Skip to main content
PermitBase

Residential Building Permit (New Single-Family Residence / Duplex) in Prescott, Arizona

Required for new single-family residence and duplex construction in the City of Prescott. Reviewed against the 2024 IRC and City of Prescott amendments, plus the City's residential design criteria (105 mph wind, Seismic Category C, 18-inch frost depth, 20°F winter design temperature). Applications are submitted through the PrescottPermits.com online portal.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family residence and duplex construction within Prescott city limits
  • Plans must comply with the 2024 IRC and City of Prescott amendments, and the City's Residential Design Criteria (105 mph wind Exposure C; Seismic Design Category C unless a soils report verifies otherwise; 18-inch frost depth; 20°F winter design temperature; site-specific snow load per ASCE Hazard Tool)
  • Energy compliance evaluated under the 2012 IECC Climate Zone 4B tables (Roof R-49; Wall R-20; Floor R-19; Slab R-10 for 24 in; Window U-factor 0.35, SHGC 0.40); ResCheck documentation required
  • Construction documents, structural calculations, and (where applicable) a soils report and truss calculations with Engineer of Record verification must be submitted
  • Submittal via the PrescottPermits.com online portal, per the New Single Family Residence Checklist (combined 24x36 Plans file plus 8.5x11 Supporting Documents file)
  • Additional Engineering, Right-of-Way, Fire, or property-specific (floodplain/WUI/Historic District/Airport District) requirements may apply and must be checked before submittal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationCity of Prescott Building Valuation and Fee Estimator (rev. 12/26/2025, effective Jan. 2026); figures are approximate as the table revises twice yearly
Total Building Value (per 2026 IBC Valuation Table, by Occupancy Group/Construction Type, e.g., R-3 Type VB = $171/sq ft) × 0.00461 multiplier
Plan Review/Submittal FeeCity of Prescott Building Valuation and Fee Estimator, 1-2 Unit Residential worksheet
Minimum $43 if total building value is under $14,000; otherwise calculated as part of the Building Fee worksheet
Electrical / Mechanical / Fuel Gas Fee (each), 1-2 Unit ResidentialCity of Prescott Building Valuation and Fee Estimator; fuel gas line optional if not used
Total building square footage × $0.0396 per trade
MPF&E Plan Review FeeCity of Prescott Building Valuation and Fee Estimator, 1-2 Unit Residential worksheet
Combined M/P/FG/E fee total × 65%
Building Residential Plan Review Deposit Amount, New Single FamilyCity of Prescott Building Valuation and Fee Estimator (rev. 12/26/2025)
$788.00
C of O Walk-thru, Residential Building onlyCity of Prescott Building Valuation and Fee Estimator (rev. 12/26/2025)
$198.00

Review timeline

Plan reviewPrescott’s published plan-review target
15–15 business days

How long did your Residential Building Permit (New Single-Family Residence / Duplex) permit actually take in Prescott?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IRC and City of Prescott design criteria

  3. 3

    Rough Electrical/Mechanical/Plumbing

    Before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; C of O walk-through required before occupancy

See the full Prescott inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's published Plan Review Timeline table (current as of this review), 'Single Family Residential and Duplexes - New Single Family' averages 15 business days for the first review round and 7 business days for each additional round.
  • An Administrative Completeness Check (5 business days for round 1, 5 for additional rounds) occurs before substantive plan review begins for all permit types.
  • Inspections can be scheduled online as early as the next business day if requested before midnight; inspections run Monday-Friday, 8 a.m.-3 p.m., not on weekends or City holidays.
  • Model Plan/Model Site expedited review is available for production builders in mass-graded subdivisions with released water-meter approvals — see the Model Plan Permit Application Checklist.

Frequently asked questions

Prescott requires a residential building permit (new single-family residence / duplex) for: Building permit required for new single-family residence and duplex construction within Prescott city limits; Plans must comply with the 2024 IRC and City of Prescott amendments, and the City's Residential Design Criteria (105 mph wind Exposure C; Seismic Design Category C unless a soils report verifies otherwise; 18-inch frost depth; 20°F winter design temperature; site-specific snow load per ASCE Hazard Tool); Energy compliance evaluated under the 2012 IECC Climate Zone 4B tables (Roof R-49; Wall R-20; Floor R-19; Slab R-10 for 24 in; Window U-factor 0.35, SHGC 0.40); ResCheck documentation required; Construction documents, structural calculations, and (where applicable) a soils report and truss calculations with Engineer of Record verification must be submitted; Submittal via the PrescottPermits.com online portal, per the New Single Family Residence Checklist (combined 24x36 Plans file plus 8.5x11 Supporting Documents file); Additional Engineering, Right-of-Way, Fire, or property-specific (floodplain/WUI/Historic District/Airport District) requirements may apply and must be checked before submittal. If your project isn't listed, confirm with City of Prescott Community Development Department — Building Division / Permit Center at 928-777-1371 before starting work.

In Prescott, the published Building Permit Fee — Based on Valuation is: Total Building Value (per 2026 IBC Valuation Table, by Occupancy Group/Construction Type, e.g., R-3 Type VB = $171/sq ft) × 0.00461 multiplier. Additional published fees: Plan Review/Submittal Fee — Minimum $43 if total building value is under $14,000; otherwise calculated as part of the Building Fee worksheet; Electrical / Mechanical / Fuel Gas Fee (each), 1-2 Unit Residential — Total building square footage × $0.0396 per trade; MPF&E Plan Review Fee — Combined M/P/FG/E fee total × 65%; Building Residential Plan Review Deposit Amount, New Single Family — $788.00; C of O Walk-thru, Residential Building only — $198.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City of Prescott's published Plan Review Timeline, a new single-family residence or duplex permit averages 15 business days for the first review round and 7 business days for each additional round, following a 5-business-day administrative completeness check.

You'll need: New Single Family Residence Checklist; Site/Plot Plan; Structural Plan and Calculations; ResCheck / Manual J, S, D. See the required-documents checklist on this page for details on each.

Prescott requires 4 inspection(s) for a residential building permit (new single-family residence / duplex), in order: Foundation/Footing, Framing, Rough Electrical/Mechanical/Plumbing, Final / Certificate of Occupancy. Schedule each through City of Prescott Community Development Department — Building Division / Permit Center (928-777-1371).

Apply through City of Prescott Community Development Department — Building Division / Permit Center at 201 N Montezuma Street, Prescott, AZ 86301. Phone: 928-777-1371, email: buildingpermits@prescott-az.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Applications are submitted online through the PrescottPermits.com portal (all permit types, including plan-reviewed and same-day Fast Track permits). On-site building inspections are performed Monday through Friday, 8 a.m. to 3 p.m., except City holidays; inspections can be scheduled online as early as the next business day (up to 5 business days out) if requested before midnight. Note: the City's Building Permit application checklists (rev. 2023-2024) list an older office address of 201 S Cortez St, Prescott, AZ 86303 — the current Permit Center pages (2025-2026 vintage) consistently list 201 N Montezuma Street, Prescott, AZ 86301, which is used here as the verified current address.. Official information: https://prescott-az.gov/permit-center/.

Prescott, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Prescott's Community Development Department (Building Division) independently adopts and administers its own construction codes and Permit Center program; it does not defer permitting to Yavapai County. Source: City of Prescott Permit Center / Building Permits page (prescott-az.gov/permit-center/permit-categories/building-permits/).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by the City of Prescott with local amendments codified at Prescott City Code Chapter 3, Article 3-1, 3-2, and 3-5. Currently in effect for plan review. Source: City of Prescott Building Permits page, '2024 Codes-Design Criteria' handout (rev. 01/01/2026), and Prescott City Code (codepublishing.com/AZ/Prescott).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference with City of Prescott amendments (Prescott City Code Article 3-8). Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026).; 2024 International Mechanical Code (IMC), adopted with City of Prescott amendments. Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026); 2024 IMC Significant Changes handout.; 2024 International Plumbing Code (IPC), adopted with City of Prescott amendments (Prescott City Code Article 3-6). Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026); 2024 IPC Significant Changes handout.; 2023 National Electrical Code (NEC), adopted with City of Prescott amendments (Prescott City Code Article 3-7) — one edition behind the 2024 ICC set, matching the standard NFPA 3-year NEC cycle. Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026); 2023 NEC Significant Changes handout.; 2024 International Fuel Gas Code (IFGC), adopted with City of Prescott amendments. Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026).; 2024 International Existing Building Code (IEBC), adopted with City of Prescott amendments. Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026); 2024 IEBC Significant Changes handout.; 2024 International Fire Code (IFC), adopted by reference (Prescott City Code Article 6-1) as the City's uniform fire code, with a dedicated Urban-Wildland Interface amendment (Article 6-2) administered by the Prescott Fire Department. Source: City of Prescott '2024 Codes-Design Criteria' handout; Prescott City Code Article 6-1/6-2.; 2012 International Energy Conservation Code (IECC), adopted with City of Prescott amendments (Prescott City Code Article 3-18) — the City has NOT moved to a newer IECC edition; energy compliance for the 2024 code cycle is still evaluated under the 2012 IECC Climate Zone 4B tables. Source: City of Prescott '2024 Codes-Design Criteria' handout (rev. 01/01/2026), which explicitly lists '2012 International Energy Conservation Code (IECC)' alongside the otherwise-2024 code set.; City of Prescott Administrative Building Code (Prescott City Code Article 3-17) governs permit administration, application processing, plan review, and issuance procedures citywide, overriding the ICC model codes' own administrative chapters where they conflict. Source: Prescott City Code Article 3-17 (codepublishing.com/AZ/Prescott).. Local amendments apply — see the Prescott overview page for the full list.

The 2024 IRC (and 2024 IBC where applicable) as adopted and amended by the City of Prescott, with energy compliance still evaluated under the 2012 IECC (Climate Zone 4B) — the City has not adopted a newer IECC edition.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.