Solar Energy Permit in Unincorporated Fremont County, Wyoming

Fremont County has no general building permit for unincorporated-area construction (consistent with this database's other Fremont County permitTypes, limited to floodplain, septic, road-access, and electrical), so there is no county-issued structural/mounting permit for a small residential rooftop or accessory-scale ground-mount solar installation. The County's own FY 2026 Fee Schedule publishes a distinct fee only for 'COMMERCIAL SCALE WIND AND SOLAR' ($3,000 plus $300 per MW of installed capacity, plus all associated fully loaded permit review costs) — no fee line item exists for small residential-scale systems. Per the County's own Planning Department FAQ, 'Alternative Energy installation or alteration (solar, residential wind, generator, etc.)' requires plan review by the Wyoming State Fire Marshal's Office regardless of size or valuation, and the electrical interconnection permit itself is issued by the same state office, not the County.

Verified 2026-07-20 · Source

When you need this permit

  • No county building permit applies to unincorporated Fremont County — the County has not adopted a general building code, consistent with its other published permit types
  • A Wind and Solar Energy Facility fee of $3,000 plus $300/MW installed capacity applies specifically to COMMERCIAL SCALE wind/solar projects per the County's FY 2026 Fee Schedule — this does not apply to small residential rooftop or accessory-scale solar
  • Per the Planning Department FAQ, ANY alternative energy installation or alteration (solar, residential wind, generator, etc.) — regardless of size or valuation — requires plan review by the Wyoming State Fire Marshal's Office
  • The ELECTRICAL interconnection portion is issued by the Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) under the same statewide wiring-permit program documented in this database's electrical-permit entry for Fremont County, NOT by the County itself
  • Confirm whether a specific parcel falls within an incorporated city (e.g., Riverton, Lander) before assuming the county-level process applies — incorporated cities within Fremont County run separate permitting systems

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Scale Wind and Solar FeeFremont County Planning and Rural Addressing, FY 2026 Fee Schedule (effective 7-1-2026) — no fee line item exists for small residential-scale solar
$3,000 plus $300 per MW installed capacity, plus all associated fully loaded permit review costs
Standard Wiring Permit (State WSFM)Wyoming State Fire Marshal's Office wiring-permits program — see this database's electrical-permit entry for Fremont County for the full state fee table
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Solar Energy Permit permit actually take in Unincorporated Fremont County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical (State WSFM, separate permit)

    Conduit, disconnects, inverter, and interconnection point verified by a WSFM-assigned regional electrical inspector under the separate state wiring permit

See the full Unincorporated Fremont County inspection guide — scheduling & re-inspection fees →

Tips

  • Fremont County's own Planning Department FAQ states that ANY alternative energy installation — solar, residential wind, or generator — requires State Fire Marshal plan review 'regardless of size or valuation,' so don't assume a small rooftop system is exempt from state-level review just because it falls well under the $3,000 commercial-scale fee threshold.
  • Confirm whether your parcel is inside an incorporated city (Riverton, Lander, Dubois, etc.) before applying — those cities run their own separate building/electrical permitting systems distinct from the unincorporated-county process described here.

Frequently asked questions

Unincorporated Fremont County requires a solar energy permit for: No county building permit applies to unincorporated Fremont County — the County has not adopted a general building code, consistent with its other published permit types; A Wind and Solar Energy Facility fee of $3,000 plus $300/MW installed capacity applies specifically to COMMERCIAL SCALE wind/solar projects per the County's FY 2026 Fee Schedule — this does not apply to small residential rooftop or accessory-scale solar; Per the Planning Department FAQ, ANY alternative energy installation or alteration (solar, residential wind, generator, etc.) — regardless of size or valuation — requires plan review by the Wyoming State Fire Marshal's Office; The ELECTRICAL interconnection portion is issued by the Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) under the same statewide wiring-permit program documented in this database's electrical-permit entry for Fremont County, NOT by the County itself; Confirm whether a specific parcel falls within an incorporated city (e.g., Riverton, Lander) before assuming the county-level process applies — incorporated cities within Fremont County run separate permitting systems. If your project isn't listed, confirm with Fremont County Planning Department at (307) 332-1077 before starting work.

