Change of Occupancy (Change of Use) Permit in Parker, Colorado

The Town of Parker's Land Development Ordinance does not have a stand-alone 'Change of Use Permit' procedure. Instead, LDO Sec. 13.01.030(b) makes it 'unlawful to erect, construct, reconstruct, alter, add to, or change the use of any building or other structure... without first obtaining a Building Permit from the Town.' The Building Division processes this as a Building Permit sub-type — Permit Type: COMMERCIAL, Sub-Type: CHANGE OF OCCUPANCY — defined by the Town as 'a change in the occupancy classification'; a new Certificate of Occupancy is issued once approved.

Verified 2026-08-14 · Source

When you need this permit

  • It is unlawful to change the use of any building or other structure without first obtaining a Building Permit from the Town, per LDO Sec. 13.01.030(b)
  • Applied for through eTRAKiT as Permit Type: COMMERCIAL, Sub-Type: CHANGE OF OCCUPANCY; the Town defines this sub-type as 'a change in the occupancy classification,' after which a Certificate of Occupancy is issued, per the Town's Change of Occupancy plan submittal guide
  • One complete, stamped plan set is required: architectural (floor, roof, schedules, sections), structural (with calculations if any revisions), mechanical stamped by a Colorado-licensed engineer, and plumbing stamped by a Colorado-licensed engineer (see C.R.S. 12-4-101 on engineer stamping requirements)
  • A Project Manual, if used, must be submitted complete and stamped
  • An energy analysis (COMcheck) covering both the electrical and mechanical portions is required; a Mechanical COMcheck is specifically required if additional HVAC units are installed
  • The Town's Obtaining Permits page groups 'Change of Occupancies' together with new buildings, tenant finishes, remodels, and multi-family projects under the same published plan-review timeline

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee (valuation-based, Table 3.1)Parker Administrative Code Fees, Table 3.1 (within the Town's Development-Related User Fee Schedule, effective January 1, 2025; figures visually verified against the published table, and match the Town's separately-published Fee Valuation Schedule effective June 15, 2020). For change-of-occupancy and other non-new-building commercial permits, valuation is the value of the permitted work as stated by the applicant — see the residential-building-permit and commercial-building-permit entries in this file for the full tier breakdown. Unlike a new commercial building, a change of occupancy does not carry the $0.68/sq ft excise tax.
Uses the same Table 3.1 valuation schedule as other commercial permits, e.g. $1.00-$500.00 valuation = $23.50, scaling up through $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that
Plan Review FeeTown of Parker Fee Valuation Schedule / Parker Administrative Code Fees
65% of the Building Permit Fee
Plan Check DepositTown of Parker Building Permit Fees page; consistent with the deposit structure used for other commercial permit sub-types
50% of the estimated plan review fee, due at first submittal
South Metro Fire Rescue — Change of Use fire-safety review (separate from the Town's Building Permit)South Metro Fire Rescue 'Systems and Other Fees,' Miscellaneous Fees section, 'Change of Use' line item (effective January 1, 2025 page of the same fee document; visually verified). This is SMFR's own fire-code life-safety review fee and is separate from, and in addition to, the Town's Building Permit fee above.
$174.24 plan check + $413.75 inspection = $587.99 total

Review timeline

Plan reviewParker’s published plan-review target
14–28 business days

How long did your Change of Occupancy (Change of Use) Permit permit actually take in Parker?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection / Certificate of Occupancy

    Final inspection confirms the space complies with the new occupancy classification; a Certificate of Occupancy is issued once approved

See the full Parker inspection guide — scheduling & re-inspection fees →

Tips

  • Parker does not have a separate 'Change of Use Permit' ordinance the way some Colorado municipalities do — a change of use is processed as a Building Permit, Sub-Type: CHANGE OF OCCUPANCY, under LDO Sec. 13.01.030(b), so apply through eTRAKiT's standard commercial Building Permit path and select that sub-type.
  • A change of occupancy can also trigger a separate South Metro Fire Rescue 'Change of Use' fire-safety review and fee ($587.99 total as of SMFR's fee schedule) — budget for both the Town's Building Permit fee and SMFR's review where fire-code-regulated occupancy changes are involved.
  • The Town's own Change of Occupancy plan submittal guide still cites a 2015-era code list (2015 IBC, 2014 NEC, etc.) even though the Town's currently adopted codes are newer — confirm the applicable code edition with the Building Division (303.841.1970) rather than relying on the checklist's cited editions.

Frequently asked questions

Parker requires a change of occupancy (change of use) permit for: It is unlawful to change the use of any building or other structure without first obtaining a Building Permit from the Town, per LDO Sec. 13.01.030(b); Applied for through eTRAKiT as Permit Type: COMMERCIAL, Sub-Type: CHANGE OF OCCUPANCY; the Town defines this sub-type as 'a change in the occupancy classification,' after which a Certificate of Occupancy is issued, per the Town's Change of Occupancy plan submittal guide; One complete, stamped plan set is required: architectural (floor, roof, schedules, sections), structural (with calculations if any revisions), mechanical stamped by a Colorado-licensed engineer, and plumbing stamped by a Colorado-licensed engineer (see C.R.S. 12-4-101 on engineer stamping requirements); A Project Manual, if used, must be submitted complete and stamped; An energy analysis (COMcheck) covering both the electrical and mechanical portions is required; a Mechanical COMcheck is specifically required if additional HVAC units are installed; The Town's Obtaining Permits page groups 'Change of Occupancies' together with new buildings, tenant finishes, remodels, and multi-family projects under the same published plan-review timeline. If your project isn't listed, confirm with Town of Parker Building Division (Community Development Department) at 303-841-1970 before starting work.

In Parker, the published Building Permit Fee (valuation-based, Table 3.1) is: Uses the same Table 3.1 valuation schedule as other commercial permits, e.g. $1.00-$500.00 valuation = $23.50, scaling up through $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Plan Check Deposit — 50% of the estimated plan review fee, due at first submittal; South Metro Fire Rescue — Change of Use fire-safety review (separate from the Town's Building Permit) — $174.24 plan check + $413.75 inspection = $587.99 total. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The Town's Obtaining Permits page lists 'Change of Occupancies' under its general timeline: a 3-5 day completeness review, then an initial plan review of about 2 to 4 weeks depending on volume, with re-review generally taking about 2 more weeks if needed.

You'll need: Building Permit Application (eTRAKiT) — Permit Type: COMMERCIAL, Sub-Type: CHANGE OF OCCUPANCY; Change of Occupancy Plan Submittal Guide. See the required-documents checklist on this page for details on each.

Parker requires 1 inspection(s) for a change of occupancy (change of use) permit, in order: Final Inspection / Certificate of Occupancy. Schedule each through Town of Parker Building Division (Community Development Department) (303-841-1970).

Apply through Town of Parker Building Division (Community Development Department) at 20120 E. Mainstreet, Parker, CO 80138. Phone: 303-841-1970, email: building@parkerco.gov. Office hours: Monday-Friday, 8 a.m.-5 p.m. Inspection requests called in prior to 4 p.m. are performed the following business day; roofing inspections occur 8 a.m.-12 p.m., no same-day requests.. Official information: https://www.parkerco.gov/114/Building-Division.

Parker, Colorado has adopted: Town of Parker is in transition: full enforcement of the 2024 International Codes begins June 30, 2026, in conjunction with the Colorado Model Electric Ready and Solar Ready Code. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; 2024 International Building Code (IBC) — effective June 30, 2026; 2024 International Residential Code (IRC) — effective June 30, 2026; 2024 International Plumbing Code (IPC) — effective June 30, 2026 (note: Parker uses the IPC, not the Uniform Plumbing Code); 2024 International Mechanical Code (IMC) — effective June 30, 2026; 2024 International Fuel Gas Code (IFGC) — effective June 30, 2026; 2024 International Fire Code — effective June 30, 2026; 2024 International Energy Conservation Code (IECC) — effective June 30, 2026; 2024 International Existing Building Code — effective June 30, 2026; 2024 Non-Residential Property Maintenance Code — effective June 30, 2026; 2024 International Swimming Pool and Spa Code — effective June 30, 2026; Parker Administrative Code (2024 edition, local amendments to the above) — effective June 30, 2026; 2025 Colorado Wildfire Resiliency Code (CWRC) — adopted per Town of Parker Building Codes page; 2025 Colorado Model Electric Ready and Solar Ready Code — adopted alongside the 2024 I-Codes; 2023 National Electrical Code (NEC) remains in effect through December 31, 2026; the 2026 NEC takes effect January 1, 2027. Source: Town of Parker Building Codes page, https://www.parkerco.gov/445/Building-Codes; Roofing-specific current code reference (per the Town's own Re-Roofing Requirements handout, revised 3/14/2025, which predates the 2024 I-Code transition): 2021 IRC (Residential) and 2021 IBC (Commercial and Multi-Family). Source: https://www.parkerco.gov/DocumentCenter/View/738; Colorado has no statewide mandatory building code for most jurisdictions (home-rule authority). Parker's own adopted codes, amendments, and effective dates as listed above are the governing figures; always confirm current status directly with the Building Division given the June 30, 2026 code-transition date. Source: Colorado Energy Office, Building Energy Codes Toolkit, https://energyoffice.colorado.gov/building-energy-codes-toolkit. Local amendments apply — see the Parker overview page for the full list.

Not as a stand-alone ordinance. LDO Sec. 13.01.030(b) requires a Building Permit before changing the use of any building or structure, and the Building Division processes this as a COMMERCIAL permit, Sub-Type: CHANGE OF OCCUPANCY, resulting in a new Certificate of Occupancy.