Commercial Building Permit (New Commercial Construction) in Goodyear, Arizona
Required for new commercial building construction in Goodyear, billed under the Development Services Fee Schedule's Commercial Fees 'New Construction and Additions' line item and reviewed against the 2018 IBC and City of Goodyear amendments (City Code Section 9-1-1) plus ICC A117.1-2009 accessibility standards. Tenant improvement work to an existing commercial building is NOT folded into this entry: although the 'New Construction and Additions' and 'Tenant Improvement' fee lines in the Commercial Fees table are billed identically (65% plan review + Table 1-A permit fee + $86 Planning and Zoning + $102 Application), the City's own Plan Review Target Time Frames page lists them as two separate rows under 'Commercial Construction' with materially different target windows -- New Commercial at 5/25/15 business days versus Tenant Improvement at 5/15/10 business days -- so tenant improvement is documented as its own commercial-tenant-improvement-permit entry in this file.
Verified 2026-08-01 · Source
When you need this permit
- Building permit required for new commercial building construction; reviewed against the 2018 IBC and City of Goodyear amendments (City Code Section 9-1-1, 'Adoption by reference'), plus ICC A117.1-2009 and the 2010 ADA Standards for Accessible Design
- 'Commercial permits require plan review by Building Safety personnel,' per the header of the Commercial Fees section of the Development Services Fee Schedule
- New Commercial construction is billed under the Commercial Fees 'New Construction and Additions' line: 65% of the Table 1-A permit fee for plan review, plus the Table 1-A valuation-based permit fee itself (the same valuation table used for the Residential Building Permit in this file), an $86 Planning and Zoning fee, and a $102 application fee
- Subject to Development Impact Fees in addition to permit and plan review fees -- the Commercial Fees table specifically asterisks the 'New Construction and Additions*' line item with 'Subject to Development Impact Fees in addition to those shown above,' due at permit issuance and varying by zone (North, South, Northwest Rainbow Valley)
- Fire Plan Review Fees (35% of the calculated permit fee, minimum charge per application) apply in addition to Building Plan Review Fees where the scope includes fire-code-regulated systems (sprinkler, alarm, hood suppression, etc.)
- Application submitted via the City's Accela Citizen Access (ACA) online portal, the same portal used for residential submittals -- Goodyear does not use a separate email-based commercial intake process
- Building/Fire plan review is valid for 180 days from plan approval (one 180-day extension available by written request); building/fire permits are valid for 180 days from issuance or the last passed inspection, whichever is later (one 180-day extension available)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour -- foundation and rebar per approved plans and 2018 IBC
- 2
Framing / Structural
Structural framing and connections per approved plans and 2018 IBC
- 3
Rough Mechanical/Electrical/Plumbing
Rough-in of mechanical, electrical, and plumbing systems before concealment
- 4
Fire (where applicable)
Fire sprinkler, alarm, or suppression system rough-in and final testing, reviewed separately under the Fire Plan Review Fee where the scope includes fire-code-regulated systems
- 5
Final / Certificate of Occupancy
Final inspection required for Certificate of Occupancy before the building may be occupied
See the full Goodyear inspection guide — scheduling & re-inspection fees →
Tips
- New Commercial construction has a Plan Review Target Time Frame of 5 (prescreen) / 25 (1st department review) / 15 (2nd+ review) business days per the City's Review Times page (updated 2/12/2026) -- noticeably slower than the 5/15/10 target for Tenant Improvement under the same 'Commercial Construction' category, even though both are billed on the identical fee line structure.
- The 'New Construction and Additions*' fee line carries an explicit Development Impact Fee asterisk that the 'Tenant Improvement' line does not -- consistent with impact fees generally applying to new floor area rather than interior work in an existing building.
- Fire Plan Review (35% of permit fee) is billed separately from Building Plan Review (65% of permit fee) where fire-code-regulated systems are part of the project scope, per the City's Building Safety Fees overview.
- No standard (non-temporary) Certificate of Occupancy fee was found in the published Fee Schedule; only a Temporary Certificate of Occupancy/Completion fee ($500 initial, 45-day validity) is separately listed under Miscellaneous Fees.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Goodyear.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Goodyear
Commercial Building Permit (New Commercial Construction) in other cities
Compare commercial building permit (new commercial construction) fees across Arizona →
Look up this fee in a different city →
Now live
Build your Goodyear project checklist
Describe your project once and get every permit, document, and fee it triggers in Goodyear — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →