EV Charger / EVSE Permit (Billed as General Building Permit) in Englewood, Colorado
Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in the City of Englewood. Englewood self-administers a single, unified Building Permit covering all trade work — including 'adding or altering electrical systems,' per the City's own 'To Permit or Not To Permit' page — rather than issuing a separate standalone electrical permit type. An EV charger circuit is billed under the same valuation-based Building Permit fee bracket table used for other electrical work, reviewed under the 2024-cycle International Codes and 2023 NEC (Article 625, Electric Vehicle Power Transfer System) as adopted. Englewood's population (approx. 34,000) exceeds the 10,000-resident 'covered municipality' threshold under Colorado HB24-1173 (Electric Vehicle Charging System Permits Act), which required a compliance action (adopting the Colorado Energy Office's EV Charging Model Land Use Code, an equivalent local ordinance, or an opt-out resolution) by Dec. 31, 2025 for LAND USE permitting of EV charging stations — but no separate ordinance, land-use standard, or building/electrical-permit fee change specific to EV chargers was found published by the City as of this review; the Model Code itself exempts ordinary Level 1/Level 2 charging from land-use permitting due to minimal public impact, leaving the building/electrical permit as the operative mechanism for a typical residential charger install.
Verified 2026-07-20 · Source
When you need this permit
- Building Permit required for 'adding or altering electrical systems,' per the City's 'To Permit or Not To Permit' page — no separate EV-charger-specific application exists
- Submitted electronically through ims.englewoodco.gov; hardcopy and locked/image-format submittals are rejected
- Homeowner Affidavit required if the property owner (not a licensed contractor) is performing the work themselves Owner-builderContractor
- Governed by the 2024-cycle International Codes (per the City's Adopted Codes and Amendments page) and 2023 NEC, including Article 625
- All contractors working in Englewood must hold a City Contractor License / Certificate of Registration Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Inspection
Charger circuit wiring verified before concealment, if applicable
- 2
Final Inspection
EVSE installed, GFCI/disconnect and connections verified per 2023 NEC Article 625
See the full Englewood inspection guide — scheduling & re-inspection fees →
Tips
- Englewood has no EV-charger-specific permit or fee line — a charger circuit is billed under the same valuation-based Building Permit table used for any other electrical work, since the City bundles all trades into one unified permit rather than issuing separate standalone electrical permits.
- Englewood is a 'covered municipality' under Colorado's HB24-1173 (population over 10,000), which required a land-use-permitting compliance action for EV charging stations by Dec. 31, 2025 — but that law's Model Code exempts ordinary Level 1/Level 2 residential charging from land-use permitting entirely, so it does not create a distinct building/electrical-permit fee for a typical home charger install; no such fee change was found published.
- The 65% plan review fee is waived for single-family, owner-occupied dwellings — the same exception that applies to the general Building Permit. Owner-builder
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Englewood building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Englewood
EV Charger / EVSE Permit (Billed as General Building Permit) in other cities
Compare ev charger / evse permit (billed as general building permit) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Englewood project checklist
Describe your project once and get every permit, document, and fee it triggers in Englewood — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →