Building Permit with Plan Review (Addition / Structural Remodel) in Columbine Valley, Colorado

Required for home additions and structural remodels involving changes to structure, plumbing, or electrical systems, per the Town's 'Building Permit with Plan Review' track. Kitchen and bath remodels may or may not require this track depending on scope; the Town advises contacting Town Hall for a scope determination.

Verified 2026-07-06 · Source

When you need this permit

  • Signed contract between contractor and homeowner submitted with the application
  • HOA approval required for any exterior alterations
  • Applies to home remodels with changes to structure, plumbing, or electrical; also applies to structures anchored by footings/caissons (e.g., pergolas) and complex landscaping projects involving electric, gas, or plumbing work
  • Kitchen/bath remodel scope is case-by-case; contact Town Hall (303-795-1434) for a determination of whether plan review is required
  • Reviewed under the 2024 IBC/IRC as adopted

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-tiered schedule)Town of Columbine Valley Fee Schedule effective Jan. 1, 2026
$33 minimum ($1-$500 valuation), scaling through $7,600 + $5/$1,000 above $1,000,000
Miscellaneous Project Valuation — SFR Addition
$300 per square foot
Miscellaneous Project Valuation — SFR Remodel
$200 per square foot
Miscellaneous Project Valuation — New Basement Finish
$35/sq ft base plus Category 1 ($50/sq ft), Category 2 ($80/sq ft), or Category 3 ($90/sq ft) finish add-on
Plan Review FeeOnly when plans are reviewed for code compliance
65% of Building Permit Fee
Town Sales Tax and Use Tax
Total Job Valuation x 50% x 3%
Arapahoe County Open Space Tax
Total Job Valuation x 50% x 0.25%
Inspection / Re-inspection Fee
$45 per inspection

Review timeline

Plan reviewColumbine Valley’s published plan-review target
2–14 business days

How long did your Building Permit with Plan Review (Addition / Structural Remodel) permit actually take in Columbine Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation (if new footings)

  2. 2

    Rough Frame

    Framing complete, tie-in to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

  4. 4

    Final Inspection

See the full Columbine Valley inspection guide — scheduling & re-inspection fees →

Tips

  • Basement finishes are billed under a three-tier valuation schedule (Category 1/2/3) based on finish quality, not just square footage — a wet bar with granite countertops (Category 3, $90/sq ft) is billed very differently from a basic playroom (Category 1, $50/sq ft) even at identical square footage.
  • Kitchen and bath remodel scope determination is not self-service on the website — call Town Hall directly to confirm whether your specific project needs the full plan-review track.

Frequently asked questions

Columbine Valley requires a building permit with plan review (addition / structural remodel) for: Signed contract between contractor and homeowner submitted with the application; HOA approval required for any exterior alterations; Applies to home remodels with changes to structure, plumbing, or electrical; also applies to structures anchored by footings/caissons (e.g., pergolas) and complex landscaping projects involving electric, gas, or plumbing work; Kitchen/bath remodel scope is case-by-case; contact Town Hall (303-795-1434) for a determination of whether plan review is required; Reviewed under the 2024 IBC/IRC as adopted. If your project isn't listed, confirm with Town of Columbine Valley Building Department at 303-795-1434 before starting work.

In Columbine Valley, the published Building Permit Fee (valuation-tiered schedule) is: $33 minimum ($1-$500 valuation), scaling through $7,600 + $5/$1,000 above $1,000,000. Additional published fees: Miscellaneous Project Valuation — SFR Addition — $300 per square foot; Miscellaneous Project Valuation — SFR Remodel — $200 per square foot; Miscellaneous Project Valuation — New Basement Finish — $35/sq ft base plus Category 1 ($50/sq ft), Category 2 ($80/sq ft), or Category 3 ($90/sq ft) finish add-on; Plan Review Fee — 65% of Building Permit Fee; Town Sales Tax and Use Tax — Total Job Valuation x 50% x 3%; Arapahoe County Open Space Tax — Total Job Valuation x 50% x 0.25%; Inspection / Re-inspection Fee — $45 per inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Columbine Valley's published plan-review target for a building permit with plan review (addition / structural remodel) is 2–14 business days.