The County's own FY 2026 Fee Schedule publishes a solar fee only for COMMERCIAL SCALE wind/solar facilities ($3,000 plus $300/MW) — no fee line item exists for small residential rooftop or accessory-scale ground-mount solar, and the County has no general building permit program. The Wyoming State Fire Marshal's Office still requires plan review and issues the electrical interconnection permit regardless of project size.

Unincorporated Fremont County does not publish a plan-review timeline for this permit. Contact Fremont County Planning Department at (307) 332-1077 for current turnaround.

You'll need: WSFM Wiring Permit Application (online, eLicense portal). Depending on your project, Unincorporated Fremont County may also ask for: Commercial Scale Solar Energy Facility Application. See the required-documents checklist on this page for details on each.

Unincorporated Fremont County requires 1 inspection(s) for a solar energy permit, in order: Electrical (State WSFM, separate permit). Schedule each through Fremont County Planning Department ((307) 332-1077).

Apply through Fremont County Planning Department at 450 North 2nd Street, Lander, WY 82520. Phone: (307) 332-1077, email: support@fremontcountywy.gov. Office hours: Mon–Fri (contact department for current hours). Official information: https://fremontcountywy.gov/government/departments/planning_department/building_codes.php.

Unincorporated Fremont County, Wyoming has adopted: NO county-wide building code and NO county-specific building permit for private construction. Fremont County's own Planning Department page states verbatim: 'Fremont County does not have any County-wide Zoning or County specific Building Codes, except the following' (small wastewater/septic permits and floodplain zoning in mapped FEMA hazard areas near Lander, Riverton, Dubois, and Hudson) — https://fremontcountywy.gov/government/departments/planning_department/building_codes.php; Confirmed against the Wyoming Dept. of Fire Prevention & Electrical Safety 'LOCAL AND STATE JURISDICTIONS' chart (updated 7/7/2026 as of this check — the date label itself changed from a prior 5/11/2026, but the underlying Fremont County determination did not — embedded at wsfm.wyo.gov/electrical-safety): Fremont County's BLDG INSP/PR and ELEC INSP/PR columns are both still marked S/S (state) for the unincorporated county, meaning the county has NOT taken general building-code delegation under W.S. § 35-9-121 — the State of Wyoming, not Fremont County, has building jurisdiction over unincorporated private construction; Fremont County's own building-codes page RECOMMENDS (does not require) that residents follow the State of Wyoming's adopted codes for new construction: 2024 International Building Code, 2024 International Existing Building Code, 2024 International Mechanical Code, 2024 International Fire Code, 2024 International Fuel Gas Code, and the National Electrical Code (2023 edition was in effect through June 30, 2026; per wsfm.wyo.gov/electrical-safety, the 2026 NEC edition took effect statewide July 1, 2026) — these are recommendations for quality/insurability, not a locally enforced code, and the county issues no building permit and performs no building inspection against them; Fremont County explicitly states it does NOT issue Certificates of Occupancy; Commercial/public construction is NOT fully unregulated: per Wyoming Statute § 35-9-108, a State Fire Marshal plan review IS required for government/school buildings, buildings over 5,000 sq ft with public access, childcare centers (10+ children), multi-story buildings, places of assembly, fire-protection-system work, alternative energy installations (solar/wind/generator), aboveground flammable/combustible liquid storage tanks, Type I commercial kitchen hoods, spray finish applications, and RV/camping/mobile-home park site plans — contact the State Fire Marshal's Plan Review office (Jeff Schoen, (307) 673-1461, jeff.schoen@wyo.gov) for any of these commercial scopes; The Incorporated Cities within Fremont County (Riverton, Lander, Dubois, Hudson, Shoshoni, Pavillion, and South Pass City) each have their OWN separate zoning and building codes and issue their own permits — this LEAN page covers ONLY unincorporated (outside city-limits) Fremont County. See the separate City of Riverton page for Riverton's own building department.. Local amendments apply — see the Unincorporated Fremont County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Fremont County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.