Change of Use / Tenant Occupancy Permit in Sedona, Arizona

Sedona's instrument for a change of occupant or use of an existing commercial space is the Tenant Occupancy Permit, issued by the City of Sedona Community Development Department. The City's Permits page files it under 'Businesses — Moving into or renovating a new location?', and the City's Sign Permit Requirements sheet states that new businesses or new business owners are required to obtain a Tenant Occupancy Permit prior to occupancy of any building. The Consolidated Fee Schedule effective January 1, 2026 prices 'Tenant occupancy' at $50 under Community Development 'Other Inspections and Fees.' The packet warns in red that 'It is illegal to operate a Business without a valid Certificate of Occupancy (A Tenant Occupancy Permit is not a Certificate of Occupancy).' Where the change of use also involves construction, the City issues a separate Tenant Improvement permit.

Reviewed 2026-08-16 · Source

When you need this permit

  • Complete the Tenant Occupancy Permit Application and the Commercial Preliminary Questionnaire, both included in the City's Tenant Occupancy Permit Packet
  • New businesses and new business owners must obtain a Tenant Occupancy Permit prior to occupancy of any building (City of Sedona Sign Permit Requirements sheet)
  • A Tenant Occupancy Permit is not a Certificate of Occupancy — the packet states in red that it is illegal to operate a business without a valid Certificate of Occupancy
  • The application can be downloaded from the Community Development website at sedonaaz.gov/cd under the 'Permits' button, or a paper copy obtained at 104 Roadrunner Drive or by calling 928-282-1154
  • The packet directs applicants to contact the agencies whose requirements may apply to the specific project: City of Sedona Building Safety Division 928-282-1154; Yavapai County 928-639-8100; Coconino County 928-774-5011; Sedona Fire District 928-282-6800; Arizona Public Service 928-284-4000; AZ Water Company 928-282-5555; and Unisource Gas Company 928-282-3919
  • Where the change of use involves construction or build-out, file the City's separate Tenant Improvement permit; tenant improvement valuation is set at $50.00 per sq. ft. or the actual construction cost estimate as determined by the building official

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Tenant occupancyCity of Sedona Consolidated Fee Schedule effective January 1, 2026, Community Development section, under the 'Other Inspections and Fees' heading — read from a 200 dpi rendered image of PDF page 26, not from text extraction.
$50
Tenant improvements — valuation basis (where the change of use involves construction)City of Sedona Consolidated Fee Schedule effective January 1, 2026, Community Development section, 'Other Inspections and Fees,' PDF page 26 — read from a rendered page image. This is a valuation input, not a permit fee: the resulting building permit fee is then computed from the Valuation/Permit Fee Schedule, with the plan review fee at 65 percent of the building permit fee per Sedona City Code § 15.05.060.
$50.00 per sq. ft., or the actual construction cost estimate as determined by the building official
Fee for temporary certificate of occupancy — commercialCity of Sedona Consolidated Fee Schedule effective January 1, 2026, Community Development section, PDF page 27 — read from a 200 dpi rendered page image. The residential equivalent is $300.
$500
Fee for temporary certificate of occupancy — residentialCity of Sedona Consolidated Fee Schedule effective January 1, 2026, Community Development section, PDF page 27 — read from a rendered page image.
$300
Doubling penalty — use/occupancy without permitsCity of Sedona Consolidated Fee Schedule effective January 1, 2026, Community Development section standing note: 'All fees doubled for review of application(s) for work performed or use/occupancy without permits.' PDF page 38.
All fees doubled

Review timeline

Plan reviewSedona’s published plan-review target
42–42 business days

How long did your Change of Use / Tenant Occupancy Permit permit actually take in Sedona?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Tenant occupancy inspection

    The $50 'Tenant occupancy' fee is listed under 'Other Inspections and Fees' in the City's Consolidated Fee Schedule, indicating an inspection-based process. The City publishes no detailed inspection sequence for the Tenant Occupancy Permit.

