EV Charger / EVSE Permit — Unincorporated Pinal County, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.pinal.gov/DocumentCenter/View/440/011---Mechanical-Plumbing-and-Electrical-Project-Permits-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Pinal County, Arizona
Pinal County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment in unincorporated Pinal County requires a Mechanical/Plumbing/Electrical (MPE) Electrical Permit under the 2017 NEC with county amendments, billed under the Article 4 unit-fee schedule (Fee Schedule No. 071013-BPFS): a flat issuance fee plus itemized per-service and per-fixture fees. A typical Level 2 EV charger circuit is billed as a new circuit/service item under this same schedule.
Verified 2026-07-20 · Source
When you need this permit
- Mechanical/Plumbing/Electrical (MPE) Application required for EV charger/EVSE circuit installation in unincorporated Pinal County
- Site plan noting placement of any new panel/subpanel (location on structure) required with application
- Utility companies require their own separate inspection/clearance of service equipment in addition to county clearance
- Documentation should show location of electric meter, electric panel, and new charging station, plus a one-line diagram with conductor/conduit sizes and overcurrent protection calculations, consistent with the county's general electrical permit submittal requirements
- No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Service Inspection
EVSE circuit and any service/panel work inspected before wall cover or energizing; call the automated inspection line (520-866-6299) before midnight the day before
- 2
Final
All EVSE electrical work complete and operational per 2017 NEC
See the full Unincorporated Pinal County inspection guide — scheduling & re-inspection fees →
Tips
- Pinal County has no distinct EV charger/EVSE fee — installation is billed under the same Article 4 unit-fee schedule as any other electrical permit: a $42 issuance fee plus itemized per-service/per-fixture fees.
- County clearance does not guarantee the utility company will energize your service — utilities have their own separate equipment inspection requirements, same as for any other electrical service work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Pinal County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Pinal County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →