Unlike some Arizona jurisdictions in this corpus that contract fire code enforcement to an independent regional fire district (e.g., Apache Junction's Superstition Fire & Medical District), the City of Goodyear operates its own City of Goodyear Fire Department and self-administers fire code enforcement, plan review, and permitting for fire sprinkler and fire alarm systems through its Fire Prevention Division / Fire Administration -- there is no outside fire district in the loop. Fire plan review is billed as the already-documented 'Fire Plan Review Fee' (35% of the calculated permit fee) component of the City's general Building/Fire Permit fee structure, alongside the 65%-of-permit-fee Building Plan Review Fee. This review could not confirm whether the City additionally publishes a separate flat per-riser/per-system sprinkler or alarm fee line (of the kind some fire-district-served jurisdictions in this corpus use) -- that was checked, not assumed, and is left unconfirmed rather than invented.

Reviewed 2026-08-04 · Source

When you need this permit

  • Fire code enforcement, plan review, and permitting for fire sprinkler and fire alarm systems in Goodyear are performed by the City of Goodyear Fire Department itself (Fire Prevention Division, 14455 W. Van Buren St., Suite E-102; Fire Administration 623-932-2300) -- Goodyear operates its own fire department and is not served by an outside regional fire district for this purpose, unlike some other Arizona jurisdictions in this corpus
  • Governed by the 2018 International Fire Code (IFC) as adopted and locally amended by the City of Goodyear (City Code Section 5-2-1, 'International fire code adopted'); the amendment to IFC Section 105.1.1 ('Permits required') adds that permits are non-transferable and that any change in occupancy, operation, tenancy, or ownership requires a new permit, and the amendment to IFC Section 105.2 ('Application') requires a written application, supporting documentation, and applicable fees submitted per the City of Goodyear Administrative Process Manual
  • Fire suppression (sprinkler) systems and fire alarm systems are explicitly named among the construction and design provisions covered by these City-amended IFC Section 105 permit requirements
  • All plans, including fire protection plans, are submitted to the Development Services Department (1900 N. Civic Square, Goodyear, AZ 85395); a Fire online application is also available, or the application form can be requested by contacting Fire Administration directly (623-932-2300 or in person at 14455 W. Van Buren St., Ste E102)
  • Fire fees are established per International Building Code Section 109 and the City of Goodyear fee schedule as adopted by City Council (City Code Article 5-4, 'Fire Prevention Fees'; City Code Section 9-1-1, 'Adoption by reference'); the City's Building Safety Fees framework (documented elsewhere in this file) explicitly splits Building/Fire Permit fees into a Building Plan Review Fee (65% of the calculated permit fee) and a Fire Plan Review Fee (35% of the calculated permit fee), which appears to be the mechanism by which fire-system plan review -- including sprinkler and alarm -- is billed, rather than a separate stand-alone flat-fee list

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Plan Review Fee (Building/Fire Permit fee component)City of Goodyear Development Services Fee Schedule, Building Safety Fees overview -- this figure is already documented and verified elsewhere in this file (see localAmendments and the commercial-tenant-improvement-permit entry); applies to fire-code-regulated systems including sprinkler and alarm plan review as part of the overall Building/Fire Permit fee.
35% of the calculated permit fee (minimum charge per application)
Fire Sprinkler System / Fire Alarm System -- separate dedicated flat fee line (if any)goodyearaz.gov (including the Fire Department's own 'Fire Permit Fee Schedule' page) returned HTTP 403 to automated fetches (Akamai bot protection), the Wayback Machine was unreachable during this session, and Firecrawl scraping was unavailable (insufficient credits). It could not be confirmed whether Goodyear additionally publishes a separate flat per-riser or per-system sprinkler/alarm fee line beyond the 35% Fire Plan Review Fee component above; no such figure is asserted here.
Not confirmed in this review

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler and Fire Alarm System Permit permit actually take in Goodyear?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Underground

    Sprinkler piping, alarm wiring, and device placement verified before concealment, per the City of Goodyear Fire Department Fire Prevention Division

  2. 2

    Final Acceptance Test

    Hydrostatic/flow acceptance test (fire sprinkler systems) or full functional test (fire alarm systems) witnessed by the City of Goodyear Fire Department before the system is placed in service

See the full Goodyear inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike some Arizona municipalities in this corpus (e.g., Apache Junction, served by the independent Superstition Fire & Medical District), Goodyear operates its own City Fire Department and self-administers fire code enforcement and fire-system permitting -- there is no outside fire district to route sprinkler/alarm plans through.
  • Fire plan review is billed as a 35%-of-permit-fee 'Fire Plan Review Fee' component alongside the 65%-of-permit-fee Building Plan Review Fee, per the City's Building Safety Fees framework -- budget both components together rather than expecting a separate flat sprinkler/alarm fee, though this review could not rule out an additional dedicated fee line.
  • Contact Fire Administration directly (623-932-2300, 14455 W. Van Buren St., Suite E-102) for the fire-specific application in addition to submitting plans through Development Services.
  • A change in occupancy, operation, tenancy, or ownership requires a new fire permit under Goodyear's local amendment to IFC Section 105.1.1 -- fire permits are explicitly non-transferable here.

Frequently asked questions

Goodyear requires a fire sprinkler and fire alarm system permit for: Fire code enforcement, plan review, and permitting for fire sprinkler and fire alarm systems in Goodyear are performed by the City of Goodyear Fire Department itself (Fire Prevention Division, 14455 W. Van Buren St., Suite E-102; Fire Administration 623-932-2300) -- Goodyear operates its own fire department and is not served by an outside regional fire district for this purpose, unlike some other Arizona jurisdictions in this corpus; Governed by the 2018 International Fire Code (IFC) as adopted and locally amended by the City of Goodyear (City Code Section 5-2-1, 'International fire code adopted'); the amendment to IFC Section 105.1.1 ('Permits required') adds that permits are non-transferable and that any change in occupancy, operation, tenancy, or ownership requires a new permit, and the amendment to IFC Section 105.2 ('Application') requires a written application, supporting documentation, and applicable fees submitted per the City of Goodyear Administrative Process Manual; Fire suppression (sprinkler) systems and fire alarm systems are explicitly named among the construction and design provisions covered by these City-amended IFC Section 105 permit requirements; All plans, including fire protection plans, are submitted to the Development Services Department (1900 N. Civic Square, Goodyear, AZ 85395); a Fire online application is also available, or the application form can be requested by contacting Fire Administration directly (623-932-2300 or in person at 14455 W. Van Buren St., Ste E102); Fire fees are established per International Building Code Section 109 and the City of Goodyear fee schedule as adopted by City Council (City Code Article 5-4, 'Fire Prevention Fees'; City Code Section 9-1-1, 'Adoption by reference'); the City's Building Safety Fees framework (documented elsewhere in this file) explicitly splits Building/Fire Permit fees into a Building Plan Review Fee (65% of the calculated permit fee) and a Fire Plan Review Fee (35% of the calculated permit fee), which appears to be the mechanism by which fire-system plan review -- including sprinkler and alarm -- is billed, rather than a separate stand-alone flat-fee list. If your project isn't listed, confirm with City of Goodyear Development Services — Building Safety Division at 623-932-3910 before starting work.

Fire plan review is billed as a 35%-of-permit-fee 'Fire Plan Review Fee' component of the City's general Building/Fire Permit fee structure (alongside a 65%-of-permit-fee Building Plan Review Fee), per the Development Services Fee Schedule. This review could not confirm whether the City also publishes a separate flat per-system or per-riser sprinkler/alarm fee line beyond that percentage-based component -- that figure is left unconfirmed rather than invented.

Goodyear does not publish a plan-review timeline for this permit. Contact City of Goodyear Development Services — Building Safety Division at 623-932-3910 for current turnaround.

You'll need: Fire Sprinkler / Fire Alarm Permit Application; Fire Protection System Plans and Specifications. Depending on your project, Goodyear may also ask for: Underlying City of Goodyear Building Permit Application. See the required-documents checklist on this page for details on each.

Goodyear requires 2 inspection(s) for a fire sprinkler and fire alarm system permit, in order: Rough-In / Underground, Final Acceptance Test. Schedule each through City of Goodyear Development Services — Building Safety Division (623-932-3910).

Apply through City of Goodyear Development Services — Building Safety Division at 1900 N. Civic Square, 2nd Floor, Goodyear, AZ 85395. Phone: 623-932-3910, email: buildingsafety@goodyearaz.gov. Office hours: Development Center, 1900 N. Civic Square, Goodyear, AZ 85395; general Development Services line 623-932-3910; development counter/fee questions 623-932-3004 option 2; project fee estimate requests developmentcounter@goodyearaz.gov. Official information: https://www.goodyearaz.gov/government/departments/engineering-development-services/development-services/building-safety-division/currently-adopted-building-codes.

Goodyear, Arizona has adopted: Arizona has no mandatory statewide building code for general construction — the state legislature does not adopt a single edition binding all municipalities; each Arizona city/town or county adopts and amends its own building code by ordinance (contrast with counties, which are directed by A.R.S. Title 11 to adopt at least the most recent edition or the immediately preceding edition of the ICC codes for unincorporated areas). The City of Goodyear operates its own Development Services / Building Safety Division and administers its own adopted codes and permitting program within city limits — it does not defer to Maricopa County. Source: City of Goodyear Building Safety Division, Currently Adopted Building Codes page.; 2018 International Building Code (IBC) — City of Goodyear, with local amendments, effective November 27, 2019. Source: City of Goodyear Currently Adopted Building Codes page; 2018 International Residential Code for One- and Two-Family Dwellings (IRC) — City of Goodyear, with local amendments, effective November 27, 2019, plus City of Goodyear Residential Design Standards (Table 301.2(1)); 2018 International Mechanical Code (IMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Plumbing Code (IPC) — City of Goodyear, with local amendments, effective November 27, 2019 (Arizona municipalities generally use the IPC rather than the Uniform Plumbing Code); 2018 International Fuel Gas Code (IFGC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Energy Conservation Code (IECC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Existing Building Code (IEBC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Property Maintenance Code (IPMC) — City of Goodyear, with local amendments, effective November 27, 2019; 2018 International Fire Code (IFC) — City of Goodyear, with local amendments, effective November 27, 2019; City Code Fire Code amendments codified at Section 5-2-1 (International Fire Code Adopted); 2017 National Electrical Code (NEC) — City of Goodyear (Goodyear retains the 2017 NEC rather than a later edition as of this review); ICC A117.1-2009 Accessible and Usable Buildings and Facilities — American National Standards Institute / International Code Council; 2010 ADA Standards for Accessible Design — U.S. Department of Justice; NFPA 99 (2018 Edition), Standard for Health Care Facilities Code — National Fire Protection Association; Technical Building Codes amendments codified at City Code Section 9-1-1 ('Adoption by reference'). Source: City of Goodyear Currently Adopted Building Codes page (Building Safety Division). Local amendments apply — see the Goodyear overview page for the full list.

Goodyear operates its own City of Goodyear Fire Department and self-administers fire code enforcement and fire-system permitting through its Fire Prevention Division -- unlike some other Arizona jurisdictions in this corpus that are served by an independent regional fire district (e.g., Apache Junction's Superstition Fire & Medical District), there is no outside district involved here.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Goodyear building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.