Solar Water Heater Permit — Sedona, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.sedonaaz.gov/your-government/departments/community-development/permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Water Heater Permit in Sedona, Arizona
Required for installation of solar water heating systems in Sedona, published by the City as a distinct permit type from the standard photovoltaic (electric) solar permit, and processed through the same building permit application and A.R.S. § 9-836 review time frame as other residential permit types.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for solar water heater installation, separate from the photovoltaic (electric) solar permit type
- Site plan and equipment specification sheets required for the solar thermal collector and storage tank installation
- Unless exempt under A.R.S. § 32-1121, installation must be performed by an Arizona-licensed contractor Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Plumbing/mechanical connections for the solar collector and storage tank before concealment
- 2
Final
System operational, connections and mounting verified
See the full Sedona inspection guide — scheduling & re-inspection fees →
Tips
- Sedona publishes Solar Water Heater as a permit type distinct from Solar/Photovoltaic on its Permits page — the two use separate application packets even though both fall under the general building-permit review process.
- Same A.R.S. § 9-836 time frame as the City's other core residential permit types: 21 business days Administrative Completeness + 21 business days Substantive Review = 42 business days overall, per the City's Title 15 authorizing code as applied consistently across its permit packets.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sedona building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sedona
Compare solar water heater permit fees across Arizona →
Look up this fee in a different city →