EV Charger / EVSE Permit — Unincorporated Wayne County, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://waynecountyutah.gov/uploads/building-permit-application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Wayne County, Utah
Wayne County does not publish a distinct EV charger / EVSE permit type, fee, or checklist anywhere on its site (checked 2026-07-19, re-checked 2026-07-20). EV charger (EVSE) installation is treated as standard electrical work under the county's single, unified 'Application for Building Permit and/or Certificate of Occupancy' form — the same form and single county-wide Building Inspector (Eric Torgerson) used for all other permit types in this file. The form's only electrical-related categories are the 'Electrician' trade-contractor line and the 'Rough Electrical'/'Electrical Final' inspection items; no separate electrical or EV-specific permit category exists. As with every other permit type in this file, Wayne County has not published a dollar fee schedule — the Building Permit Application form's Rate/Permit Fee/Plan Review Fee fields are left blank and completed by county staff at intake.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work
- Proof of ownership of property
- Compliance with the 2023 NEC, which governs statewide per Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
After electrical is in place, but before covering — per the county's standard inspection sequence documented in this file's residential-building-permit entry.
- 2
Electrical Final
Final electrical inspection.
See the full Unincorporated Wayne County inspection guide — scheduling & re-inspection fees →
Tips
- Wayne County runs one unified Building Permit process for every trade, including electrical work — there is no dedicated EV-charger permit type, application, or fee category.
- As with every other permit type in this file, no dollar fee figure is published; call the Building Department at (435) 836-1302 or the Building Inspector directly for a project-specific quote.
- The same single Building Inspector (Eric Torgerson) who handles new construction also handles EV-charger/electrical inspections for both unincorporated county land and incorporated towns (Loa, Bicknell, Torrey, Hanksville).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wayne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Wayne County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →