrical work.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
- Coordination with Dixie Power (the rural electric cooperative serving Ivins) for service upgrades and new electrical connections, in addition to the city building permit
- Application submitted via City Inspect (Building/Zoning Department, 435-634-9753)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Combined Inspection
Final combined building/electrical/mechanical/plumbing inspection required before Certificate of Occupancy issuance, scheduled via City Inspect (Building/Zoning Department, 435-634-9753).
See the full Ivins inspection guide — scheduling & re-inspection fees →
Tips
- Ivins has no distinct EV charger/EVSE fee line and no standalone electrical-trade permit line at all — the Consolidated Fee Schedule (Ordinance No. 2024-12) was checked directly and contains zero EV-related mentions.
- Electric service in Ivins is provided by Dixie Power (a rural electric cooperative), not a city-owned utility — coordinate service upgrades and new EV charger circuits directly with Dixie Power in addition to the city building permit.
- Budget for the Plan Check (10%) and State Permit Tax (1%) surcharges in addition to the base valuation-based Building Permit fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ivins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ivins
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Ivins project checklist
Describe your project once and get every permit, document, and fee it triggers in Ivins — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →