Demolition Permit in Columbine Valley, Colorado

Required for structure demolition in Columbine Valley, issued via a dedicated Demolition Permit Application distinct from the general Building Permit tracks. Mandatory asbestos testing applies to all demolition projects.

Verified 2026-07-06 · Source

When you need this permit

  • An asbestos test is required for ALL demolition projects, with documentation submitted to the Town
  • A positive asbestos test result mandates abatement before demolition may proceed
  • HOA approval likely required depending on HOA covenant scope (not explicitly stated for demolition specifically, but generally required for exterior work per the Town's Building Permits page)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-tiered; no separate flat demolition fee published)No demolition-specific fee line found in the Fee Schedule PDF or webpage; billed under the general schedule
$33 minimum, scaling per the Town's general Building Permit Fee Schedule
Inspection / Re-inspection Fee
$45 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Columbine Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (demolition complete)

    Site cleared, utilities properly capped/disconnected

See the full Columbine Valley inspection guide — scheduling & re-inspection fees →

Tips

  • Asbestos testing is mandatory for every demolition project in Columbine Valley regardless of the structure's age or size — budget for this test and its lead time before applying.

Frequently asked questions

Yes. The Town's Building Department FAQs state an asbestos test is required for all demolition projects, and a positive result requires abatement before demolition can proceed.

In Columbine Valley, the published Building Permit Fee (valuation-tiered; no separate flat demolition fee published) is: $33 minimum, scaling per the Town's general Building Permit Fee Schedule. Additional published fees: Inspection / Re-inspection Fee — $45 per inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Columbine Valley does not publish a plan-review timeline for this permit. Contact Town of Columbine Valley Building Department at 303-795-1434 for current turnaround.

You'll need: Demolition Permit Application; Asbestos Test Report. See the required-documents checklist on this page for details on each.

Columbine Valley requires 1 inspection(s) for a demolition permit, in order: Final Inspection (demolition complete). Schedule each through Town of Columbine Valley Building Department (303-795-1434).

Apply through Town of Columbine Valley Building Department at 2 Middlefield Road, Columbine Valley, CO 80123. Phone: 303-795-1434, email: bzapata-diaz@columbinevalley.org. Office hours: Monday through Friday, 8 a.m. to 1 p.m., or by appointment (Town Hall itself is open until 4 p.m.). Building Department Coordinator: Bonnie Zapata-Diaz. Inspection requests must be called in to 303-795-1434 between 8 a.m. and noon, Monday through Friday. Dispatch line (non-emergency): 303-795-4711.. Official information: https://columbinevalley.org/building-department/.

Columbine Valley, Colorado has adopted: 2024 International Building Code (IBC) — Town of Columbine Valley Building Codes page, current as of page last-modified date 2026-06-17; 2024 International Residential Code (IRC) — same page, adopted alongside the IBC; 2023 National Electrical Code (NEC) — same page; Note on code scope: the Town's live Building Codes page (columbinevalley.org/building-codes/) names ONLY the 2024 IBC, 2024 IRC, and 2023 NEC by edition; it does NOT separately name adopted editions of the IECC (energy code), IPC (plumbing code), IMC (mechanical code), IFGC (fuel gas code), IFC (fire code), or IEBC (existing building code) anywhere on that page, the Building Department page, the Building Permits page, or the Fee Schedule page — checked all directly. This is a materially thinner published code-adoption list than larger peer Colorado jurisdictions in this corpus (e.g. Vail names 9 separate model codes). It is plausible the IRC/IBC editions carry their own internal plumbing/mechanical/fuel-gas provisions by reference (both the IBC and IRC contain their own integrated plumbing/mechanical/fuel-gas chapters or cross-reference companion I-Codes), but the Town does not state this explicitly, so no separate IPC/IMC/IFGC edition is asserted here.; Third-party aggregator ColoradoEnergy.org's code database lists Columbine Valley under a stale 'IRC 2003 / NEC 2003' entry with no IECC data — this aggregator is out of date relative to the Town's own live, actively-maintained Building Codes page (dateModified 2026-06-17) and is NOT used as a source for this file's codesAdopted list, per this corpus's official-source-only policy.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Reduction Act) note: this statute requires any Colorado local government that adopts or updates ANY building code between July 1, 2023 and July 1, 2026 to concurrently adopt the 2021 IECC (or equivalent) plus an Electric Ready and Solar Ready code. The Town's Building Codes page shows a dateModified of 2026-06-17 (within this window) and reflects an update from a prior code cycle to the 2024 IBC/IRC — however, the Town's own page does not mention IECC, Electric Ready, or Solar Ready adoption anywhere, and no separate ordinance or resolution documenting HB22-1362 compliance was found after searching the Town's website, Board of Trustees packets, and general web search. This is flagged as an open compliance question rather than assumed either way — the Town may be out of step with HB22-1362, may have adopted an energy code not documented on this particular webpage, or the page update may not itself constitute a triggering 'adoption or update' event under the statute's technical definition. Confidence on this specific point is partial; verify directly with the Building Department (303-795-1434) before relying on it for compliance purposes.. Local amendments apply — see the Columbine Valley overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Columbine Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.