Residential Building Permit (New Single-Family Residence) in Gila Bend, Arizona

Required for new single-family residence construction in the Town of Gila Bend. Reviewed against the 2006 IRC/IBC as codified in Chapter 150, with plan review and inspections administered by Willdan Engineering under contract to the Town's Community Development Building and Safety Division.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family residence construction within Gila Bend town limits
  • Plans must comply with the 2006 IRC/IBC as adopted by the Town (§ 150.15, § 150.20) and the Residential Solar Readiness Ordinance (§ 150.04) requiring later-installation provisions for solar water heating and/or solar electric systems unless a complete solar system is installed at construction
  • Completed Project Submittal Form/Building Permit Application (including owner information) and Plan Review Fee required at submittal
  • Two (2) complete sets of plans; two (2) extra site plans for Engineering review; structural calcs and truss calcs (if applicable, truss calcs can be deferred); two (2) 8.5x11 plot plans
  • Seismic Design Category C applies

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown of Gila Bend Fee Schedule (last confirmed-amended 06/07/16, document on file 5/14/18), calculated per 2006 IBC square-foot construction cost valuation tables; this is the most current fee schedule publicly available after exhaustive search — no newer resolution/fee-schedule document was found published on the Town's site as of this review
$26.00 (valuation $1-$500); scaling per additional-increment table up to $5,608.75 for the first $1,000,000 + $3.65 per additional $1,000 above that
Building Plan ReviewTown of Gila Bend Fee Schedule; Hourly Plan Review alternative billed at $50/permit, General Plan Review at $65/hour
65% of Permit Fee (includes 1st and 2nd review)

Review timeline

Plan reviewGila Bend’s published plan-review target
15–15 business days

How long did your Residential Building Permit (New Single-Family Residence) permit actually take in Gila Bend?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Exterior/Interior Footings

    Setbacks per approved site plan; depth, width, reinforcement steel placement; Ufer ground in place at electric meter location

  2. 2

    Stem Wall

    Forms, reinforcing steel size/location, hold-down straps per approved plans, before pour

  3. 3

    Framing, Rough Plumbing, Mechanical & Electrical

    Combined inspection for single-family construction; no insulation or wallboard installed until approved

  4. 4

    Drywall / Exterior Lath

    Fasteners, material, penetrations; foam board/lath wire/vapor barrier/weep screed installation per manufacturer ICBO/ICC/NES reports

  5. 5

    Final Inspection

    Compliance with Building, Electrical, Plumbing, and Mechanical Code requirements and approved plans

See the full Gila Bend inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town's Turn Around Times for Submittals document (Community Development, doc dated 8/8/16), Residential new-construction plan review is projected at 15 working days for initial review (these are projected timeframes only and may change due to workload/staffing per the document's own disclaimer).
  • The Town's Fee Schedule is dated on-file 5/14/18 with its own header showing the last substantive amendment as 06/07/16 (a further 08/21/18 amendment is marked 'Proposed' on the same document) — no newer fee schedule was found published; treat dollar figures as the best-available verified baseline, subject to reconfirmation with Willdan Engineering/Community Development for current pricing.
  • Gila Bend's codified ICC edition base is 2006 (IBC, IMC, IPC, IRC) / 2005 NEC — notably older than many neighboring Maricopa County municipalities that have since updated to 2018/2021/2024-cycle codes; no evidence of a subsequent code-update ordinance was found in the current AM Legal-hosted Code of Ordinances (current through Ord. 25-03, passed 10-14-2025) as of this review.

Frequently asked questions

Gila Bend requires a residential building permit (new single-family residence) for: Building permit required for new single-family residence construction within Gila Bend town limits; Plans must comply with the 2006 IRC/IBC as adopted by the Town (§ 150.15, § 150.20) and the Residential Solar Readiness Ordinance (§ 150.04) requiring later-installation provisions for solar water heating and/or solar electric systems unless a complete solar system is installed at construction; Completed Project Submittal Form/Building Permit Application (including owner information) and Plan Review Fee required at submittal; Two (2) complete sets of plans; two (2) extra site plans for Engineering review; structural calcs and truss calcs (if applicable, truss calcs can be deferred); two (2) 8.5x11 plot plans; Seismic Design Category C applies. If your project isn't listed, confirm with Town of Gila Bend Community Development — Building and Safety Division (building safety/plan review/inspections contracted to Willdan Engineering) at 928-235-6362 (Community Development); 480-489-2463 (Willdan Engineering, building safety/inspections) before starting work.

In Gila Bend, the published Building Permit Fee — Based on Valuation is: $26.00 (valuation $1-$500); scaling per additional-increment table up to $5,608.75 for the first $1,000,000 + $3.65 per additional $1,000 above that. Additional published fees: Building Plan Review — 65% of Permit Fee (includes 1st and 2nd review). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town of Gila Bend Turn Around Times for Submittals document, Residential new-construction plan review is projected at 15 working days for the initial review; the document notes these are projected timeframes only and may change due to workload and staffing considerations.

You'll need: Building Permit Application / Project Submittal Form; Building Plan Check Submittal Checklist (rev. 8.6.16) — New Single Family Residences section; Site/Plot Plan (8.5x11, two sets). See the required-documents checklist on this page for details on each.

