Commercial Tenant Improvement Permit — Goodyear, Arizona · Requirements sheet
Verified 2026-08-01 · Source: https://www.goodyearaz.gov/business/development-center/fees
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement Permit in Goodyear, Arizona
Required for interior or exterior alterations, upgrades, and repairs to an existing commercial building in Goodyear ('Tenant Improvement' under the Commercial Fees table and under the 'Commercial Construction' section of the Plan Review Target Time Frames page). Billed on the exact same fee formula as new commercial construction (65% plan review + Table 1-A permit fee + $86 Planning and Zoning + $102 Application), so this is not a case of a separate fee schedule -- but the City's own Plan Review Target Time Frames page assigns Tenant Improvement a distinctly faster review track (5 business days prescreen / 15 business days 1st department review / 10 business days 2nd+ review) than New Commercial (5/25/15), a real, published difference in process timing that justifies documenting it as its own permit type rather than folding it into the Commercial Building Permit entry.
Verified 2026-08-01 · Source
When you need this permit
- Building permit required for changes, alterations, upgrades, and repairs to the interior or exterior of an existing commercial building; reviewed against the 2018 IBC and City of Goodyear amendments (City Code Section 9-1-1), plus ICC A117.1-2009 where accessibility is affected
- Billed identically to New Commercial construction under the Commercial Fees 'Tenant Improvement' line: 65% of the Table 1-A permit fee for plan review, plus the Table 1-A valuation-based permit fee itself, an $86 Planning and Zoning fee, and a $102 application fee -- confirmed by direct word-position (bbox) extraction of the Fee Schedule PDF, which shows the 'Tenant Improvement' fee line and the 'New Construction and Additions' fee line use the identical four-part formula
- Despite the identical fee formula, the City's Plan Review Target Time Frames page lists 'Tenant Improvement' as its own row under 'Commercial Construction' with a materially faster target than 'New Commercial': 5 business days prescreen / 15 business days 1st department review / 10 business days 2nd+ review, versus 5/25/15 for New Commercial
- Unlike the 'New Construction and Additions*' fee line, the 'Tenant Improvement' fee line in the Commercial Fees table does not carry a Development Impact Fee asterisk -- consistent with tenant improvement work not typically adding new floor area subject to impact fees, though a project-specific addition of floor area within a TI scope should be confirmed with Building Safety
- Fire Plan Review Fees (35% of the calculated permit fee) apply in addition to Building Plan Review Fees where the TI scope alters fire-code-regulated systems
- Application submitted via the City's Accela Citizen Access (ACA) online portal, the same portal and process used for new commercial construction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Mechanical/Electrical/Plumbing
Rough-in of any altered or added mechanical, electrical, or plumbing systems before concealment
- 2
Fire (where applicable)
Fire sprinkler, alarm, or suppression system rough-in and final testing where the TI scope alters fire-code-regulated systems
- 3
Final / Certificate of Occupancy
Final inspection required before the tenant space may be occupied under the new scope of work
See the full Goodyear inspection guide — scheduling & re-inspection fees →
Tips
- Tenant Improvement is billed on the exact same fee line as New Commercial construction (65% plan review + Table 1-A permit + $86 Planning and Zoning + $102 Application) -- there is no separate, cheaper TI fee schedule in Goodyear.
- The review timeline is genuinely faster, though: Tenant Improvement targets 5/15/10 business days (prescreen/1st review/2nd+ review) versus New Commercial's 5/25/15, per the City's Plan Review Target Time Frames page (updated 2/12/2026).
- The 'Tenant Improvement' fee line does not carry the Development Impact Fee asterisk that 'New Construction and Additions*' does -- budget accordingly, but confirm with Building Safety if your TI scope adds new floor area.
- Fire Plan Review (35% of permit fee) applies in addition to Building Plan Review (65% of permit fee) where fire-code-regulated systems are altered, per the City's Building Safety Fees overview.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Goodyear.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Goodyear
Commercial Tenant Improvement Permit in other cities
Compare commercial tenant improvement permit fees across Arizona →
Look up this fee in a different city →