Tenant Improvement Permit — Sedona, Arizona · Requirements sheet
Verified 2026-08-01 · Source: https://www.sedonaaz.gov/your-government/departments/community-development/permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Tenant Improvement Permit in Sedona, Arizona
Required for interior remodeling of an existing commercial building in Sedona -- published by the City as a distinct permit packet, separate and separately linked from the Commercial Building Permit Packet used for new construction, with its own scope limits and its own flat (non-tiered) review timeline. A Tenant Improvement Permit does NOT authorize any exterior modifications to the existing structure; those instead fall under the Commercial Building Permit (Alteration/Addition scope). Sedona also separately publishes a Tenant Occupancy Permit for any new business occupying commercial space or an existing business changing locations, which covers only minor work (relocating a register/counter, display cases, or up to 3 light fixtures with no ceiling/wall rewiring) -- any work beyond that narrow scope requires this Tenant Improvement Permit instead.
Verified 2026-08-01 · Source
When you need this permit
- Tenant Improvement Permit required for remodeling the interior of an existing commercial building; this permit does not authorize any exterior modifications to the existing structure (exterior work requires the Commercial Building Permit's Alteration/Addition scope instead)
- Applied for on the same Commercial Building Permit Application used for new construction, with the 'Tenant Improvement' box checked rather than 'New Construction'
- Fire sprinklers are required if the valuation of the proposed improvements exceeds 10% of the valuation of the existing structure
- Per ADAAG (Americans with Disabilities Act Accessibility Guidelines), at least 20% of the cost of the alterations must be used to remove existing accessibility barriers
- Professional (architect/designer) design and construction drawings required for any structure exceeding 3,000 sq ft or with an occupant load of more than 20; professional engineering required for electrical services greater than 600 amps (single phase) or 225 amps, 120/208 volts (three phase)
- 3 sets of plans plus electronic link, minimum sheet size 18" x 24", drawn to scale and dimensioned; floor, electrical, mechanical, and plumbing plans required
- A Color and Material Sample Sheet is required only if exterior painting occurs; an Outdoor Lighting Application and/or Sign Permit Application are required only if those scopes apply
- A final inspection must be requested and passed, with Certificate of Occupancy issued (Building Department and Sedona Fire District sign-off), before opening for business or occupying the space; operating without a valid Certificate of Occupancy is illegal
- Progress inspections must occur at least every 180 days to keep the permit active; the permit expires 180 days after issuance unless work has commenced and is being diligently pursued to completion
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Structural/Electrical/Plumbing/Mechanical)
Before walls are closed, per scope of interior work
- 2
Fire Sprinkler / Fire Alarm
Required only where fire sprinklers are triggered (improvements exceeding 10% of existing structure valuation); inspected by the Sedona Fire District
- 3
Final / Certificate of Occupancy
Requires sign-off from both the Building Department and the Sedona Fire District; must be requested and passed before opening for business or occupying the structure
See the full Sedona inspection guide — scheduling & re-inspection fees →
Tips
- A Tenant Improvement Permit is scoped to INTERIOR work only -- the packet explicitly states it 'does not authorize any exterior modifications to the existing structure.' If your project includes exterior changes, that scope needs the Commercial Building Permit's Alteration/Addition track instead.
- The Tenant Improvement review timeline (flat 42 business days) is shorter than the size-tiered Commercial Building Permit timeline for new construction (51-150 business days) -- because it is scoped to interior remodel work regardless of the tenant space's square footage.
- Minor work (relocating a register/counter or display case with minor electrical, or installing/relocating up to 3 light fixtures with no ceiling/wall rewiring) may fall instead under a Tenant Occupancy Permit rather than requiring a full Tenant Improvement Permit -- confirm your specific scope with Community Development.
- ADAAG requires at least 20% of the alteration cost to go toward removing existing accessibility barriers -- budget for this on any tenant improvement with a non-trivial construction valuation.
- The Fee Schedule's 'Tenant Improvements $50.00 per sq. ft. or actual construction cost estimate' line is ambiguous as published -- it is not clear whether this is the literal permit fee or a valuation input for the standard percentage-of-valuation fee table. Get a written fee estimate from Community Development before budgeting for a specific project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sedona building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Sedona.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Sedona
Tenant Improvement Permit in other cities
Compare tenant improvement permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Sedona project checklist
Describe your project once and get every permit, document, and fee it triggers in Sedona — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →