Goodyear building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Goodyear, Arizona.
Verified 2026-07-03 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 1900 N. Civic Square, 2nd Floor, Goodyear, AZ 85395
- Phone
- 623-932-3910
- Office hours
- Development Center, 1900 N. Civic Square, Goodyear, AZ 85395; general Development Services line 623-932-3910; development counter/fee questions 623-932-3004 option 2; project fee estimate requests developmentcounter@goodyearaz.gov
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction / Custom Single-Family Home)
- 1
Foundation/Footing
Before concrete pour — foundation and rebar per approved plans
- 2
Framing
Structural framing per approved plans and 2018 IRC
- 3
Rough Mechanical/Electrical/Plumbing
Rough-in of mechanical, electrical, and plumbing systems before wall closure
- 4
Final
Final inspection for Certificate of Occupancy or Certificate of Completion, included in the building permit fee
Applies to: Accessory Dwelling Unit / Detached Guest House / Casita Permit
- 1
Foundation/Footing
Before concrete pour for the detached structure
- 2
Framing
Structural framing per approved plans
- 3
Final
Final inspection for occupancy of the accessory structure
Applies to: Residential Addition / Alteration / Remodel Permit
- 1
Footing/Foundation
Required before concrete pour for additions, detached garages, or casitas
- 2
Framing
Structural framing and connections to the existing structure
- 3
Final
All work complete per approved plans
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before wall closure
- 2
Final
Devices installed, panel labeled, protections verified per 2017 NEC
Applies to: EV Charger / Electric Vehicle Charging Station Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before concealment
- 2
Final
New circuit, breaker sizing, and disconnect verified before the charger is energized
Applies to: Fence, Wall, and Retaining Wall Permit
- 1
Footing
Required for engineered retaining walls before backfill
- 2
Final
Completed fence/wall verified against approved plans
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment rough-in before wall closure
- 2
Final
Equipment operational, clearances and venting verified per 2018 IMC
Applies to: Plumbing Permit
- 1
Rough-In
Pipe installation before wall closure or concealment
- 2
Final
All fixtures connected, water heater T&P valve verified, no leaks
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, and interconnection point verified
Final inspection only: Demolition Permit, Re-Roof Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Goodyear building permits
Get alerts for Goodyear
We'll email you when Goodyear's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.