Prescott building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Prescott, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
201 N Montezuma Street, Prescott, AZ 86301
Phone
928-777-1371
Office hours
Monday - Friday, 8 a.m. - 5 p.m. Applications are submitted online through the PrescottPermits.com portal (all permit types, including plan-reviewed and same-day Fast Track permits). On-site building inspections are performed Monday through Friday, 8 a.m. to 3 p.m., except City holidays; inspections can be scheduled online as early as the next business day (up to 5 business days out) if requested before midnight. Note: the City's Building Permit application checklists (rev. 2023-2024) list an older office address of 201 S Cortez St, Prescott, AZ 86303 — the current Permit Center pages (2025-2026 vintage) consistently list 201 N Montezuma Street, Prescott, AZ 86301, which is used here as the verified current address.

Published scheduling rules

  • Inspections can be scheduled online as early as the next business day if requested before midnight; inspections run Monday-Friday, 8 a.m.-3 p.m., not on weekends or City holidays. (Residential Building Permit (New Single-Family Residence / Duplex))
  • Day-of inspection cancellations for fire permits do not go through the portal - call the Fire Permit Technician at 928-777-1405 ext. 4967 between 8:00 a.m. and 8:30 a.m. Cancellations made by 11:59 p.m. the day before can be done online. After 4 failed inspections a $103.00 re-inspection fee applies and must be paid before a new inspection can be scheduled. (Fire Sprinkler and Fire Alarm System Permit)

Inspection sequence

Applies to: Commercial Building Permit (New Commercial & Multi-Family Construction)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IBC and City of Prescott Commercial Design Criteria

  3. 3

    Rough Electrical/Mechanical/Plumbing

    Before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; requires C of O walk-through, and Fire Department sign-off where fire sprinklers/alarms were installed, before occupancy

Applies to: Residential Building Permit (New Single-Family Residence / Duplex)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IRC and City of Prescott design criteria

  3. 3

    Rough Electrical/Mechanical/Plumbing

    Before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; C of O walk-through required before occupancy

Applies to: Accessory Structures Permit (Sheds, Carports)

  1. 1

    Foundation/Footing

    Required if the structure has a permanent foundation

  2. 2

    Framing

    Structural framing and connections

  3. 3

    Final

    Completed structure verified against approved plans

Applies to: Plumbing Only Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Addition / Remodel Permit (Addition, Remodel, Casita, Guesthouse, Decks, Patio Cover, Pergola)

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/decks with footings

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Rough-In (Structural / MEP)

    Structural connections and mechanical/electrical/plumbing rough-in verified before concealment, per 2024 IBC and City of Prescott amendments

  2. 2

    Final / Certificate of Occupancy

    All work complete per approved plans; C of O walk-through required if the scope changes occupancy classification or use

Applies to: Electrical Only Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2023 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    EVSE circuit wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Charger installed, panel labeled, protections verified per 2023 NEC

Applies to: Fences and Walls Permit

  1. 1

    Footing

    Required for retaining walls before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Rough Inspection

    Required by the Prescott Fire Department for all fire protection system work, before concealment. For projects with underground fire line scope, the fire sprinkler rough inspection will not be completed until the underground has been approved and an Underground Certificate of Completion has been received.

  2. 2

    Final Inspection

    Required by the Prescott Fire Department for all fire protection system work. Approved plans and the permit must be on site and available to the inspector on the day of inspection; results are emailed to all listed permit contacts the day of inspection and posted to the PrescottPermits.com portal.

Applies to: Mechanical Only Permit (HVAC)

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Photovoltaic Solar System Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Applies to: Sign Permit

  1. 1

    Sign Footing Inspection

    Sign footing/foundation verified for monument and other freestanding signs; carried as the 'Building Sign Footing Inspection' line ($67.00) in the City's Citywide Fee Schedule

  2. 2

    Sign New Electrical Inspection

    Electrical inspection for illuminated signs; carried as the 'Building Sign New Electrical Inspection' line ($67.00) in the City's Citywide Fee Schedule. Only these two sign inspections are named in the City's published fee schedule - no further sign inspection sequence is published, so none is asserted here.

Re-inspection fees

Fire Sprinkler and Fire Alarm System Permit
Other Fire Code Fees - Re-inspection fee, after four · FY2027 Citywide Fee Schedule, page 5 of 8, 'Fire' section continuation (FY26 $101.00 -> FY27 $103.00). Show full citationOther Fire Code Fees - Re-inspection fee, after four · FY2027 Citywide Fee Schedule, page 5 of 8, 'Fire' section continuation (FY26 $101.00 -> FY27 $103.00). The City's Fire Suppression, Alarm & Hood Permits page states that after 4 failed inspections a re-inspection fee is applied and must be paid before a new inspection can be scheduled.
$103.00 (one hour minimum)

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Prescott building permits