Solar PV / Solar Panel Installation Permit in Unincorporated Wayne County, Utah

Wayne County publishes no distinct solar or solar-PV installation permit type, fee, or checklist anywhere on its site — not on the county-offices page, the Official Documents & Links listing, the Administrative Manual, the FY2026 budget, or in the archived history of the county domain. Solar PV installation is treated as standard construction and electrical work under the county's single unified 'Application for Building Permit and/or Certificate of Occupancy' form, handled by the same county-wide Building Inspector (Eric Torgerson) as every other permit type here. The form's trade-contractor lines are Permittee, Architect/Engineer, Building Contractor, Electrician, Plumber, and Heating — there is no solar or photovoltaic-specific line item or checkbox. As with every other permit type in this entry, Wayne County has not published a dollar fee schedule: the Rate, Permit Fee, and Plan Review Fee fields on the application are left blank and completed by county staff at intake.

Reviewed 2026-07-21 · Source

When you need this permit

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work (via the 'Alteration' or 'Addition' project-type checkbox)
  • Proof of ownership of property
  • Compliance with the 2024 IBC/IRC structural provisions and the 2023 NEC (National Electrical Code Article 690, Solar Photovoltaic Systems), which govern statewide per Utah Code § 15A-2-103(1)(a)-(b) and (1)(g)
  • Electrical work must be performed by, or under the supervision of, a licensed electrical contractor listed on the Building Permit Application's 'Electrician' trade line

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV / Solar Panel Installation Permit permit actually take in Unincorporated Wayne County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    After electrical is in place, but before covering — per the county's standard inspection sequence documented in the residential-building-permit entry.

  2. 2

    Electrical Final

    Final electrical inspection.

See the full Unincorporated Wayne County inspection guide — scheduling & re-inspection fees →

Tips

  • Wayne County runs one unified Building Permit process for every trade, including solar PV installation — there is no dedicated solar permit type, application, or fee category.
  • As with every other permit type in this record, no dollar fee figure is published; call the Building Department at (435) 836-1302 or the Building Inspector directly for a project-specific quote.
  • The same single Building Inspector (Eric Torgerson) who handles new construction also handles solar/electrical inspections for both unincorporated county land and incorporated towns (Loa, Bicknell, Torrey, Hanksville).
  • Wayne County publishes no distinct solar permit, form, or fee. Nothing appears on the county-offices page, in the Official Documents & Links listing of uploaded PDFs, in the Administrative Manual, or in the FY2026 budget.
  • Wayne County publishes no building-permit fee figures anywhere. On the county's building-permit-application.pdf, the 'Rate / Permit Fee / Plan Review Fee / Amount Paid / Total' lines are genuinely blank underscored fields on the real form. The county's budget resolutions (reslution-12-15-2025-2026-budget.pdf and reslution-2025-06-amending-2025-budget.pdf) contain only aggregate 'Building Department' expense ($65,000/$66,000) and 'Building Permit' revenue ($75,000-$99,000 for 2025, $80,000 for 2026) budget lines — no itemized per-permit-type or per-project-type dollar fee for solar, electrical, or otherwise. In the county's Administrative Manual, every 'Fee Amount: $' occurrence (20 instances covering every land-use and building-related application type in the manual, not just Chapter 14/15) is blank with no dollar figure filled in. Note on the manual's numbering: 'APPLICATION FEE AND REVIEW FEE SCHEDULES' is Chapter 14 and 'APPLICATIONS AND APPLICATION REVIEW PROCEDURES' is Chapter 15 (a source citation below pairing 'Chapter 15' with 'Application Fee and Review Fee Schedules' has the chapter number and title paired incorrectly — a citation labeling error, not a substantive one, since neither chapter contains a dollar figure). An independently archived October 2025 copy of the same building-permit-application.pdf is identical and equally blank, and the only other fee-related documents in the domain's archives (citation-and-court-fees.pdf and wayne-county-recorder-fees-2019-.pdf) are unrelated court/recorder fee schedules with no building-permit content. No Wayne-County-specific building-permit dollar figure is published by any source. Confidence remains 'partial' because the underlying fact is an absence, not because the record is incomplete.

Frequently asked questions

Unincorporated Wayne County requires a solar pv / solar panel installation permit for: Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work (via the 'Alteration' or 'Addition' project-type checkbox); Proof of ownership of property; Compliance with the 2024 IBC/IRC structural provisions and the 2023 NEC (National Electrical Code Article 690, Solar Photovoltaic Systems), which govern statewide per Utah Code § 15A-2-103(1)(a)-(b) and (1)(g); Electrical work must be performed by, or under the supervision of, a licensed electrical contractor listed on the Building Permit Application's 'Electrician' trade line. If your project isn't listed, confirm with Wayne County Building Department at (435) 836-1302 before starting work.

Unincorporated Wayne County does not publish a plan-review timeline for this permit. Contact Wayne County Building Department at (435) 836-1302 for current turnaround.

You'll need: Application for Building Permit and/or Certificate of Occupancy; Proof of Ownership. See the required-documents checklist on this page for details on each.

Unincorporated Wayne County requires 2 inspection(s) for a solar pv / solar panel installation permit, in order: Rough Electrical, Electrical Final. Schedule each through Wayne County Building Department ((435) 836-1302).

Apply through Wayne County Building Department at 18 South Main St, PO Box 189, Loa, UT 84747. Phone: (435) 836-1302. Office hours: Monday–Friday 8:00 AM – 5:00 PM (closed 12:30–1:00 PM for lunch); Wayne County Courthouse hours per County Offices page. Official information: https://waynecountyutah.gov/pages/county-offices.

Unincorporated Wayne County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); REMAINS CURRENT, UNCHANGED by the 7/1/2026 amendment; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on any Wayne County page found, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition; 2024 International Mechanical Code (IMC) — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 edition; 2024 International Fuel Gas Code (IFGC) — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 edition; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on any Wayne County page found, added here per statute since this record had previously omitted it entirely; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, UNCHANGED by the 7/1/2026 amendment; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on any Wayne County page found, added here per statute since this record had previously omitted it entirely; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('effective through June 30, 2026' / codes 'effective July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) remain unchanged. These are statewide mandatory minimum codes adopted by reference; Wayne County has not published any local code amendments or its own code-edition page beyond referencing the statewide codes generally, so there is no city-page lag to record..

No. Wayne County publishes no distinct solar or photovoltaic permit type, fee, or checklist anywhere on its site. Solar PV installation is treated as standard construction/electrical work under the county's single, unified Application for Building Permit and/or Certificate of Occupancy.

No dollar figure is published. As with all other permit types in Wayne County, the Rate/Permit Fee/Plan Review Fee fields on the Building Permit Application are completed by county staff at intake rather than published as a rate table. Call the Building Department at (435) 836-1302 for a project-specific quote.

Unincorporated Wayne County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Wayne County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Wayne County lands. Privacy.