You'll need: Building Permit Application; Signed Contractor-Homeowner Contract. Depending on your project, Columbine Valley may also ask for: HOA Approval. See the required-documents checklist on this page for details on each.

Columbine Valley requires 4 inspection(s) for a building permit with plan review (addition / structural remodel), in order: Foundation (if new footings), Rough Frame, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Town of Columbine Valley Building Department (303-795-1434).

Apply through Town of Columbine Valley Building Department at 2 Middlefield Road, Columbine Valley, CO 80123. Phone: 303-795-1434, email: bzapata-diaz@columbinevalley.org. Office hours: Monday through Friday, 8 a.m. to 1 p.m., or by appointment (Town Hall itself is open until 4 p.m.). Building Department Coordinator: Bonnie Zapata-Diaz. Inspection requests must be called in to 303-795-1434 between 8 a.m. and noon, Monday through Friday. Dispatch line (non-emergency): 303-795-4711.. Official information: https://columbinevalley.org/building-department/.

Columbine Valley, Colorado has adopted: 2024 International Building Code (IBC) — Town of Columbine Valley Building Codes page, current as of page last-modified date 2026-06-17; 2024 International Residential Code (IRC) — same page, adopted alongside the IBC; 2023 National Electrical Code (NEC) — same page; Note on code scope: the Town's live Building Codes page (columbinevalley.org/building-codes/) names ONLY the 2024 IBC, 2024 IRC, and 2023 NEC by edition; it does NOT separately name adopted editions of the IECC (energy code), IPC (plumbing code), IMC (mechanical code), IFGC (fuel gas code), IFC (fire code), or IEBC (existing building code) anywhere on that page, the Building Department page, the Building Permits page, or the Fee Schedule page — checked all directly. This is a materially thinner published code-adoption list than larger peer Colorado jurisdictions in this corpus (e.g. Vail names 9 separate model codes). It is plausible the IRC/IBC editions carry their own internal plumbing/mechanical/fuel-gas provisions by reference (both the IBC and IRC contain their own integrated plumbing/mechanical/fuel-gas chapters or cross-reference companion I-Codes), but the Town does not state this explicitly, so no separate IPC/IMC/IFGC edition is asserted here.; Third-party aggregator ColoradoEnergy.org's code database lists Columbine Valley under a stale 'IRC 2003 / NEC 2003' entry with no IECC data — this aggregator is out of date relative to the Town's own live, actively-maintained Building Codes page (dateModified 2026-06-17) and is NOT used as a source for this file's codesAdopted list, per this corpus's official-source-only policy.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Reduction Act) note: this statute requires any Colorado local government that adopts or updates ANY building code between July 1, 2023 and July 1, 2026 to concurrently adopt the 2021 IECC (or equivalent) plus an Electric Ready and Solar Ready code. The Town's Building Codes page shows a dateModified of 2026-06-17 (within this window) and reflects an update from a prior code cycle to the 2024 IBC/IRC — however, the Town's own page does not mention IECC, Electric Ready, or Solar Ready adoption anywhere, and no separate ordinance or resolution documenting HB22-1362 compliance was found after searching the Town's website, Board of Trustees packets, and general web search. This is flagged as an open compliance question rather than assumed either way — the Town may be out of step with HB22-1362, may have adopted an energy code not documented on this particular webpage, or the page update may not itself constitute a triggering 'adoption or update' event under the statute's technical definition. Confidence on this specific point is partial; verify directly with the Building Department (303-795-1434) before relying on it for compliance purposes.. Local amendments apply — see the Columbine Valley overview page for the full list.

It depends on scope. The Town's FAQs state permits 'may be necessary depending on scope' for kitchen/bath remodeling and direct applicants to contact Town Hall (303-795-1434) for a determination.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Columbine Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.