EV Charger / Electric Vehicle Charging Station Permit in Goodyear, Arizona

The City of Goodyear's Development Services Fee Schedule (PDF, 10/13/2023) explicitly names EV chargers as an example use case under its standard residential/commercial Electrical Permit fee category: 'Electrical -- 600 Volts or less, and Not Over 400 Amperes (i.e. additional outlet, panel upgrade, energy storage, EV charger, etc.)' -- confirmed by direct text search of the current adopted fee schedule PDF. There is no separate EV-specific permit type; EV charger circuits are billed and processed as standard Electrical Permits, and (unlike Solar Permits) are NOT currently eligible for SolarAPP+ instant review -- SolarAPP+ covers residential solar and storage systems only as of this review, with EV charger automation still in a funded development/expansion phase nationally.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a residential or commercial EV charging circuit at 600V or less and not over 400 amperes falls under the City's standard 'Electrical' fee/permit category, the same category explicitly listing 'EV charger' as an example use alongside additional outlets, panel upgrades, and energy storage
  • Larger-amperage EV charger installations (e.g., commercial DC fast-charging infrastructure) fall under the higher amperage/voltage Electrical fee tiers (401-1,000 amps, or over 600V/1,000 amps) instead
  • A residential panel upgrade needed to support EV charger load, if it is a straightforward like-for-like or up-to-400-amp upgrade, may instead qualify for the City's expedited 'Express Lane' electrical permit process
  • EV charger permits are NOT eligible for SolarAPP+ instant (0-day) review -- that program is limited to residential solar PV and battery storage systems; standard review timelines apply instead
  • Apply through the City of Goodyear Development Services Building Safety Division, in person at the Development Center (1900 N. Civic Square) or online

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical -- 600V or less, Not Over 400 Amperes (residential; explicitly includes EV charger per fee schedule wording)City of Goodyear Development Services Fee Schedule (PDF, 10/13/2023), Residential Fees -- this exact fee category is the one explicitly captioned with 'EV charger' as an example use, confirmed by direct text search of the adopted fee schedule PDF.
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $34 Permit + $102 Application
Electrical -- 600V and over 401-1,000 Amperes (larger residential/commercial EV installations)City of Goodyear Development Services Fee Schedule (PDF, 10/13/2023), Residential Fees
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $82 Permit + $102 Application
Electrical -- Over 600V or Over 1,000 Amperes (commercial DC fast-charging scale)City of Goodyear Development Services Fee Schedule (PDF, 10/13/2023), Residential Fees
$0 plan review (up to $10,000 valuation) or $97/hr min $50 (over $10,000); $55 Base + $115 Permit + $102 Application
Commercial/Non-Residential Electrical -- 600V or less, Not Over 400 AmperesCity of Goodyear Development Services Fee Schedule (PDF, 10/13/2023), Commercial Fees -- same fee category explicitly captioned '(i.e. additional outlet, panel upgrade, energy storage, EV charger, etc.)'
65% of Permit Fee (Plan Review) + Table 1-A Permit Fee + $86 Planning and Zoning + $102 Application
Express Lane -- Electrical Panel Upgrade (residential, up to 400 amps, if EV install needs a panel upgrade)City of Goodyear Development Services Fee Schedule, Express Lane Fees
$55 Base + $34 Permit + $102 Application = $191 Total

Review timeline

Plan reviewGoodyear’s published plan-review target
5–6 business days

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Goodyear?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement verified before concealment

  2. 2

    Final

    New circuit, breaker sizing, and disconnect verified before the charger is energized

See the full Goodyear inspection guide — scheduling & re-inspection fees →

Tips

  • Goodyear's fee schedule explicitly names 'EV charger' as an example use case under its standard Electrical Permit fee line -- this is one of the few jurisdictions in this dataset with EV chargers named directly in the adopted fee schedule text.
  • Unlike Solar Permits, EV charger permits are NOT eligible for SolarAPP+'s instant (same-day) review -- budget the standard 5/6/6 business-day review timeline instead.
  • If your EV charger install only needs a simple like-for-like panel change-out or a panel upgrade up to 400 amps, ask about the City's Express Lane process, which is faster than standard plan review.
  • Fee amounts scale by amperage/voltage tier, not by a flat 'EV charger' rate -- confirm which tier your specific circuit and any associated panel/service work falls into before budgeting.

Frequently asked questions

Goodyear requires an ev charger / electric vehicle charging station permit for: Installation of a residential or commercial EV charging circuit at 600V or less and not over 400 amperes falls under the City's standard 'Electrical' fee/permit category, the same category explicitly listing 'EV charger' as an example use alongside additional outlets, panel upgrades, and energy storage; Larger-amperage EV charger installations (e.g., commercial DC fast-charging infrastructure) fall under the higher amperage/voltage Electrical fee tiers (401-1,000 amps, or over 600V/1,000 amps) instead; A residential panel upgrade needed to support EV charger load, if it is a straightforward like-for-like or up-to-400-amp upgrade, may instead qualify for the City's expedited 'Express Lane' electrical permit process; EV charger permits are NOT eligible for SolarAPP+ instant (0-day) review -- that program is limited to residential solar PV and battery storage systems; standard review timelines apply instead; Apply through the City of Goodyear Development Services Building Safety Division, in person at the Development Center (1900 N. Civic Square) or online. If your project isn't listed, confirm with City of Goodyear Development Services — Building Safety Division at 623-932-3910 before starting work.

There is no separate EV-charger-only permit type, but the City's Development Services Fee Schedule explicitly lists 'EV charger' as an example use case under its standard Electrical Permit fee category (600V or less, not over 400 amperes): $55 Base + $34 Permit + $102 Application for a typical residential installation, plus plan review fees for projects valued over $10,000.

Goodyear's published plan-review target for an ev charger / electric vehicle charging station permit is 5–6 business days.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Goodyear requires 2 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Rough Electrical, Final. Schedule each through City of Goodyear Development Services — Building Safety Division (623-932-3910).

Apply through City of Goodyear Development Services — Building Safety Division at 1900 N. Civic Square, 2nd Floor, Goodyear, AZ 85395. Phone: 623-932-3910, email: buildingsafety@goodyearaz.gov. Office hours: Development Center, 1900 N. Civic Square, Goodyear, AZ 85395; general Development Services line 623-932-3910; development counter/fee questions 623-932-3004 option 2; project fee estimate requests developmentcounter@goodyearaz.gov. Official information: https://www.goodyearaz.gov/government/departments/engineering-development-services/development-services/building-safety-division/currently-adopted-building-codes.

Goodyear, Arizona has adopted: Arizona has no mandatory statewide building code for general construction — the state legislature does not adopt a single edition binding all municipalities; each Arizona city/town or county adopts and amends its own building code by ordinance (contrast with counties, which are directed by A.R.S. Title 11 to adopt at least the most recent edition or the immediately preceding edition of the ICC codes for unincorporated areas). The City of Goodyear operates its own Development Services / Building Safety Division and administers its own adopted codes and permitting program within city limits — it does not defer to Maricopa County. Source: City of Goodyear Building Safety Division, Currently Adopted Building Codes page.; 2018 International Building Code (IBC) — City of Goodyear, with local amendments, effective November 27, 2019. Source: City of Goodyear Currently Adopted Building Codes page; 2018 International Residential Code for One- and Two-Family Dwellings (IRC) — City of Goodyear, with local amendments, effective November 27, 2019, plus City of Goodyear Residential Design Standards (Table 301.2(1)); 2018 International Mechanical Code (IMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Plumbing Code (IPC) — City of Goodyear, with local amendments, effective November 27, 2019 (Arizona municipalities generally use the IPC rather than the Uniform Plumbing Code); 2018 International Fuel Gas Code (IFGC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Energy Conservation Code (IECC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Existing Building Code (IEBC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Property Maintenance Code (IPMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Fire Code (IFC) — City of Goodyear, with local amendments, effective November 27, 2019; City Code Fire Code amendments codified at Section 5-2-1 (International Fire Code Adopted); 2017 National Electrical Code (NEC) — City of Goodyear (Goodyear retains the 2017 NEC rather than a later edition as of this review); ICC A117.1-2009 Accessible and Usable Buildings and Facilities — American National Standards Institute / International Code Council; 2010 ADA Standards for Accessible Design — U.S. Department of Justice; NFPA 99 (2018 Edition), Standard for Health Care Facilities Code — National Fire Protection Association; Technical Building Codes amendments codified at City Code Section 9-1-1 ('Adoption by reference'). Source: City of Goodyear Currently Adopted Building Codes page (Building Safety Division). Local amendments apply — see the Goodyear overview page for the full list.

No. SolarAPP+ instant (0-day) review in Goodyear applies to residential solar PV and battery storage systems only. EV charger permits follow the standard review timeline (5/6/6 business days for prescreen/1st review/resubmittal per the City's Review Times page).

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.