Skip to main content
PermitBase

Residential Accessory Structure / Remodel / Addition Permit in Chino Valley, Arizona

Required for accessory structures, remodels, and additions to existing one- and two-family dwellings in the Town of Chino Valley, reviewed against the currently adopted 2024 IRC/IBC and Town of Chino Valley amendments.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for residential accessory structures, remodels, and additions; not required for decks 30 inches or less above grade with under 120 sq ft of surface area, or retaining walls 32 inches or less in height (per Town's amended IBC/IRC § 105.2/R105.2)
  • Complete detailed plan set required: foundation, floor, elevations, building sections, roof, braced wall lines, structural calculations if applicable, electrical, plumbing, mechanical if applicable
  • Site plan showing all existing/proposed structures, setbacks, easements, lot dimensions, contours, utility locations, well, septic tank, and leach lines
  • Existing septic plot plan required if a septic system already exists (obtained from Yavapai County Department of Environmental Services)
  • Truss calculations with layout sheet; Manuals S, J, and D required
  • Metal buildings and/or single-story structures with bearing walls exceeding 10 feet in height (including RV garages) require a separate braced-wall-line sheet with calculations sealed by an Arizona-licensed engineer
  • Contractor State Bond Exemption required for job values over $50,000; owner/builders must complete an 'Exempt from Licensing' form Owner-builderContractor
  • Submittal via the CitizenServe online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Remodel or Addition — Valuation BasedTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation set at $100.00 per square foot, fed into the bracketed Building Valuation Table fee schedule (same brackets as new construction: $91.14 base up to $8,515.13 + $4.78 per additional $1,000 above $1,000,000)
Conversion — Garage to HabitableTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $60.00 per square foot
Conversion — Patio to HabitableTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $65.00 per square foot
Storage Buildings/Sheds Larger Than 200 sq ft — Metal / WoodTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $7.00 / $9.00 per square foot respectively
Carports — Wood / MetalTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $15.00 / $12.00 per square foot respectively
Covered Decks — Wood / Metal; Decks (uncovered)Town of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $20.00 / $17.00 per square foot (covered); $12.00 per square foot (uncovered decks)
Patio Covers, Awnings, Porch, Patio, Canopies — Wood / MetalTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $15.00 / $12.00 per square foot respectively
Garages — Masonry, Metal, WoodTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
Valuation $20.00 per square foot
Foundations OnlyTown of Chino Valley Consolidated Fee Schedule, effective 03-01-2026
25% of planned structure's full valuation
Plan Review Fee (all valuation-based permit types)Town of Chino Valley Consolidated Fee Schedule, effective 03-01-2026, 'Plan Review' section
65% of the calculated Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Residential Accessory Structure / Remodel / Addition Permit permit actually take in Chino Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/accessory structures

  2. 2

    Framing

    Structural connections to the existing structure

  3. 3

    Final

    Completed work verified against approved plans

See the full Chino Valley inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the Town of Chino Valley does not publish a specific plan-review turnaround time for accessory structure/remodel/addition permits anywhere on its public website, checklists, or fee schedule. Call Development Services at 928-636-3480 or email permitting@chinoaz.net for a current estimate.
  • One-story detached accessory structures are NOT blanket-exempt from a permit in Chino Valley the way some other Arizona towns exempt small sheds — the Town's only building-permit exemptions under its § 105.2/R105.2 amendment are for very small decks (≤120 sq ft, ≤30 inches above grade) and short retaining walls (≤32 inches); confirm with Development Services before assuming any structure is exempt.
  • Fees for this permit category are entirely valuation-per-square-foot based (using the same bracketed Building Valuation Table as new construction), rather than flat rates, except for the specific flat-fee items (demolition, fireplaces, pools, solar) listed separately.

Frequently asked questions

Yes, a building permit is required for accessory structures, remodels, and additions, reviewed against the 2024 IRC/IBC as adopted by the Town of Chino Valley. Fees are valuation-based ($100/sq ft valuation rate for remodels/additions) plus a 65% plan review fee.

In Chino Valley, the published Residential Remodel or Addition — Valuation Based is: Valuation set at $100.00 per square foot, fed into the bracketed Building Valuation Table fee schedule (same brackets as new construction: $91.14 base up to $8,515.13 + $4.78 per additional $1,000 above $1,000,000). Additional published fees: Conversion — Garage to Habitable — Valuation $60.00 per square foot; Conversion — Patio to Habitable — Valuation $65.00 per square foot; Storage Buildings/Sheds Larger Than 200 sq ft — Metal / Wood — Valuation $7.00 / $9.00 per square foot respectively; Carports — Wood / Metal — Valuation $15.00 / $12.00 per square foot respectively; Covered Decks — Wood / Metal; Decks (uncovered) — Valuation $20.00 / $17.00 per square foot (covered); $12.00 per square foot (uncovered decks); Patio Covers, Awnings, Porch, Patio, Canopies — Wood / Metal — Valuation $15.00 / $12.00 per square foot respectively; Garages — Masonry, Metal, Wood — Valuation $20.00 per square foot; Foundations Only — 25% of planned structure's full valuation; Plan Review Fee (all valuation-based permit types) — 65% of the calculated Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Chino Valley does not publish a plan-review timeline for this permit. Contact Town of Chino Valley Development Services Department — Building Division at 928-636-3480 for current turnaround.

You'll need: Building Permit Application (rev. 01/01/2026); Residential Accessory Structure, Remodel & Addition Building Permit Application Checklist (rev. 01/01/2026); Site Plan. See the required-documents checklist on this page for details on each.

Chino Valley requires 3 inspection(s) for a residential accessory structure / remodel / addition permit, in order: Foundation/Footing, Framing, Final. Schedule each through Town of Chino Valley Development Services Department — Building Division (928-636-3480).

Apply through Town of Chino Valley Development Services Department — Building Division at 1982 Voss Drive #203, Chino Valley, AZ 86323. Phone: 928-636-3480, email: building@chinoaz.net (department main contact per the Town's Building Division page); permitting@chinoaz.net (listed on all Development Services checklists and forms, rev. 01/01/2026, for permit submittal questions). Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays and holidays). Building inspectors are available in the office 7-8 a.m. and 4-5 p.m., Monday-Thursday; applicants may call 928-636-3480 between 7-8 a.m. the morning of a scheduled inspection to request an AM/PM timing preference. The Town uses the CitizenServe online portal (citizenserve.com/chinovalleyaz) for permit applications, status tracking, and payments. Inspections may be scheduled via the CitizenServe portal, by texting 1-888-855-8919 with permit number/inspection code/date, or by calling 1-888-855-8919 and following the automated IVR prompts; requests made before midnight are scheduled for the next business day.. Official information: https://www.chinovalleyaz.gov/200/Building.

Chino Valley, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Chino Valley's Development Services Department independently adopts and administers its own construction codes under Chapter 150 (Building Regulations; Construction) of the Chino Valley Town Code; it does not defer permitting to Yavapai County. Source: Chino Valley Town Code § 150.001, current version hosted on American Legal Publishing (codelibrary.amlegal.com/codes/chinovalley).; 2024 International Building Code (IBC), including Appendices C, E, G, I, and J, adopted by reference as the Town's building code (Chino Valley Town Code § 150.001(A)), with Town of Chino Valley amendments, currently in effect per the live code as last amended by Ordinance No. 2025-959 (passed 11-18-2025). Source: Chino Valley Town Code § 150.001(A), amlegal.com (accessed 2026-07-06).; 2024 International Residential Code (IRC) for one- and two-family dwellings, including Appendices BB, BD, BF, BH, BO, CA, CB, CD, CE, and CF, adopted by reference (§ 150.001(B)), with Town of Chino Valley amendments. Source: Chino Valley Town Code § 150.001(B).; 2024 International Fuel Gas Code (IFGC), including Appendices B and C, adopted by reference (§ 150.001(C)), with Town of Chino Valley amendments. Source: Chino Valley Town Code § 150.001(C).; 2024 International Mechanical Code (IMC), including Appendix A, adopted by reference (§ 150.001(D)), with Town of Chino Valley amendments. Source: Chino Valley Town Code § 150.001(D).; 2024 International Plumbing Code (IPC), including Appendices D and E, adopted by reference (§ 150.001(E)), with Town of Chino Valley amendments. Source: Chino Valley Town Code § 150.001(E).; 2012 International Energy Conservation Code (IECC) — NOTE: unlike the other ICC codes, the Town's energy code has NOT been advanced to a newer edition; it remains the 2012 IECC (Chino Valley Town Code § 150.001(F)), with Town amendments including pre-approved alternative compliance paths (LEED, Energy Star, DOE Res-Check/Comm-Check) and administrative sections cross-referenced to the 2024 IBC. Source: Chino Valley Town Code § 150.001(F); Town of Chino Valley Building Criteria handout (rev. 01/01/2026), which independently confirms '2012 International Energy Conservation Code' alongside the 2024-edition ICC set.; 2024 International Existing Building Code (IEBC), adopted by reference (§ 150.001(G)), with Town of Chino Valley amendments, for regulating repair, alteration, change of occupancy, addition to, and relocation of existing buildings. Source: Chino Valley Town Code § 150.001(G).; 2023 National Electrical Code (NFPA 70), as published by the National Fire Protection Association, adopted by reference as the Town's standalone electrical code (Chino Valley Town Code § 150.004), with Town of Chino Valley amendments (electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag). Source: Chino Valley Town Code § 150.004.; Fire protection systems are NOT independently regulated under the Town's IBC Chapter 9 — that chapter is deleted and replaced with a cross-reference requiring compliance with the Central Arizona Fire and Medical Authority (CAFMA) and the International Fire Code as adopted and amended by CAFMA from time to time; the Chino Valley Building Official assists CAFMA with inspection, testing, and oversight of fire protection systems. Source: Chino Valley Town Code § 150.001(A) IBC Section 901 amendment.; Accessibility requirements follow the 2010 ADA Standards for Accessible Design (U.S. Department of Justice) together with 2024 IBC Appendix E, per the Town's amendment to IBC Section 1102.1. Source: Chino Valley Town Code § 150.001(A).; Manufactured homes and factory-built buildings: construction/installation standards are regulated by the State of Arizona (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing); the Town issues a separate MFH Building Permit for placement, foundation, driveway, and site requirements, including a minimum 12-foot width, 400 sq ft of livable space, and a construction date after June 15, 1976 for used units. Source: Town of Chino Valley MFH Building Permit Application Checklist (rev. 01/01/2026).. Local amendments apply — see the Chino Valley overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Chino Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.