Change of Use Permit / Certificate of Occupancy in Unincorporated Wayne County, Utah

Unincorporated Wayne County does not publish a standalone 'change of use' application separate from its general Land Use Application / Permitted Use Application process, and does not publish a standalone Certificate of Occupancy (CO) application separate from the county's unified 'Application for Building Permit and/or Certificate of Occupancy' form (see this file's residential-building-permit and commercial-building-permit entries). Two distinct ordinance provisions govern this permit type: (1) Section 1632/1003 of the Wayne County Zoning/Subdivision Ordinance ('Certificate of Occupancy Required') makes it unlawful to occupy or use any building or structure requiring a building permit until the Building Official has issued a CO; and (2) Section 204 of the county's Administrative Manual ('Land Use Permit Required') states that 'no use, activity, or construction shall be established or commenced' without the necessary Land Use approvals -- meaning establishing a new or different use in an existing building (a change of use) requires a Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application (decided respectively by the Zoning Administrator, Planning Commission, or BOCC, per the same Land Use Authority structure already documented in this file's sign-permit entry) before the new use may lawfully begin, in addition to any CO required for the underlying building.

Reviewed 2026-07-22 · Source

When you need this permit

  • A Certificate of Occupancy must be obtained from the Building Official before any building or structure requiring a building permit may be occupied or used (Zoning Ordinance Section 1632 / Subdivision Ordinance Section 1003); failure to obtain one is a violation and the county may cite and abate an occupied-without-CO structure as a public nuisance
  • Establishing a new or different use in an existing building or on a property (a 'change of use') requires an approved Land Use Application -- a Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application depending on how the new use is classified in Appendix A, Table of Uses, for the applicable Zoning District -- before the use may lawfully be established (Administrative Manual Section 204; Zoning Ordinance Section 1107(7) for a nonconforming use changing to an allowed use)
  • The new use must be an allowed use (Permitted or Conditional) for the Zoning District under Appendix A, Table of Uses; a use not listed in the Table of Uses is a Prohibited Use countywide
  • A valid Wayne County business license is required for the new use if the use category requires one, per Section 1633 (Business License Required -- Continuing Obligations)
  • Proof of ownership of property, or written tenant/owner authorization

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use Permit / Certificate of Occupancy permit actually take in Unincorporated Wayne County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Final / Occupancy Inspection

    Final inspection required before the Building Official issues the Certificate of Occupancy; occupancy of the structure is prohibited until after this inspection, per the same Building Final inspection documented in this file's residential-building-permit and commercial-building-permit entries.

See the full Unincorporated Wayne County inspection guide — scheduling & re-inspection fees →

Tips

  • There is no CO-only application in Wayne County -- occupancy authorization is requested on the same 'Application for Building Permit and/or Certificate of Occupancy' form used for construction permits.
  • A change of use is NOT automatically covered by a Certificate of Occupancy alone: if the new use is different from what was previously approved for the property, Wayne County's Administrative Manual Section 204 requires a Land Use Application (Permitted P-1, Permitted P-2, or Conditional Use, depending on the use classification) before the new use may lawfully begin.
  • Occupying or using a building without an issued Certificate of Occupancy is a violation of the Zoning Ordinance and can be cited and abated as a public nuisance (Section 1632(4)).
  • A legal nonconforming use may only be changed to a use allowed in Appendix A, Table of Uses, by following the standard Land Use Application approval procedures for that new use (Zoning Ordinance Section 1107(7)).

Frequently asked questions

Likely yes, in addition to any Certificate of Occupancy: the county's Administrative Manual (Section 204) requires a Land Use Application -- a Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application depending on how the new use is classified for the Zoning District -- before a new or different use may lawfully be established, whether or not construction is involved.

Unincorporated Wayne County does not publish a plan-review timeline for this permit. Contact Wayne County Building Department at (435) 836-1302 for current turnaround.

You'll need: Application for Building Permit and/or Certificate of Occupancy; Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application; Proof of Ownership or Authorization. See the required-documents checklist on this page for details on each.

Unincorporated Wayne County requires 1 inspection(s) for a change of use permit / certificate of occupancy, in order: Building Final / Occupancy Inspection. Schedule each through Wayne County Building Department ((435) 836-1302).

Apply through Wayne County Building Department at 18 South Main St, PO Box 189, Loa, UT 84747. Phone: (435) 836-1302. Office hours: Monday–Friday 8:00 AM – 5:00 PM (closed 12:30–1:00 PM for lunch); Wayne County Courthouse hours per County Offices page. Official information: https://waynecountyutah.gov/pages/county-offices.

Unincorporated Wayne County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); REMAINS CURRENT, UNCHANGED by the 7/1/2026 amendment; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on any Wayne County page found, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition previously listed here; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition previously listed here; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on any Wayne County page found, added here per statute since this file had previously omitted it entirely; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, UNCHANGED by the 7/1/2026 amendment; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on any Wayne County page found, added here per statute since this file had previously omitted it entirely; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('effective through June 30, 2026' / codes 'effective July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) remain unchanged. These are statewide mandatory minimum codes adopted by reference; Wayne County has not published any local code amendments or its own code-edition page beyond referencing the statewide codes generally, so there is no city-page lag to record..

No standalone CO-only form is published. A Certificate of Occupancy is requested through the same 'Application for Building Permit and/or Certificate of Occupancy' form used for construction permits, and must be issued by the Building Official before a building or structure may lawfully be occupied.

Compare change of use permit / certificate of occupancy fees across Utah

Look up this fee in a different city →

Embed this data card →

Now live

Build your Unincorporated Wayne County project checklist

Describe your project once and get every permit, document, and fee it triggers in Unincorporated Wayne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →