Sign Permit in Goodyear, Arizona
Required for most permanent commercial and non-residential signage in Goodyear, governed by City of Goodyear Zoning Ordinance, Article 7 (Sign Regulations). Certain properties -- commercial/industrial/non-residential uses in a residential zoning district, mixed-use developments with three or more buildings or businesses, and all Planned Area Developments (PADs) -- must obtain an approved Comprehensive Sign Package before individual sign permits can be issued; temporary signage instead uses a separate time/place/manner permit from the Zoning Administrator. The process and legal basis are well documented, but specific dollar fee figures for sign permits are not confirmed and are left unconfirmed rather than assumed.
Reviewed 2026-08-04 · Source
When you need this permit
- Signs are governed by City of Goodyear Zoning Ordinance, Article 7 (Sign Regulations); Art. 7-6 (General Sign Regulations) requires all signs and sign structures to be structurally designed, constructed, erected, and maintained in accordance with all applicable City of Goodyear codes and ordinances, including the currently adopted Building Code
- Any commercial, industrial, or non-residential use located in a residential zoning district, any mixed-use development containing three or more buildings or businesses, and all Planned Area Developments (PADs) must prepare and submit a Comprehensive Sign Package for review and approval before individual sign permits may be issued
- A Comprehensive Sign Package that complies with all standard requirements may be approved administratively by the Zoning Administrator following review by the Development Review Committee (DRC); a package proposing modifications to the standards instead requires review and approval by the Planning and Zoning Commission and City Council -- a materially longer process
- Temporary signage (banners, event signs, etc.) requires its own permit approving the time, place, and manner of display, obtained from the Zoning Administrator on forms provided by the Development Services Department, per Zoning Ordinance Art. 7-9 (Temporary Signs)
- Free-standing signs must be located a minimum of 5 feet from a property line; freeway pylon signs a minimum of 15 feet; no sign may be located within, on, or projecting over an easement, public street right-of-way, or City property, per Art. 7-6/Art. 7-8 (Permitted Signage by Zoning District)
- The Comprehensive Sign Package application is processed per the procedures and timeframes described in the City of Goodyear Administrative Process Manual
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Development Services Fee Schedule PDF cited as sourceUrl/sources for every other permit type in this record governs Sign fees too, using the City's general Building Safety fee framework (Table… Show full citationHide
The Development Services Fee Schedule PDF cited as sourceUrl/sources for every other permit type in this record governs Sign fees too, using the City's general Building Safety fee framework (Table 1-A valuation-based permit fee, plan review percentage, and a flat application fee) documented elsewhere in this record -- but the Sign-specific line item(s) and dollar amounts are not confirmed. Do not assume the $102 application-fee figure used elsewhere in this record applies here without verifying against the current fee schedule.Review timeline
Inspection process
- 1
Rough-In (Electrical, if illuminated)
Wiring and connections verified before the sign face/cabinet is closed, for illuminated signs only
- 2
Final
Sign construction, location, and height verified against the approved sign permit and/or Comprehensive Sign Package, plus electrical connections where applicable
See the full Goodyear inspection guide — scheduling & re-inspection fees →
Tips
- Whether you need an approved Comprehensive Sign Package before an individual sign permit depends on the property: commercial/industrial/non-residential uses in a residential zoning district, mixed-use developments with 3+ buildings or businesses, and all Planned Area Developments (PADs) need one; most standalone commercial parcels outside those categories may not.
- A Comprehensive Sign Package that doesn't propose any modification to the standard sign regulations can be approved administratively by the Zoning Administrator after Development Review Committee review -- packages proposing modifications require Planning and Zoning Commission and City Council approval, a materially longer public-hearing process.
- Temporary signage (banners, event signs, etc.) uses a separate, lighter-weight time/place/manner permit from the Zoning Administrator rather than the standard sign permit process.
- This entry's specific fee amounts are not confirmed -- contact Development Services (623-932-3004 / developmentcounter@goodyearaz.gov) or request a Project Fee Estimate before budgeting a sign project.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-04.
Fee schedules
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Goodyear's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Goodyear yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Goodyear lands. Privacy.
Other permits in Goodyear
Sign Permit in other cities
Compare sign permit fees across Arizona →