Manufactured or Factory-Built Home Permit in Sedona, Arizona

Required for placement of manufactured homes, mobile homes, and factory-built buildings within Sedona city limits. Construction/installation standards for the unit itself are regulated directly by the State of Arizona; the City issues a separate permit for on-site placement, foundation, and site-related zoning compliance under Sedona City Code § 15.05.090.

Verified 2026-07-06 · Source

When you need this permit

  • Manufactured homes must comply with the National Manufactured Home Construction and Safety Standards Act of 1974 and Title VI of the Housing and Community Development Act of 1974, as implemented by the Arizona Office of Manufactured Housing (A.R.S. Title 41, Chapter 16)
  • Mobile homes (built before June 15, 1976, on a permanent chassis) and factory-built buildings are separately defined and regulated under Sedona City Code § 15.05.090
  • City permit required for site placement: foundation/tie-down, utility connections, and zoning compliance (setbacks, lot coverage) distinct from the unit's state-regulated construction standards
  • Recreational vehicles are explicitly excluded from the manufactured/mobile home definitions and are not eligible for this permit type

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Based on Valuation)Sedona City Code § 15.05.060 — no separately itemized flat fee for manufactured/factory-built home placement was found distinct from the general valuation-based building permit fee structure
Per City of Sedona Consolidated Fee Schedule, Valuation/Permit Fee Schedule
Plan Review FeeSedona City Code § 15.05.060
65% of the calculated Building Permit Fee

Review timeline

Plan reviewSedona’s published plan-review target
42–42 business days

How long did your Manufactured or Factory-Built Home Permit permit actually take in Sedona?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Tie-Down

    Verifies foundation and tie-down installation per State and City requirements before utility connection

  2. 2

    Final

    Utility connections, site improvements, and zoning compliance verified before occupancy

See the full Sedona inspection guide — scheduling & re-inspection fees →

Tips

  • Arizona regulates the manufactured home's construction directly through the Office of Manufactured Housing — Sedona's permit covers only the on-site placement, foundation, and zoning-compliance layer, not the unit's factory construction standards.
  • Recreational vehicles (travel trailers, motor homes, park trailers, fifth-wheels) are explicitly defined out of this permit type under Sedona City Code § 15.05.090 and are not eligible for placement under this permit.
  • Same A.R.S. § 9-836 21/21/42 business-day review time frame applies as with the City's other core building permit types, per the City's Title 15 authorizing code.

Frequently asked questions

Sedona requires a manufactured or factory-built home permit for: Manufactured homes must comply with the National Manufactured Home Construction and Safety Standards Act of 1974 and Title VI of the Housing and Community Development Act of 1974, as implemented by the Arizona Office of Manufactured Housing (A.R.S. Title 41, Chapter 16); Mobile homes (built before June 15, 1976, on a permanent chassis) and factory-built buildings are separately defined and regulated under Sedona City Code § 15.05.090; City permit required for site placement: foundation/tie-down, utility connections, and zoning compliance (setbacks, lot coverage) distinct from the unit's state-regulated construction standards; Recreational vehicles are explicitly excluded from the manufactured/mobile home definitions and are not eligible for this permit type. If your project isn't listed, confirm with City of Sedona Community Development Department — Building Safety Division at 928-282-1154 before starting work.

In Sedona, the published Building Permit Fee (Based on Valuation) is: Per City of Sedona Consolidated Fee Schedule, Valuation/Permit Fee Schedule. Additional published fees: Plan Review Fee — 65% of the calculated Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Sedona's published plan-review target for a manufactured or factory-built home permit is 42–42 business days.

You'll need: Manufactured or Factory-Built Home Permit Application; Site Plan; State Insignia / Installation Documentation. See the required-documents checklist on this page for details on each.

Sedona requires 2 inspection(s) for a manufactured or factory-built home permit, in order: Foundation/Tie-Down, Final. Schedule each through City of Sedona Community Development Department — Building Safety Division (928-282-1154).