See the full Sedona inspection guide — scheduling & re-inspection fees →

Tips

  • Sedona's term is 'Tenant Occupancy Permit' — there is no permit called a 'change of use permit' on the City's Permits page. Look under 'Businesses — Moving into or renovating a new location?'
  • A Tenant Occupancy Permit is explicitly NOT a Certificate of Occupancy. The packet warns in red that it is illegal to operate a business without a valid Certificate of Occupancy.
  • Budget 42 business days: the packet's published A.R.S. § 9-836 time frame is 21 business days administrative completeness plus 21 business days substantive review.
  • Sedona straddles two counties, and the Tenant Occupancy packet reflects that — it lists both Yavapai County (928-639-8100) and Coconino County (928-774-5011) as agencies to contact, alongside the separate Sedona Fire District (928-282-6800), which is the fire authority for the area rather than the City.
  • If the new use requires build-out, file the separate Tenant Improvement permit as well; tenant improvement valuation is $50.00 per square foot or the building official's actual construction cost estimate.
  • Occupying without the permit is costly: the Consolidated Fee Schedule doubles all fees for review of applications covering 'work performed or use/occupancy without permits.'

Frequently asked questions

Sedona requires a change of use / tenant occupancy permit for: Complete the Tenant Occupancy Permit Application and the Commercial Preliminary Questionnaire, both included in the City's Tenant Occupancy Permit Packet; New businesses and new business owners must obtain a Tenant Occupancy Permit prior to occupancy of any building (City of Sedona Sign Permit Requirements sheet); A Tenant Occupancy Permit is not a Certificate of Occupancy — the packet states in red that it is illegal to operate a business without a valid Certificate of Occupancy; The application can be downloaded from the Community Development website at sedonaaz.gov/cd under the 'Permits' button, or a paper copy obtained at 104 Roadrunner Drive or by calling 928-282-1154; The packet directs applicants to contact the agencies whose requirements may apply to the specific project: City of Sedona Building Safety Division 928-282-1154; Yavapai County 928-639-8100; Coconino County 928-774-5011; Sedona Fire District 928-282-6800; Arizona Public Service 928-284-4000; AZ Water Company 928-282-5555; and Unisource Gas Company 928-282-3919; Where the change of use involves construction or build-out, file the City's separate Tenant Improvement permit; tenant improvement valuation is set at $50.00 per sq. ft. or the actual construction cost estimate as determined by the building official. If your project isn't listed, confirm with City of Sedona Community Development Department — Building Safety Division at 928-282-1154 before starting work.

Sedona charges $50 for a Tenant Occupancy Permit, listed as 'Tenant occupancy' under Community Development 'Other Inspections and Fees' in the Consolidated Fee Schedule effective January 1, 2026. If the change of use also requires build-out, a separate Tenant Improvement permit is required, valued at $50.00 per square foot or the actual construction cost estimate as determined by the building official, with the permit fee then computed from the City's Valuation/Permit Fee Schedule and a plan review fee of 65 percent of the building permit fee.

The City of Sedona Tenant Occupancy Permit Packet publishes an A.R.S. § 9-836 time frame of 21 business days for administrative completeness and 21 business days for substantive review, for an overall 42 business days. The authorizing code shown on that table is City Code Title 15.

You'll need: Tenant Occupancy Permit Application; Commercial Preliminary Questionnaire. Depending on your project, Sedona may also ask for: Sign Permit Application; Customer Survey Form. See the required-documents checklist on this page for details on each.

Sedona requires 1 inspection(s) for a change of use / tenant occupancy permit, in order: Tenant occupancy inspection. Schedule each through City of Sedona Community Development Department — Building Safety Division (928-282-1154).

Apply through City of Sedona Community Development Department — Building Safety Division at 102 Roadrunner Drive, Sedona, AZ 86336-3710 (Community Development front counter address also published as 104 Roadrunner Drive in some permit packets). Phone: 928-282-1154, email: Permittechs@sedonaaz.gov. Office hours: Community Development Department phone hours Monday - Thursday, 7:00 a.m. - 6:00 p.m. (4-day, 10-hour City workweek); lobby/front counter hours Monday - Thursday, 7:30 a.m. - 5:00 p.m. Construction Inspection Hotline: 928-282-3268 (call by 3:00 p.m. the business day before to request a next-day inspection). Staff: Steve Mertes, Chief Building Official/Community Development Director, 928-203-5097, smertes@sedonaaz.gov; Becky Oium, Plans Examiner, 928-203-5093; Patty Lewis, Permit Technician, 928-203-5118; Andrew Vaughn, Building Inspector, 928-204-7115, avaughn@sedonaaz.gov.. Official information: https://www.sedonaaz.gov/your-government/departments/community-development/permits.

Sedona, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Sedona runs its own Community Development Department / Building Safety Division and independently adopts and administers its own construction codes as City Code Title 15 (Buildings and Construction); it does not defer permitting to Yavapai County or Coconino County for parcels within Sedona city limits, even though the city itself straddles both counties. Source: Sedona City Code Chapter 15.05 (sedona.municipal.codes/SCC/15.05); City of Sedona Permits and Building Safety webpages.; 2018 International Building Code (IBC), as amended and codified, published by the International Code Council, adopted as the building code of the City of Sedona (Sedona City Code § 15.05.010), with City of Sedona amendments (§ 15.05.020). Adopted by City Council on September 24, 2019 (Ordinance 2019-05, Resolution 2019-18 Exh. A); effective for all permits submitted on or after October 25, 2019. Source: Sedona City Code § 15.05.010/.020; City of Sedona Building Safety and Permits pages ('Building Codes' section).; 2018 International Residential Code (IRC), adopted with City of Sedona amendments (§ 15.05.030/.040), effective October 25, 2019, including the City's amended IRC Table R301.2(1) Climatic and Geographic Design Criteria. Source: Sedona City Code § 15.05.030/.040.; 2018 International Plumbing Code (IPC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage, 'Building Codes' list.; 2018 International Energy Conservation Code (IECC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Mechanical Code (IMC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Existing Building Code (IEBC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Fuel Gas Code (IFGC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted with City of Sedona amendments, effective October 25, 2019 (referenced in the Swimming Pool, Spa and Hot Tub Building Permit Packet's '2019 Amendments to Sedona City Code' insert). Source: City of Sedona Building Safety webpage; City of Sedona Swimming Pool and Spa Building Permit Packet.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Sedona amendments, effective October 25, 2019 (one edition behind the 2018 ICC I-Codes set, consistent with the City's own stated rationale of aligning with 'surrounding communities and counties'). Source: City of Sedona Building Safety webpage.; Manufactured homes, mobile homes, and factory-built buildings are separately defined and regulated under Sedona City Code § 15.05.090 (adopting the Arizona Office of Manufactured Housing construction/installation standards per A.R.S. Title 41, Chapter 16), with the City issuing its own 'Manufactured or factory built home permit' packet for placement, foundation, and site-related requirements. Source: Sedona City Code § 15.05.090; City of Sedona Permits page.; Building permit fees and valuation are governed by Sedona City Code § 15.05.060, which cross-references the City of Sedona Consolidated Fee Schedule (Valuation/Permit Fee Schedule and Unit Permit Fees) as the authoritative fee source rather than the ICC codes' own fee tables; the plan review fee is set at 65 percent of the calculated building permit fee when the permit fee is valuation-based. Source: Sedona City Code § 15.05.060 (sedona.municipal.codes/SCC/15.05.060).. Local amendments apply — see the Sedona overview page for the full list.

No. The City of Sedona Tenant Occupancy Permit Packet states in red on its first page: 'It is illegal to operate a Business without a valid Certificate of Occupancy (A Tenant Occupancy Permit is not a Certificate of Occupancy).' The two are separate documents and a business needs the Certificate of Occupancy to operate lawfully.