Accessory Dwelling Unit (ADU) Permit & Rental License — South Ogden, Utah · Requirements sheet
Verified 2026-07-07 · Source: https://www.utah.gov/pmn/files/1058839.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Permit & Rental License in South Ogden, Utah
Required for construction of internal, attached, or detached Accessory Dwelling Units under South Ogden City Code § 10-14-23, as amended by Ordinance 23-21 (effective 5 Dec 2023). A building permit is required for the construction/conversion, and a separate Rental Dwelling Business License is required if the owner receives any monetary compensation for the ADU.
Verified 2026-07-07 · Source
When you need this permit
- Permitted only in owner-occupied single-family dwellings; either the ADU or the principal residence must be occupied by the property owner Owner-builder
- No more than one ADU per lot
- Detached ADUs barred on lots under 10,000 sq ft; no minimum lot size for internal/attached ADUs
- Detached ADUs capped at 1,200 sq ft; no maximum size for internal/attached ADUs
- Detached ADU height: minimum 10 ft, maximum 19 ft (up to 24 ft for a pitched roof or 20 ft for a flat roof, with side/rear setbacks increased 1 ft per additional foot of height above 17 ft)
- Must include a kitchen and sanitation facilities (at least a 3/4 bathroom) separate from the main dwelling
- At least one additional off-street parking space beyond that required for the primary residence; not located in a front-yard setback
- Single utility meter per service, in the property owner's name
- May never be used as a short-term rental (rented under 30 days)
- A Rental Dwelling Business License is required if the owner receives any monetary compensation for the ADU, and cannot be granted without evidence of a Certificate of Occupancy
- Inspections required for compliance with building, fire, and health/safety codes before approval, per UCA § 10-9a-511.5
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
ADU Compliance Inspection
Required before rental-license approval; inspects for compliance with building, fire, and health/safety codes, per South Ogden City Code § 10-14-23(15) and UCA § 10-9a-511.5.
See the full South Ogden inspection guide — scheduling & re-inspection fees →
Tips
- The $10 fee in the official Fee Schedule is specifically labeled for an 'Interior' ADU rental license; South Ogden City Code § 10-14-23 as amended by Ordinance 23-21 also allows attached and detached ADUs, but no distinct rental-license fee line item for attached/detached ADUs was found separately in the Fee Schedule — the $10 Interior ADU line is the only ADU-specific rental fee published.
- After a Rental ADU License is approved, city staff record a notice with the Weber County Recorder's Office disclosing the ADU's existence and use restrictions — this follows the property, per Ordinance 23-21 § 20.
- An ADU cannot be 'grandfathered' — any ADU existing before Ordinance 23-21 is not automatically considered legal solely due to prior use.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Ogden
Accessory Dwelling Unit (ADU) Permit & Rental License in other cities
Compare accessory dwelling unit (adu) permit & rental license fees across Utah →
Look up this fee in a different city →
Now live
Build your South Ogden project checklist
Describe your project once and get every permit, document, and fee it triggers in South Ogden — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →