Solar Energy Permit in Unincorporated Fremont County, Wyoming
Fremont County has no general building permit for unincorporated-area construction (consistent with this database's other Fremont County permitTypes, limited to floodplain, septic, road-access, and electrical), so there is no county-issued structural/mounting permit for a small residential rooftop or accessory-scale ground-mount solar installation. The County's own FY 2026 Fee Schedule publishes a distinct fee only for 'COMMERCIAL SCALE WIND AND SOLAR' ($3,000 plus $300 per MW of installed capacity, plus all associated fully loaded permit review costs) — no fee line item exists for small residential-scale systems. Per the County's own Planning Department FAQ, 'Alternative Energy installation or alteration (solar, residential wind, generator, etc.)' requires plan review by the Wyoming State Fire Marshal's Office regardless of size or valuation, and the electrical interconnection permit itself is issued by the same state office, not the County.
Verified 2026-07-20 · Source
When you need this permit
- No county building permit applies to unincorporated Fremont County — the County has not adopted a general building code, consistent with its other published permit types
- A Wind and Solar Energy Facility fee of $3,000 plus $300/MW installed capacity applies specifically to COMMERCIAL SCALE wind/solar projects per the County's FY 2026 Fee Schedule — this does not apply to small residential rooftop or accessory-scale solar
- Per the Planning Department FAQ, ANY alternative energy installation or alteration (solar, residential wind, generator, etc.) — regardless of size or valuation — requires plan review by the Wyoming State Fire Marshal's Office
- The ELECTRICAL interconnection portion is issued by the Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) under the same statewide wiring-permit program documented in this database's electrical-permit entry for Fremont County, NOT by the County itself
- Confirm whether a specific parcel falls within an incorporated city (e.g., Riverton, Lander) before assuming the county-level process applies — incorporated cities within Fremont County run separate permitting systems
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical (State WSFM, separate permit)
Conduit, disconnects, inverter, and interconnection point verified by a WSFM-assigned regional electrical inspector under the separate state wiring permit
See the full Unincorporated Fremont County inspection guide — scheduling & re-inspection fees →
Tips
- Fremont County's own Planning Department FAQ states that ANY alternative energy installation — solar, residential wind, or generator — requires State Fire Marshal plan review 'regardless of size or valuation,' so don't assume a small rooftop system is exempt from state-level review just because it falls well under the $3,000 commercial-scale fee threshold.
- Confirm whether your parcel is inside an incorporated city (Riverton, Lander, Dubois, etc.) before applying — those cities run their own separate building/electrical permitting systems distinct from the unincorporated-county process described here.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Fremont County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Fremont County
Solar Energy Permit in other cities
Compare solar energy permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Unincorporated Fremont County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Fremont County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →