EV Charger / EVSE Permit in Unincorporated Laramie County, Wyoming

Laramie County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment (Level 2 or DC fast charging) requires a standalone Electrical (Counter) Permit, or an electrical trade permit combined with a building permit for new commercial charging installations, governed by the county-adopted 2023 National Electrical Code (which includes Article 625, Electric Vehicle Power Transfer System). Per the county's own fee schedule and Building/Plan Review Fee documents, this Counter electrical work is charged under the same general valuation-based Building Permit Fee / Plan Review Fee schedule used for all standalone electrical work in unincorporated Laramie County — there is no dedicated flat EV-charger fee line.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical (Counter) Permit required for EV charger/EVSE installation in unincorporated Laramie County, applied through the county SmartGov portal or in person at 3966 Archer Parkway, Cheyenne, WY
  • Installation must comply with the county-adopted 2023 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System)
  • Homeowner may self-perform EV charger wiring on their own primary residence without being a licensed electrician, per the county Building Department FAQ; electricians working for others must be licensed and registered with the Wyoming Dept. of Fire Prevention and Electrical Safety Owner-builderContractor
  • Electrical services or upgrades over 200 amps (e.g., for multi-port or DC fast charging installations) require an engineered one-line diagram and plan review
  • No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical (Counter) Permit — EV charger/EVSE, no separate flat feeLaramie County Building Permit Fee Schedule (PDF); confirmed by the same 2022 fee schedule documented on this jurisdiction's Electrical Permit entry — electrical Counter work has no dedicated flat fee line, including for EV charger/EVSE installations.
Charged under the general valuation-based Building Permit Fee / Plan Review Fee schedule (2022 Building and Plan Review Fee Schedule)

Review timeline

Plan reviewUnincorporated Laramie County’s published plan-review target
7–10 business days

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Laramie County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Electrical

    EVSE circuit, breaker, disconnect, and equipment mounting inspected for compliance with the adopted 2023 NEC Article 625

See the full Unincorporated Laramie County inspection guide — scheduling & re-inspection fees →

Tips

  • Laramie County has no distinct EV charger/EVSE fee — a typical residential Level 2 charger install is billed under the same general valuation-based fee schedule as any other standalone electrical Counter permit.
  • Services or panel upgrades over 200 amps (common for multi-port or DC fast charging installs) require an engineered one-line diagram and plan review, same as for any large electrical service.

Frequently asked questions

Unincorporated Laramie County requires an ev charger / evse permit for: Electrical (Counter) Permit required for EV charger/EVSE installation in unincorporated Laramie County, applied through the county SmartGov portal or in person at 3966 Archer Parkway, Cheyenne, WY; Installation must comply with the county-adopted 2023 National Electrical Code, Article 625 (Electric Vehicle Power Transfer System); Homeowner may self-perform EV charger wiring on their own primary residence without being a licensed electrician, per the county Building Department FAQ; electricians working for others must be licensed and registered with the Wyoming Dept. of Fire Prevention and Electrical Safety; Electrical services or upgrades over 200 amps (e.g., for multi-port or DC fast charging installations) require an engineered one-line diagram and plan review; No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review. If your project isn't listed, confirm with Laramie County Planning and Development Department — Building Division at (307) 633-4303 before starting work.

No distinct EV charger/EVSE fee line item is published. Installation is billed as a standard Electrical (Counter) Permit under the county's general valuation-based Building Permit Fee / Plan Review Fee schedule. Source: Laramie County Building Permit Fee Schedule (PDF).

Unincorporated Laramie County's published plan-review target for an ev charger / evse permit is 7–10 business days.

You'll need: Counter Permit Application — Electrical (SmartGov portal). See the required-documents checklist on this page for details on each.

Unincorporated Laramie County requires 1 inspection(s) for an ev charger / evse permit, in order: Final Electrical. Schedule each through Laramie County Planning and Development Department — Building Division ((307) 633-4303).

Apply through Laramie County Planning and Development Department — Building Division at 3966 Archer Parkway, Cheyenne, WY 82009. Phone: (307) 633-4303, email: building@laramiecountywy.gov. Office hours: Monday–Friday 7:00 AM–5:30 PM (closed Saturday/Sunday); Building Inspection line (307) 633-4615; fax (307) 633-4519. Official information: https://www.laramiecountywy.gov/County-Government/County-Departments/Planning-Development/Laramie-County-Building.

Unincorporated Laramie County, Wyoming has adopted: 2024 International Building Code (IBC) — adopted with amendments effective January 1, 2025 (Laramie County 2024 International Building Code Adoption resolution); 2024 International Residential Code (IRC) — adopted with amendments effective January 1, 2025; Section R105.2 (Work Exempt from Permit) amended by Resolution #251202-14 (passed Dec. 2, 2025) raising the detached accessory-structure permit exemption threshold from 200 to 400 square feet; 2024 International Residential Code Section R303.5.10 amendment — Laramie County provided statutory notice of intent to exempt residential detached accessory buildings without habitable space from the closed-cell spray foam insulation requirements of R306.6 (Resolution dated 9/16/25); 2024 International Fire Code (IFC) — adopted effective April 15, 2025; 2023 National Electrical Code (NEC) — adopted by Laramie County Board of Commissioners resolution at the December 5, 2023 public hearing; IRC Appendix BC — Accessory Dwelling Units (ADU): Laramie County's official ADU construction handout is the 2024 IRC Appendix BC text itself (scanned/distributed as the county's ADU building-code standard). Local amendments apply — see the Unincorporated Laramie County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Laramie County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.