Prescott building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Prescott, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
201 N Montezuma Street, Prescott, AZ 86301
Phone
928-777-1371
Office hours
Monday - Friday, 8 a.m. - 5 p.m. Applications are submitted online through the PrescottPermits.com portal (all permit types, including plan-reviewed and same-day Fast Track permits). On-site building inspections are performed Monday through Friday, 8 a.m. to 3 p.m., except City holidays; inspections can be scheduled online as early as the next business day (up to 5 business days out) if requested before midnight. Note: the City's Building Permit application checklists (rev. 2023-2024) list an older office address of 201 S Cortez St, Prescott, AZ 86303 — the current Permit Center pages (2025-2026 vintage) consistently list 201 N Montezuma Street, Prescott, AZ 86301, which is used here as the verified current address.

Published scheduling rules

  • Inspections can be scheduled online as early as the next business day if requested before midnight; inspections run Monday-Friday, 8 a.m.-3 p.m., not on weekends or City holidays. (Residential Building Permit (New Single-Family Residence / Duplex))

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Residence / Duplex)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IRC and City of Prescott design criteria

  3. 3

    Rough Electrical/Mechanical/Plumbing

    Before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; C of O walk-through required before occupancy

Applies to: Accessory Structures Permit (Sheds, Carports)

  1. 1

    Foundation/Footing

    Required if the structure has a permanent foundation

  2. 2

    Framing

    Structural framing and connections

  3. 3

    Final

    Completed structure verified against approved plans

Applies to: Plumbing Only Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Addition / Remodel Permit (Addition, Remodel, Casita, Guesthouse, Decks, Patio Cover, Pergola)

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/decks with footings

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Electrical Only Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2023 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    EVSE circuit wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Charger installed, panel labeled, protections verified per 2023 NEC

Applies to: Fences and Walls Permit

  1. 1

    Footing

    Required for retaining walls before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

Applies to: Mechanical Only Permit (HVAC)

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Photovoltaic Solar System Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Final inspection only: Demolition Permit, Re-Roof Only Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Prescott building permits

Get alerts for Prescott

We'll email you when Prescott's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.