Electrical Permit in Goodyear, Arizona

Required for electrical installation, alteration, or repair in Goodyear, governed by the 2017 National Electrical Code (NEC) as adopted by the City of Goodyear. Panel upgrades, EV chargers, energy storage, and additional outlets/circuits at 600 volts or less and not over 400 amperes use a dedicated fee schedule; Express Lane and EZ Permit tracks are available for like-for-like panel changeouts and meter clearances.

Verified 2026-07-03 · Source

When you need this permit

  • Electrical permit required for installation, alteration, or repair of hard-wired electrical systems; governed by the 2017 NEC as adopted by the City of Goodyear
  • Electrical — 600 Volts or less, Not Over 400 Amperes covers additional outlets, panel upgrades, energy storage, and EV chargers; plan review is $0 up to $10,000 valuation or $97/hr (min 1/2 hr $50) above $10,000, plus a $55 base, $34 permit, and $102 application fee
  • Higher-voltage/amperage services (401-1,000 amperes, or over 600V/1,000A) use the same plan-review structure with higher permit-fee tiers ($82 and $115 respectively)
  • Residential Panel Change Out (like-for-like only) and Electrical Meter Clearance qualify for Express Lane review (under 7 working days)
  • Electrical Panel (like-for-like, 200 amp max) and Electrical Meter Clearance also qualify for the EZ Permit Application track (5/6/6 business-day target)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Electrical — 600V or less, Not Over 400 Amperes (residential; outlet, panel upgrade, energy storage, EV charger)City of Goodyear Development Services Fee Schedule, Residential Fees
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $34 Permit + $102 Application
Electrical — 600V and over 401-1,000 AmperesCity of Goodyear Development Services Fee Schedule, Residential Fees
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $82 Permit + $102 Application
Electrical — Over 600V or Over 1,000 AmperesCity of Goodyear Development Services Fee Schedule, Residential Fees
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $115 Permit + $102 Application
Express Lane — Electrical Residential Panel Change Out (like-for-like only)City of Goodyear Development Services Fee Schedule, Express Lane Fees
$55 Base + $102 Application = $157 Total
Express Lane — Electrical Meter Clearance (residential only)City of Goodyear Development Services Fee Schedule, Express Lane Fees
$55 Base + $102 Application = $157 Total
Express Lane — Electrical Panel Upgrade (residential, up to 400 amps)City of Goodyear Development Services Fee Schedule, Express Lane Fees
$55 Base + $34 Permit + $102 Application = $191 Total

Review timeline

Plan reviewGoodyear’s published plan-review target
5–6 business days

How long did your Electrical Permit permit actually take in Goodyear?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before wall closure

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

See the full Goodyear inspection guide — scheduling & re-inspection fees →

Tips

  • Residential Electrical has a Plan Review Target Time Frame of 5/6/6 business days per the Review Times page (updated 2/12/2026); a like-for-like Electrical Panel (200A max) or Electrical Meter Clearance may instead use the EZ Permit track, also 5/6/6 business days.
  • Replacement of a circuit breaker or fuse of the same rating, in the same location, using original/suitable-alternative equipment does not require a permit, per the Homeowner Info page.
  • Light fixture replacement does not require a permit as long as wiring is not changed, per the Homeowner Info page.

Frequently asked questions

Goodyear requires an electrical permit for: Electrical permit required for installation, alteration, or repair of hard-wired electrical systems; governed by the 2017 NEC as adopted by the City of Goodyear; Electrical — 600 Volts or less, Not Over 400 Amperes covers additional outlets, panel upgrades, energy storage, and EV chargers; plan review is $0 up to $10,000 valuation or $97/hr (min 1/2 hr $50) above $10,000, plus a $55 base, $34 permit, and $102 application fee; Higher-voltage/amperage services (401-1,000 amperes, or over 600V/1,000A) use the same plan-review structure with higher permit-fee tiers ($82 and $115 respectively); Residential Panel Change Out (like-for-like only) and Electrical Meter Clearance qualify for Express Lane review (under 7 working days); Electrical Panel (like-for-like, 200 amp max) and Electrical Meter Clearance also qualify for the EZ Permit Application track (5/6/6 business-day target). If your project isn't listed, confirm with City of Goodyear Development Services — Building Safety Division at 623-932-3910 before starting work.

In Goodyear, the published Electrical — 600V or less, Not Over 400 Amperes (residential; outlet, panel upgrade, energy storage, EV charger) is: $0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $34 Permit + $102 Application. Additional published fees: Electrical — 600V and over 401-1,000 Amperes — $0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $82 Permit + $102 Application; Electrical — Over 600V or Over 1,000 Amperes — $0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $115 Permit + $102 Application; Express Lane — Electrical Residential Panel Change Out (like-for-like only) — $55 Base + $102 Application = $157 Total; Express Lane — Electrical Meter Clearance (residential only) — $55 Base + $102 Application = $157 Total; Express Lane — Electrical Panel Upgrade (residential, up to 400 amps) — $55 Base + $34 Permit + $102 Application = $191 Total. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Goodyear's published plan-review target for an electrical permit is 5–6 business days.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Goodyear requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of Goodyear Development Services — Building Safety Division (623-932-3910).

Apply through City of Goodyear Development Services — Building Safety Division at 1900 N. Civic Square, 2nd Floor, Goodyear, AZ 85395. Phone: 623-932-3910, email: buildingsafety@goodyearaz.gov. Office hours: Development Center, 1900 N. Civic Square, Goodyear, AZ 85395; general Development Services line 623-932-3910; development counter/fee questions 623-932-3004 option 2; project fee estimate requests developmentcounter@goodyearaz.gov. Official information: https://www.goodyearaz.gov/government/departments/engineering-development-services/development-services/building-safety-division/currently-adopted-building-codes.

Goodyear, Arizona has adopted: Arizona has no mandatory statewide building code for general construction — the state legislature does not adopt a single edition binding all municipalities; each Arizona city/town or county adopts and amends its own building code by ordinance (contrast with counties, which are directed by A.R.S. Title 11 to adopt at least the most recent edition or the immediately preceding edition of the ICC codes for unincorporated areas). The City of Goodyear operates its own Development Services / Building Safety Division and administers its own adopted codes and permitting program within city limits — it does not defer to Maricopa County. Source: City of Goodyear Building Safety Division, Currently Adopted Building Codes page.; 2018 International Building Code (IBC) — City of Goodyear, with local amendments, effective November 27, 2019. Source: City of Goodyear Currently Adopted Building Codes page; 2018 International Residential Code for One- and Two-Family Dwellings (IRC) — City of Goodyear, with local amendments, effective November 27, 2019, plus City of Goodyear Residential Design Standards (Table 301.2(1)); 2018 International Mechanical Code (IMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Plumbing Code (IPC) — City of Goodyear, with local amendments, effective November 27, 2019 (Arizona municipalities generally use the IPC rather than the Uniform Plumbing Code); 2018 International Fuel Gas Code (IFGC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Energy Conservation Code (IECC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Existing Building Code (IEBC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Property Maintenance Code (IPMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Fire Code (IFC) — City of Goodyear, with local amendments, effective November 27, 2019; City Code Fire Code amendments codified at Section 5-2-1 (International Fire Code Adopted); 2017 National Electrical Code (NEC) — City of Goodyear (Goodyear retains the 2017 NEC rather than a later edition as of this review); ICC A117.1-2009 Accessible and Usable Buildings and Facilities — American National Standards Institute / International Code Council; 2010 ADA Standards for Accessible Design — U.S. Department of Justice; NFPA 99 (2018 Edition), Standard for Health Care Facilities Code — National Fire Protection Association; Technical Building Codes amendments codified at City Code Section 9-1-1 ('Adoption by reference'). Source: City of Goodyear Currently Adopted Building Codes page (Building Safety Division). Local amendments apply — see the Goodyear overview page for the full list.

Yes. A residential electrical panel change-out that is like-for-like only qualifies for Express Lane review (target under 7 working days), with a flat fee of $55 base plus $102 application ($157 total), per the City of Goodyear Development Services Fee Schedule.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.