Solar PV / Solar Panel Installation Permit in Unincorporated Wayne County, Utah
Wayne County does not publish a distinct solar / solar-PV installation permit type, fee, or checklist anywhere on its site (re-verified 2026-07-21: county-offices page, full Official Documents & Links listing, Administrative Manual, and FY2026 budget all checked directly, plus a full Wayback Machine CDX sweep of the county domain filtered for 'solar' — zero results). Solar PV installation is treated as standard construction/electrical work under the county's single, unified 'Application for Building Permit and/or Certificate of Occupancy' form — the same form and single county-wide Building Inspector (Eric Torgerson) used for all other permit types in this file. The form's trade-contractor lines are Permittee, Architect/Engineer, Building Contractor, Electrician, Plumber, and Heating — there is no solar or photovoltaic-specific line item or checkbox. As with every other permit type in this file, Wayne County has not published a dollar fee schedule — the Building Permit Application form's Rate/Permit Fee/Plan Review Fee fields are left blank and completed by county staff at intake.
Reviewed 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work (via the 'Alteration' or 'Addition' project-type checkbox)
- Proof of ownership of property
- Compliance with the 2024 IBC/IRC structural provisions and the 2023 NEC (National Electrical Code Article 690, Solar Photovoltaic Systems), which govern statewide per Utah Code § 15A-2-103(1)(a)-(b) and (1)(g)
- Electrical work must be performed by, or under the supervision of, a licensed electrical contractor listed on the Building Permit Application's 'Electrician' trade line
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
After electrical is in place, but before covering — per the county's standard inspection sequence documented in this file's residential-building-permit entry.
- 2
Electrical Final
Final electrical inspection.
See the full Unincorporated Wayne County inspection guide — scheduling & re-inspection fees →
Tips
- Wayne County runs one unified Building Permit process for every trade, including solar PV installation — there is no dedicated solar permit type, application, or fee category.
- As with every other permit type in this file, no dollar fee figure is published; call the Building Department at (435) 836-1302 or the Building Inspector directly for a project-specific quote.
- The same single Building Inspector (Eric Torgerson) who handles new construction also handles solar/electrical inspections for both unincorporated county land and incorporated towns (Loa, Bicknell, Torrey, Hanksville).
- This finding was re-verified 2026-07-21 by directly checking the county-offices page, the full Official Documents & Links listing (every uploaded PDF filename), the Administrative Manual, the FY2026 budget, and a Wayback Machine CDX sweep of the whole domain filtered for 'solar' — none surfaced a distinct solar permit, form, or fee.
- INDEPENDENT SECOND RE-VERIFICATION (2026-07-21, separate adversarial pass): re-fetched the live building-permit-application.pdf directly (bypassing the site's WAF via a browser-header request) and rendered both pages to images — the 'Rate / Permit Fee / Plan Review Fee / Amount Paid / Total' lines are confirmed genuinely blank underscored fields on the real form, not a cropping or OCR artifact. Re-checked the full /documents index and found two budget resolutions not previously cited in this file (reslution-12-15-2025-2026-budget.pdf and reslution-2025-06-amending-2025-budget.pdf); both were opened and contain only aggregate 'Building Department' expense ($65,000/$66,000) and 'Building Permit' revenue ($75,000-$99,000 for 2025, $80,000 for 2026) budget lines — no itemized per-permit-type or per-project-type dollar fee for solar, electrical, or otherwise. Re-checked the Administrative Manual by programmatically extracting text and searching every 'Fee Amount: $' occurrence in the entire document (20 instances covering every land-use and building-related application type in the manual, not just Chapter 14/15) — all 20 are blank with no dollar figure filled in. Note: the manual's actual chapter numbering has 'APPLICATION FEE AND REVIEW FEE SCHEDULES' as Chapter 14 and 'APPLICATIONS AND APPLICATION REVIEW PROCEDURES' as Chapter 15 (this file's source list below cites 'Chapter 15, Application Fee and Review Fee Schedules', which has the chapter number and title paired incorrectly — a citation labeling error, not a substantive one, since neither chapter contains a dollar figure). Pulled the Wayback Machine's full CDX index for the domain (not just a 'solar' keyword filter) and found an independently archived October 2025 capture of the same building-permit-application.pdf; rendered it and confirmed it is identical and equally blank. Also checked two other fee-related PDFs surfaced only via Wayback (citation-and-court-fees.pdf, wayne-county-recorder-fees-2019-.pdf) — both are unrelated court/recorder fee schedules with no building-permit content. A fresh web search for 'Wayne County Utah building permit fee schedule' and 'Wayne County Utah building permit fee 2026 solar' returned no Wayne-County-specific dollar figure from any source. Verdict: the 'no published fee schedule' finding holds up under an independent adversarial chase; confidence remains 'partial' because the underlying fact is an absence, not because the research was incomplete.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wayne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Wayne County
Solar PV / Solar Panel Installation Permit in other cities
Compare solar pv / solar panel installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Wayne County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Wayne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →