Commercial Sign Permit in Unincorporated Laramie County, Wyoming

Required for installation of a commercial sign in unincorporated Laramie County. The permit is filed as a 'Commercial Sign' application through the county's Building Department, but sign LOCATION must additionally be approved by the Planning Department as part of the Certificate of Review (C.O.R.) process before the permit will be issued.

Verified 2026-07-22 · Source

When you need this permit

  • Apply online via the Laramie County, WY Public Portal (SmartGov) under Building Safety and Construction — Commercial, 'Commercial Sign' application type
  • Sign location must be approved by the Planning Department
  • Certificate of Review (C.O.R.) — an approved signed copy from the Planning Department is required, as with other commercial permit types
  • Foundation plans required: a copy of site-specific foundation plans, stamped by a Wyoming Design Professional
  • Site plans required: a clear set of site plans stamped by a Wyoming Design Professional
  • No distinct sign-permit fee line was found published by the county; charged under the general valuation-based Building Permit Fee / Plan Review Fee schedule, consistent with other commercial permit types that lack a dedicated flat fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit — no separate flat feeLaramie County Guidance for Commercial Projects (PDF); consistent with the 'general valuation table' rule already verified elsewhere in this jurisdiction file for electrical, plumbing, and demolition permits that also lack a dedicated fee line
Charged under the general valuation-based Building Permit Fee / Plan Review Fee schedule (2022 Building and Plan Review Fee Schedule) — the county's Guidance for Commercial Projects document lists only document requirements for 'Commercial Sign,' with no distinct flat sign-permit fee line
Plan Review FeeLaramie County 2022 Building and Plan Review Fee Schedule
65% of the Building Permit Fee, charged in addition to the Building Permit Fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Laramie County building department
~7–10 business days

How long did your Commercial Sign Permit permit actually take in Unincorporated Laramie County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Sign structure, mounting, and any electrical connection inspected for compliance with the approved plans

See the full Unincorporated Laramie County inspection guide — scheduling & re-inspection fees →

Tips

  • Laramie County does not publish a distinct sign-permit fee — commercial signs are billed under the same general valuation-based Building Permit Fee / Plan Review Fee schedule used for other commercial permit types without a dedicated fee line.
  • Sign location must be approved by the Planning Department as part of the Certificate of Review (C.O.R.) — confirm siting with Planning (307-633-4303 / planning@laramiecountywy.gov) before applying, since sign placement is called out as a distinct check beyond the standard C.O.R. review for other commercial permits.
  • This entry covers COMMERCIAL signs, the only sign category documented in the county's published Guidance for Commercial Projects handout; no separate residential/agricultural sign process was found published by the county as of this review.

Frequently asked questions

Unincorporated Laramie County requires a commercial sign permit for: Apply online via the Laramie County, WY Public Portal (SmartGov) under Building Safety and Construction — Commercial, 'Commercial Sign' application type; Sign location must be approved by the Planning Department; Certificate of Review (C.O.R.) — an approved signed copy from the Planning Department is required, as with other commercial permit types; Foundation plans required: a copy of site-specific foundation plans, stamped by a Wyoming Design Professional; Site plans required: a clear set of site plans stamped by a Wyoming Design Professional; No distinct sign-permit fee line was found published by the county; charged under the general valuation-based Building Permit Fee / Plan Review Fee schedule, consistent with other commercial permit types that lack a dedicated flat fee. If your project isn't listed, confirm with Laramie County Planning and Development Department — Building Division at (307) 633-4303 before starting work.

The county publishes no distinct flat sign-permit fee. Sign permits are charged under the general valuation-based Building Permit Fee and Plan Review Fee schedule, the same table used for other commercial permit types that lack a dedicated fee line.

Plan review for a commercial sign permit in Unincorporated Laramie County typically runs 7–10 business days. This is an estimate, not a published figure — confirm current review times with Laramie County Planning and Development Department — Building Division at (307) 633-4303.

You'll need: Commercial Permit Application (SmartGov portal); Certificate of Review (C.O.R.); Site Plan; Foundation Plans. See the required-documents checklist on this page for details on each.

Unincorporated Laramie County requires 1 inspection(s) for a commercial sign permit, in order: Final. Schedule each through Laramie County Planning and Development Department — Building Division ((307) 633-4303).

Apply through Laramie County Planning and Development Department — Building Division at 3966 Archer Parkway, Cheyenne, WY 82009. Phone: (307) 633-4303, email: building@laramiecountywy.gov. Office hours: Monday–Friday 7:00 AM–5:30 PM (closed Saturday/Sunday); Building Inspection line (307) 633-4615; fax (307) 633-4519. Official information: https://www.laramiecountywy.gov/County-Government/County-Departments/Planning-Development/Laramie-County-Building.

Unincorporated Laramie County, Wyoming has adopted: 2024 International Building Code (IBC) — adopted with amendments effective January 1, 2025 (Laramie County 2024 International Building Code Adoption resolution); 2024 International Residential Code (IRC) — adopted with amendments effective January 1, 2025; Section R105.2 (Work Exempt from Permit) amended by Resolution #251202-14 (passed Dec. 2, 2025) raising the detached accessory-structure permit exemption threshold from 200 to 400 square feet; 2024 International Residential Code Section R303.5.10 amendment — Laramie County provided statutory notice of intent to exempt residential detached accessory buildings without habitable space from the closed-cell spray foam insulation requirements of R306.6 (Resolution dated 9/16/25); 2024 International Fire Code (IFC) — adopted effective April 15, 2025; 2023 National Electrical Code (NEC) — adopted by Laramie County Board of Commissioners resolution at the December 5, 2023 public hearing; IRC Appendix BC — Accessory Dwelling Units (ADU): Laramie County's official ADU construction handout is the 2024 IRC Appendix BC text itself (scanned/distributed as the county's ADU building-code standard). Local amendments apply — see the Unincorporated Laramie County overview page for the full list.

Yes. Commercial signs require a building permit application (the 'Commercial Sign' application type) through the SmartGov portal, plus Planning Department approval of the sign location as part of the Certificate of Review (C.O.R.) process.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Laramie County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.