Apply through City of Sedona Community Development Department — Building Safety Division at 102 Roadrunner Drive, Sedona, AZ 86336-3710 (Community Development front counter address also published as 104 Roadrunner Drive in some permit packets). Phone: 928-282-1154, email: Permittechs@sedonaaz.gov. Office hours: Community Development Department phone hours Monday - Thursday, 7:00 a.m. - 6:00 p.m. (4-day, 10-hour City workweek); lobby/front counter hours Monday - Thursday, 7:30 a.m. - 5:00 p.m. Construction Inspection Hotline: 928-282-3268 (call by 3:00 p.m. the business day before to request a next-day inspection). Staff: Steve Mertes, Chief Building Official/Community Development Director, 928-203-5097, smertes@sedonaaz.gov; Becky Oium, Plans Examiner, 928-203-5093; Patty Lewis, Permit Technician, 928-203-5118; Andrew Vaughn, Building Inspector, 928-204-7115, avaughn@sedonaaz.gov.. Official information: https://www.sedonaaz.gov/your-government/departments/community-development/permits.

Sedona, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Sedona runs its own Community Development Department / Building Safety Division and independently adopts and administers its own construction codes as City Code Title 15 (Buildings and Construction); it does not defer permitting to Yavapai County or Coconino County for parcels within Sedona city limits, even though the city itself straddles both counties. Source: Sedona City Code Chapter 15.05 (sedona.municipal.codes/SCC/15.05); City of Sedona Permits and Building Safety webpages.; 2018 International Building Code (IBC), as amended and codified, published by the International Code Council, adopted as the building code of the City of Sedona (Sedona City Code § 15.05.010), with City of Sedona amendments (§ 15.05.020). Adopted by City Council on September 24, 2019 (Ordinance 2019-05, Resolution 2019-18 Exh. A); effective for all permits submitted on or after October 25, 2019. Source: Sedona City Code § 15.05.010/.020; City of Sedona Building Safety and Permits pages ('Building Codes' section).; 2018 International Residential Code (IRC), adopted with City of Sedona amendments (§ 15.05.030/.040), effective October 25, 2019, including the City's amended IRC Table R301.2(1) Climatic and Geographic Design Criteria. Source: Sedona City Code § 15.05.030/.040.; 2018 International Plumbing Code (IPC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage, 'Building Codes' list.; 2018 International Energy Conservation Code (IECC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Mechanical Code (IMC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Existing Building Code (IEBC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Fuel Gas Code (IFGC), adopted with City of Sedona amendments, effective October 25, 2019. Source: City of Sedona Building Safety webpage.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted with City of Sedona amendments, effective October 25, 2019 (referenced in the Swimming Pool, Spa and Hot Tub Building Permit Packet's '2019 Amendments to Sedona City Code' insert). Source: City of Sedona Building Safety webpage; City of Sedona Swimming Pool and Spa Building Permit Packet.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Sedona amendments, effective October 25, 2019 (one edition behind the 2018 ICC I-Codes set, consistent with the City's own stated rationale of aligning with 'surrounding communities and counties'). Source: City of Sedona Building Safety webpage.; Manufactured homes, mobile homes, and factory-built buildings are separately defined and regulated under Sedona City Code § 15.05.090 (adopting the Arizona Office of Manufactured Housing construction/installation standards per A.R.S. Title 41, Chapter 16), with the City issuing its own 'Manufactured or factory built home permit' packet for placement, foundation, and site-related requirements. Source: Sedona City Code § 15.05.090; City of Sedona Permits page.; Building permit fees and valuation are governed by Sedona City Code § 15.05.060, which cross-references the City of Sedona Consolidated Fee Schedule (Valuation/Permit Fee Schedule and Unit Permit Fees) as the authoritative fee source rather than the ICC codes' own fee tables; the plan review fee is set at 65 percent of the calculated building permit fee when the permit fee is valuation-based. Source: Sedona City Code § 15.05.060 (sedona.municipal.codes/SCC/15.05.060).. Local amendments apply — see the Sedona overview page for the full list.

No — manufactured home construction/installation standards are regulated directly by the State of Arizona (Arizona Office of Manufactured Housing, A.R.S. Title 41, Chapter 16). The City of Sedona's Manufactured or Factory-Built Home Permit covers only site placement: foundation/tie-down, utility connections, and zoning compliance.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sedona building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.