Skip to main content
PermitBase

Plumbing Permit (Building Permit with Plan Review) in Columbine Valley, Colorado

Columbine Valley does not publish a standalone Plumbing Permit application; plumbing work is processed under the Town's 'Building Permit with Plan Review' track whenever it involves changes to structure, plumbing, or electrical systems, or under the Non-Structural track for simpler fixture-level work. The Town's Contractor License fee schedule bills a distinct 'Plumber' license category ($100/year full, $50/half-year), indicating the Town runs its own local plumbing-permit and licensing program rather than deferring entirely to the Colorado State Plumbing Board.

Reviewed 2026-07-06 · Source

When you need this permit

  • Plumbing work bundled with structural changes requires the Building Permit with Plan Review track
  • Homeowners occupying their own property may perform plumbing work without a contractor license per the Town's FAQs, but must still obtain the applicable permit Contractor
  • Plumbing contractors must hold a current Town of Columbine Valley Plumber contractor license ($100/year, $50 half-year after June 30), in addition to any Colorado state-level plumbing licensure Contractor
  • Governed by the 2024 IBC/IRC as adopted (the Town's Building Codes page does not separately name an IPC edition)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee (valuation-tiered; no separate plumbing-only fee table published)
Town of Columbine Valley Building Permit Fee Schedule, effective August 14, 2026 — Building Permit Fee Schedule, lowest valuation tier ($1–$500) at $66.50; Show full citationTown of Columbine Valley Building Permit Fee Schedule, effective August 14, 2026 — Building Permit Fee Schedule, lowest valuation tier ($1–$500) at $66.50; higher tiers scale from the same table. This supersedes the January 1, 2026 edition the record previously cited, in which the minimum was $33.00; the superseded PDF is still reachable at its old URL but is no longer linked from the Town's Fee Schedule page.
$66.50 minimum, scaling per the Town's general Building Permit Fee Schedule
Plumber Contractor License
Town of Columbine Valley Contractor Licenses page — Plumber, Roofer and Mechanical licences are $100, and “contractor licenses are in effect for one year from the date of registration.” The half-year… Show full citationTown of Columbine Valley Contractor Licenses page — Plumber, Roofer and Mechanical licences are $100, and “contractor licenses are in effect for one year from the date of registration.” The half-year $50 tier for applications after June 30 that the record previously carried has been removed, and the term is now a rolling year rather than a calendar year expiring December 31.
$100 per year
Inspection / Re-inspection FeeTown of Columbine Valley Building Permit Fee Schedule, effective August 14, 2026 — “Inspection and re-inspection fees shall be $45 per inspection.” This figure is unchanged from the prior edition.
$45 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit (Building Permit with Plan Review) permit actually take in Columbine Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Pipe, drain, waste, vent installation before concealment

  2. 2

    Final Inspection

See the full Columbine Valley inspection guide — scheduling & re-inspection fees →

Tips

  • There is no standalone 'Plumbing Permit' application — plumbing work is folded into the Building Permit with Plan Review (or Non-Structural Building Permit) tracks depending on scope.
  • Plumbing contractors need a Town of Columbine Valley Plumber license ($100/yr) — unlike Electricians, this trade is NOT fee-exempt at the local level.

Frequently asked questions

Columbine Valley requires a plumbing permit (building permit with plan review) for: Plumbing work bundled with structural changes requires the Building Permit with Plan Review track; Homeowners occupying their own property may perform plumbing work without a contractor license per the Town's FAQs, but must still obtain the applicable permit; Plumbing contractors must hold a current Town of Columbine Valley Plumber contractor license ($100/year, $50 half-year after June 30), in addition to any Colorado state-level plumbing licensure; Governed by the 2024 IBC/IRC as adopted (the Town's Building Codes page does not separately name an IPC edition). If your project isn't listed, confirm with Town of Columbine Valley Building Department at 303-795-1434 before starting work.

In Columbine Valley, the published Building Permit Fee (valuation-tiered; no separate plumbing-only fee table published) is: $66.50 minimum, scaling per the Town's general Building Permit Fee Schedule. Additional published fees: Plumber Contractor License — $100 per year; Inspection / Re-inspection Fee — $45 per inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Columbine Valley does not publish a plan-review timeline for this permit. Contact Town of Columbine Valley Building Department at 303-795-1434 for current turnaround.

You'll need: Building Permit Application with Plan Review (or Non-Structural Building Permit for simpler fixture work); Town of Columbine Valley Plumber Contractor License. See the required-documents checklist on this page for details on each.

Columbine Valley requires 2 inspection(s) for a plumbing permit (building permit with plan review), in order: Rough Plumbing, Final Inspection. Schedule each through Town of Columbine Valley Building Department (303-795-1434).

Apply through Town of Columbine Valley Building Department at 2 Middlefield Road, Columbine Valley, CO 80123. Phone: 303-795-1434, email: bzapata-diaz@columbinevalley.org. Office hours: Monday through Friday, 8 a.m. to 1 p.m., or by appointment (Town Hall itself is open until 4 p.m.). Building Department Coordinator: Bonnie Zapata-Diaz. Inspection requests must be called in to 303-795-1434 between 8 a.m. and noon, Monday through Friday. Dispatch line (non-emergency): 303-795-4711.. Official information: https://columbinevalley.org/building-department/.

Columbine Valley, Colorado has adopted: 2024 International Building Code (IBC) — Town of Columbine Valley Building Codes page, current as of page last-modified date 2026-06-17; 2024 International Residential Code (IRC) — same page, adopted alongside the IBC; 2023 National Electrical Code (NEC) — same page; The Town's Building Codes page (columbinevalley.org/building-codes/) names editions for only three codes: the 2024 IBC, the 2024 IRC, and the 2023 NEC. No adopted edition of the IECC (energy), IPC (plumbing), IMC (mechanical), IFGC (fuel gas), IFC (fire), or IEBC (existing building) is named there or on the Building Department, Building Permits, or Fee Schedule pages. The IBC and IRC contain their own integrated plumbing, mechanical, and fuel-gas provisions, but the Town does not state whether it relies on those or adopts companion codes separately, so no separate IPC/IMC/IFGC edition is listed here. If your design turns on an energy, plumbing, mechanical, or fire code edition, confirm it with the Building Department before you finalize drawings.; A third-party code aggregator lists Columbine Valley under a stale 'IRC 2003 / NEC 2003' entry with no IECC data. That aggregator is out of date relative to the Town's own live Building Codes page and is not used as a source here — only official sources are. If you find the older figures quoted elsewhere, disregard them.; HB22-1362 (Colorado Building Greenhouse Gas Emissions Reduction Act) note: this statute requires any Colorado local government that adopts or updates ANY building code between July 1, 2023 and July 1, 2026 to concurrently adopt the 2021 IECC (or equivalent) plus an Electric Ready and Solar Ready code. The Town's Building Codes page shows a dateModified of 2026-06-17 (within this window) and reflects an update from a prior code cycle to the 2024 IBC/IRC — however, the Town's own page does not mention IECC, Electric Ready, or Solar Ready adoption anywhere, and no separate ordinance or resolution documenting HB22-1362 compliance was found after searching the Town's website, Board of Trustees packets, and general web search. This is flagged as an open compliance question rather than assumed either way — the Town may be out of step with HB22-1362, may have adopted an energy code not documented on this particular webpage, or the page update may not itself constitute a triggering 'adoption or update' event under the statute's technical definition. Confidence on this specific point is partial; verify directly with the Building Department (303-795-1434) before relying on it for compliance purposes.. Local amendments apply — see the Columbine Valley overview page for the full list.

No. Plumbing work is processed under the Town's general Building Permit with Plan Review (or Non-Structural Building Permit) application, not a standalone plumbing-specific form. Plumbing contractors do need a distinct $100/year Town Plumber license.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Columbine Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Columbine Valley's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Columbine Valley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Columbine Valley lands. Privacy.