Gila Bend requires 5 inspection(s) for a residential building permit (new single-family residence), in order: Exterior/Interior Footings, Stem Wall, Framing, Rough Plumbing, Mechanical & Electrical, Drywall / Exterior Lath, Final Inspection. Schedule each through Town of Gila Bend Community Development — Building and Safety Division (building safety/plan review/inspections contracted to Willdan Engineering) (928-235-6362 (Community Development); 480-489-2463 (Willdan Engineering, building safety/inspections)).

Apply through Town of Gila Bend Community Development — Building and Safety Division (building safety/plan review/inspections contracted to Willdan Engineering) at 644 W. Pima St., P.O. Box A, Gila Bend, AZ 85337. Phone: 928-235-6362 (Community Development); 480-489-2463 (Willdan Engineering, building safety/inspections), email: planning@gilabendaz.org (Community Development); BuildingSafetyAZ@willdan.com (Willdan Engineering, building safety/permit/inspection questions). Office hours: Monday - Friday, 8:00 a.m. - 4:00 p.m. Building plan review, permit issuance, and inspections are administered under contract by Willdan Engineering; the Town's Community and Economic Development office handles zoning/planning intake at the same address.. Official information: https://www.gilabendaz.org/279/Building-and-Safety.

Gila Bend, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-municipality authority under state enabling statutes (A.R.S. Title 9). The Town of Gila Bend adopts and administers its own construction codes through its Community Development Building and Safety Division, which contracts building-safety plan review and inspection services to Willdan Engineering; the Town does not defer permitting to Maricopa County. Source: Town of Gila Bend Code of Ordinances, Chapter 150 (Building Regulations; Construction) and Town of Gila Bend Building and Safety page (gilabendaz.org/279/Building-and-Safety).; 2006 International Building Code (IBC), copyrighted by the International Code Council, adopted by reference as the "Building Code of the Town of Gila Bend" (Gila Bend Code of Ordinances § 150.15; 1996 Code, § 15.08.010; Ord. 95-010-005; Ord. 01-03; Ord. 08-02). At least three copies are required to be filed with the Town Clerk. No adoption of a later ICC edition (e.g., 2018/2021 IBC) was found in the current codified ordinances as of this review — the 2006 edition remains the codified baseline.; 2005 National Electrical Code (NEC), copyrighted by the National Fire Protection Association, adopted by reference as the "Electrical Code for the Town of Gila Bend" (§ 150.16; 1996 Code, § 15.12.010; Ord. 95-010-005; Ord. 01-03; Ord. 08-02).; 2006 International Mechanical Code (IMC), adopted by reference as the "Mechanical Code for the Town of Gila Bend" (§ 150.17; 1996 Code, § 15.16.010; Ord. 95-010-005; Ord. 01-03; Ord. 08-02).; 2006 International Plumbing Code (IPC), adopted by reference as the "Plumbing Code for the Town of Gila Bend" (§ 150.18; 1996 Code, § 15.20.010; Ord. 95-010-005; Ord. 01-03; Ord. 08-02).; 2006 International Fire Code (IFC), adopted by reference and codified under the heading "Uniform Code for the Abatement of Dangerous Buildings" as the "Fire Code for the Town of Gila Bend" (§ 150.19; 1996 Code, § 15.24.010; Ord. 95-010-005; Ord. 08-02).; 2006 International Residential Code (IRC), copyrighted by the International Code Council, adopted by reference as the "Residential Code for the Town of Gila Bend," with a local amendment to IRC Chapter 23 / Section M2301 (Residential Solar Readiness — solar energy systems) (§ 150.20; Ord. 10-12, passed 10-26-2010).; Building permit valuations for fee purposes are determined using the most current building valuation data table published by the International Code Council in Building Safety Journal magazine, as republished from time to time; any valuation not specifically covered is classified by the Building Official by nearest-resembling use/construction type (§ 150.03; Ord. 09-02, passed 2-10-2009). The Town's own Fee Schedule (last confirmed amendment 06/07/16, on file as of 5/14/18) also states valuations are calculated per the 2006 IBC square-foot construction cost tables.; Buildings must conform to the Town's zoning ordinance in addition to Chapter 150 whenever a building permit is issued and inspected (§ 150.01; 1996 Code, § 15.04.010).; The Building Official function (all building, plumbing, electrical, or other inspection matters referenced anywhere in Chapter 150) is vested in the office of the Town Clerk, with Council-authorized deputies as needed (§ 150.02; 1996 Code, § 15.04.020) — in current practice this function is carried out through the Community Development Department's contract with Willdan Engineering.; Manufactured homes and factory-built buildings ("on-site permits") are separately regulated: manufactured home permits require 3 plot plans (8.5x11) and zoning clearance; factory-built buildings require 2 complete plan sets bearing approval of the Arizona State Division of Building Codes. Source: Town of Gila Bend Building Plan Check Submittal Checklist (rev. 8.6.16).. Local amendments apply — see the Gila Bend overview page for the full list.

The 2006 International Residential Code and 2006 International Building Code, as codified in Town of Gila Bend Code of Ordinances §§ 150.15 and 150.20, along with the Residential Solar Readiness Ordinance (§ 150.04) requiring solar-ready provisions unless a complete solar system is installed at construction.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gila Bend building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.