Change of Use / Change of Occupancy Permit (South Metro Fire Rescue) in Columbine Valley, Colorado
South Metro Fire Rescue's own published fee schedule lists a distinct 'Change of Use' line item ($174.24 plan check + $413.75 inspection = $587.99 total), and SMFR's own live 'About Us' page confirms Columbine Valley as a directly served jurisdiction — so this fee mechanism genuinely exists and would apply to a Columbine Valley property. HOWEVER, unlike sibling town Bow Mar (whose own Ordinance No. 340 added a new IFC Sec. 105.6.25 explicitly requiring a fire-code-official permit for anyone who 'intends to... change occupancy of a building'), no equivalent Columbine Valley-specific ordinance provision creating a change-of-use or change-of-occupancy permit REQUIREMENT was located after directly checking the Town's live Building Codes page, Building Permits page, Other Permits page, Fee Schedule, and the full Zoning Code and Land Use Regulations (Trustee Bill #6, Series 2020) — none of these Columbine Valley-published documents use the phrase 'change of occupancy' or 'change of use' as a defined permit trigger. Separately, and administered by the Town rather than SMFR, the Town's Building Department issues a Certificate of Occupancy following a passed final inspection for permitted construction work (documented in the residential-building-permit entry), but this is tied to new construction/remodel completion, not to a standalone occupancy-change scenario. Given Columbine Valley's exclusively residential zoning and confirmed absence of any commercial district (see the tipsAndGotchas), the realistic change-of-occupancy scenario here is narrow to begin with. This entry is rated 'partial' confidence specifically because the SMFR fee line item and general district-service facts are verified, but whether/when this SMFR permit is actually invoked for a Columbine Valley property absent a located Town-level ordinance trigger (the kind Bow Mar has) could not be confirmed.
Verified 2026-08-13 · Source
When you need this permit
- South Metro Fire Rescue's own published 'Systems and Other Fees' schedule lists a distinct 'Change of Use' line item with its own plan-check and inspection fee — confirming the fee mechanism is real and currently administered by SMFR district-wide, independent of any single member town's own code text
- No Columbine Valley ordinance, resolution, or published Town page creates an affirmative 'change of occupancy' or 'change of use' permit requirement the way Bow Mar's Ordinance No. 340 (new IFC Sec. 105.6.25) does — the Town's Building Codes, Building Permits, Other Permits and Fee Schedule pages, the Zoning Code, and the Land Use Regulations (Trustee Bill #6, Series 2020, Articles I-IV) use neither phrase
- Separately, and administered by the Town of Columbine Valley (not SMFR): the Town's Building Department issues a Certificate of Occupancy following a passed final inspection, per the residential-building-permit entry's Inspections section — this process is framed around new-construction/remodel completion rather than a distinct change-of-occupancy scenario for an existing building
- Given Columbine Valley's exclusively residential zoning (seven districts per Art. I, Sec. 5, with no active commercial district — see the tipsAndGotchas), the realistic change-of-occupancy scenarios here are narrow — e.g., converting non-habitable accessory space to a different residential occupancy, or an occupancy change tied to an addition or remodel — not a commercial-tenant occupancy reclassification, since no such use exists anywhere in Town
- Confirm directly with South Metro Fire Rescue (via the Accela Permit Portal, 303-522-3331 or the Town's own Building Department, 303-795-1434) which permit intake, if any, actually governs a specific proposed change of occupancy, since no single published Columbine Valley document walks through this workflow
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
SMFR 'Systems and Other Fees' schedule, Miscellaneous Fees section, directly read 2026-08-13. Show full citationHide
SMFR 'Systems and Other Fees' schedule, Miscellaneous Fees section, directly read 2026-08-13. NOTE: this line item appears on a page of SMFR's own fee-schedule PDF headed 'Effective Date: January 1, 2025,' while other pages of the same document (including the sprinkler/alarm fee tables used in the fire-sprinkler-alarm-permit entry) are headed 'Effective Date: January 1, 2026' — a genuine internal dating inconsistency in SMFR's own published document, flagged rather than silently normalized; confirm the currently-effective figure directly with SMFR before budgeting. Whether this fee is actually assessed on a Columbine Valley property depends on whether SMFR's change-of-use review is invoked for that project in the first place, which is not independently confirmed for Columbine Valley (see this entry's description).Review timeline
Inspection process
- 1
Town of Columbine Valley Certificate of Occupancy Inspection
Final inspection by the Town Building Department confirming the property is ready for occupancy, if a new or updated Certificate of Occupancy is required as part of the change; Certificates of Occupancy are issued following a passed final inspection per the residential-building-permit entry
See the full Columbine Valley inspection guide — scheduling & re-inspection fees →
Tips
- Don't assume Columbine Valley's change-of-occupancy process mirrors Bow Mar's just because both towns share SMFR as their fire protection district — Bow Mar's SMFR change-of-use permit traces to a specific ordinance provision (IFC Sec. 105.6.25) that could not be located in Columbine Valley's own published code; confirm directly with the Town and SMFR before assuming this fee/process applies to a specific project.
- Given the Town's total absence of commercial zoning, don't expect a business/tenant occupancy-reclassification scenario here — the practical Columbine Valley use case, if any, is closer to a residential occupancy change tied to an addition or an accessory-space conversion.
- The Town's own Certificate of Occupancy (issued after a passed final inspection on a permitted construction project) is the one change-of-occupancy-adjacent process that IS clearly documented for Columbine Valley — treat SMFR's separate 'Change of Use' fee line item as a possible additional step to confirm, not a substitute for the Town's own CO process.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Columbine Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Columbine Valley's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Columbine Valley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Columbine Valley lands. Privacy.
Other permits in Columbine Valley
Change of Use / Change of Occupancy Permit (South Metro Fire Rescue) in other cities
Compare change of use / change of occupancy permit (south metro fire rescue) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Columbine Valley project checklist
Describe your project once and get every permit, document, and fee it triggers in Columbine Valley — in one checklist. Free, for any city and any number of projects.
Get started →