Commercial Building Permit in Ivins, Utah

Required for new commercial construction in Ivins, regulated by the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026). Ivins City's Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024) publishes a single, generic 'Building Permit Fees' section that is Based on Valuation using the City's 1997 Valuation Code, with no separate residential/commercial split or dedicated commercial-specific fee line — the same section that governs the Residential Building Permit entry in this file applies here.

Reviewed 2026-07-19 · Source

When you need this permit

  • New commercial construction regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
  • Application submitted through the Ivins City Inspect online portal (utah.cityinspect.com)
  • Project valuation stated on the application, used to calculate the Building Permit fee under the city's 1997 Valuation Code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Ivins City Consolidated Fee Schedule (Ordinance No. 2024-12, effective 07/01/2024), 'BUILDING PERMIT FEES > Permit Fees > Building Permit: Based on Valuation using 1997 Valuation Code.' This line is not split by residential vs. commercial in the published schedule — it is the same fee mechanism cited on the Residential Building Permit entry in this file.
Based on Valuation, using the City's 1997 Valuation Code
Plan Check FeeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'Plan Check: 10% of Building Permit.' No commercial-specific plan check percentage is separately published.
10% of the Building Permit fee
State Permit TaxIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'State Permit Tax: 1% of Building Permit.'
1% of the Building Permit fee
SWPPP FeeIvins City Consolidated Fee Schedule (Ordinance No. 2024-12): 'SWPPP: $200.00.' Not stated as residential-only, so presumed to apply to qualifying commercial disturbance as well.
$200.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Ivins?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Standard IBC inspection sequence before concrete pour, scheduled through the CityInspect portal.

  2. 2

    Structural / Framing

    Framing and structural elements verified before close-in.

  3. 3

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in verified against submitted plans.

  4. 4

    Final

    All work complete before occupancy.

See the full Ivins inspection guide — scheduling & re-inspection fees →

Tips

  • Ivins does not publish a distinct commercial fee schedule — the same 'Based on Valuation using 1997 Valuation Code' Building Permit line, 10% Plan Check, and 1% State Permit Tax that apply to residential permits also govern commercial permits per the city's Consolidated Fee Schedule.
  • No commercial-specific plan-review timeline is published; confirm current turnaround expectations directly with the Building/Zoning Department at (435) 634-9753.
  • CORRECTED 2026-07-21 (see this file's dedicated sign-permit entry): Ivins DOES charge a distinct Sign Permit fee ($50.00, plus $5.00 for a 45-day temporary sign) under the Consolidated Fee Schedule's 'PLANNING & DEVELOPMENT' section — a scanned/image PDF whose text is not recoverable via plain-text extraction, which is why an earlier pass on this entry concluded no distinct sign fee existed; that was confirmed wrong via direct visual/OCR review of the fee schedule (page 5 of 8). Per Ivins City Code § 16.21.104, a sign application may separately require a building permit (this file's valuation-based fee) if it involves footings, foundations, or electrical connections — see the sign-permit entry for full detail.

Frequently asked questions

Ivins requires a commercial building permit for: New commercial construction regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a)); Application submitted through the Ivins City Inspect online portal (utah.cityinspect.com); Project valuation stated on the application, used to calculate the Building Permit fee under the city's 1997 Valuation Code. If your project isn't listed, confirm with Ivins City Building/Zoning Department at (435) 634-9753 before starting work.

No. Ivins City's Consolidated Fee Schedule (Ordinance No. 2024-12) publishes a single, generic Building Permit Fees section — Based on Valuation using the City's 1997 Valuation Code, plus a 10% Plan Check fee and 1% State Permit Tax — with no separate residential/commercial split.

Ivins does not publish a plan-review timeline for this permit. Contact Ivins City Building/Zoning Department at (435) 634-9753 for current turnaround.

You'll need: Building Permit Application (CityInspect); Construction Plans and Engineering. See the required-documents checklist on this page for details on each.

Ivins requires 4 inspection(s) for a commercial building permit, in order: Foundation / Footing, Structural / Framing, MEP Rough-In, Final. Schedule each through Ivins City Building/Zoning Department ((435) 634-9753).

Apply through Ivins City Building/Zoning Department at 85 N Main St, Ivins, UT 84738. Phone: (435) 634-9753. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://ivinsutah.gov/building-department/.

Ivins, Utah has adopted: 2024 International Building Code (IBC) — adopted via Ivins City Ordinance No. 2025-08 amending Title 14 'Buildings and Construction' (which adopts the state construction code by reference, per Ivins City Code Title 14, Ch.1, and so auto-tracks statutory changes); Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseded the 2021 edition; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseded the 2021 edition; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseded the 2021 edition; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseded the 2021 edition; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseded the 2021 edition; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition; Ivins charges a distinct Pool Permit Fee ($300, per its Consolidated Fee Schedule); NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force. Because Ivins Ordinance No. 2025-08 adopts the state code by reference rather than restating specific editions, Ivins is not expected to have a separate city-document lag of the kind seen in some sibling cities — this was not independently re-verified against the amlegal-hosted Ivins Code text this session (that site's full ordinance text is not renderable via automated fetch, per the localAmendments entry above).. Local amendments apply — see the Ivins overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ivins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Ivins.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.